University of British Columbia
Cut-off grade optimization of open pit mines with multiple processing streams
Abstract
dc:descriptionIn this study, dynamic cut-off grades and multiple processing streams are used to maximize the value of a mining project based on a finite resource. Optimal cut-off policies are generated using Lane’s method for determining cut-off grade. By maximizing the present value of future profits as a function of cut-off grade, mine project value is increased over the traditional break-even approach. A method for determining multiple cut-off grades at a single deposit was applied to analyze the impact that changes in processing capacity have on NPV. It was found that additional capacity related to a separate mill facility resulted in an economic reclassification of ore and waste. Grade tonnage data used in the case study was simulated to represent the geologic uncertainty associated to low-grade mineral deposits. Results from the hypothetical case study examined in this thesis reveal that a low-grade open pit gold mine will benefit from the use of multiple processing streams when a dynamic cut-off policy is applied. Particularly, when incorporating a “high grade” modular processing stream to maximize the potential revenue of the mineralized material. This means that for a given set of design, production and geological parameters, the classification of ore and waste is what ultimately determines the NPV of a mining project.
Degree
thesis:*- Name thesis:degree_name
- Master of Applied Science - MASc
- Level thesis:degree_level
- master's
- Discipline thesis:degree_discipline
- Mining Engineering
- Grantor dc:publisher
- University of British Columbia
- Year dc:date
- 2017
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Pettingell, Michael Nash
Rights
dc:rights- Statement dc:rights
-
- Attribution-NonCommercial-NoDerivatives 4.0 International
- Language dc:language
- eng
Identifiers
dc:identifier.*- Handle dc:identifier
- http://hdl.handle.net/2429/62853