Abstract
dc:description.abstractThe feasibility of constructing a dam on the East Fork of the Carson River is investigated and a design proposal is presented. Site geology, seismic hazards, economic and environmental impacts, and cost are considered. Site geology is identified using the results of previous studies and data from USDA surveys in addition to field observations. Resources made available by the USGS determine the seismic hazards, including peak ground acceleration, which affect the site. In addition to providing flood control for the Carson Valley, the increased water storage will be economically beneficial to farming and the general community in Carson Valley. The maximum water storage capacity of the proposed reservoir is estimated. Based on geologic and seismic considerations, a decked rockfill dam with a concrete face is proposed. Stability calculations for the design have been computed using Rocscience Slope 7.0. Seismic loading has been simulated and a minimum factor of safety is presented. A cost estimate for the project is presented based on previously completed projects of a similar scale.
Degree
thesis:*- Name thesis:degree_name
- Geological Engineering
- Level thesis:degree_level
- Honors Thesis
- Department thesis:degree_department
- Geological Sciences and Engineering
- Grantor
- University of Nevada, Reno
- Year dc:date.issued
- 2017
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Lorincz, Lilian
- Advisor dc:contributor.advisor
-
- Watters, Robert
Rights
dc:rights- Statement dc:rights
-
- Creative Commons Attribution 4.0 United States
- Author(s)
- Language dc:language.iso
- en_US, English
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- http://hdl.handle.net/11714/1887