Short-Term and Creep Evaluation of Buried Modular Polymer Stormwater Structures with Full-Scale Physical Modelling

Abstract

dc:description.abstract

Full-scale physical modelling was conducted to examine the short-term and creep response of modular polymer stormwater collection structures under shallow and deep burial. No limiting state was observed when the structure was buried away from the edge of an installation under shallow cover soil and subjected to sustained design-truck loading for one week. The one-week creep buckling resistance was found to be four times greater than the factored column demand. Unconstrained components showed more severe creep deformation than those when buried. Platen bending deflection increased by 3.0 to 3.4 times for unconstrained creep, compared with 1.04 to 1.26 times when buried. When the structure was buried at the edge of an installation and subjected to short-term deep burial loading of up to 300 kPa vertical pressure, tensile strain in the edge columns from bending reached only 10% of the short-term yield strain. The largest inferred column force was 22.6 kN, which was 50% of the short-term buckling resistance. Under longer-term simulated deep burial loading for locations away from the edge, the governing limit state appears to be tensile strain of the upper platen. The maximum platen tensile strain after 100 days under 50 kPa pressure was found to be less than -1.5% (less than the short-term yield strain) and occurred at mid-span between corner columns on the bottom surface of the platen. Physical modelling in a larger scale apparatus (deep burial pit) with real soil material confirmed the findings from the simulated deep burial loading (biaxial cell) for the upper platen under deep burial conditions. Strain in the edge columns was found to be influenced by bending during side fill placement and compression from the top fill overburden. Bending effects dominated during initial side filling, but as overburden pressure increased, compression became the governing mechanism, leading to a peak and subsequent reduction in tensile strain after 0.6 m of cover soil placement. Over 90 days at 2.4 m burial, no additional column tensile strain developed, as compression creep under vertical load offset any incremental tension from lateral deformation.

Degree

thesis:*
Department dc:contributor.department
Civil Engineering
Grantor
Queen's University at Kingston
Year dc:date.issued
2026

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Zarpeima, Arian
Advisor dc:contributor.supervisor
  • Brachman, Richard

Subjects

dc:subject × 5

Rights

dc:rights
Statement dc:rights
  • Attribution 4.0 International
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/1974/36163

Chain of custody

source
Harvested from
Queens University
Base URL
qspace.library.queensu.ca/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

Zarpeima, Arian. Short-Term and Creep Evaluation of Buried Modular Polymer Stormwater Structures with Full-Scale Physical Modelling. Queen's University at Kingston, 2026. https://hdl.handle.net/1974/36163