Back to search

Monterey, California. Naval Postgraduate School

Suitability of MRP II to material planning for component repair at Naval Aviation Depot, North Island.

Abstract

dc:description.abstract

Manufacturing Resource Planning (MRP II) is being implemented at Naval Aviation Depot, North Island (NADEP NI) to combat chronic material deficiencies. MRP II is a planning tool designed for scheduling manufacturing activities with known demand. NADEP NI is a job shop component repair facility with component forecast error ranging up to 800 percent, making the suitability of MRP II questionable. This research studies material planning at NADEP NI to identify forecast error, probability of part replacement error, and material lead-time variability in order to make recommendations for success in implementing MRP II. Fifteen percent of requisitions for work-in-process components are between one and two years old. If lead-times are reduced to a maximum of one year, the planning horizon can be reduced. Work-in-process inventories can also be reduced by 2.3 million dollars based on 26 components sampled from the top revenue generators. Currently material is ordered five weeks prior to the repair quarter. Ordering material when the forecast is generated can reduce work-in-process inventories by 6.2 million dollars for the sample components

Degree

thesis:*
Name thesis:degree_name
M.S. in Management
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Management
Grantor dc:publisher
Monterey, California. Naval Postgraduate School
Year dc:date.issued
1998

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • O'Brien, Timothy J.
Advisors dc:contributor.advisor
  • Fields, Paul J.
  • Kang, Keebom

Rights

dc:rights
Statement dc:rights
  • Approved for public release; distribution is unlimited.

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/9040

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-21
Source record
OAI-PMH GetRecord
related terms
citation

O'Brien, Timothy J.. Suitability of MRP II to material planning for component repair at Naval Aviation Depot, North Island.. Masters thesis, Monterey, California. Naval Postgraduate School, 1998. https://hdl.handle.net/10945/9040