Back to search

North Texas State University

The Impact of the Cost Schedule Control Systems Criteria on Electronics and Aerospace Contractors

Abstract

dc:description

The primary purpose of this study was to analyze the capability and inclination of the aerospace and electronics industry contractors to abide by the general provisions of the Cost/Schedule Control Systems Criteria (C/SCSC).

Degree

thesis:*
Grantor dc:publisher
North Texas State University
Year dc:date
1970

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Richardson, Gary Lowell
Contributors dc:contributor
  • Hays, Henry
  • Maher, Laurence P.
  • Griffith, Reynolds
  • Melton, R. B. (Rosser B.)

Subjects

dc:subject × 5

Rights

dc:rights
Statement dc:rights
  • Public
  • Copyright
  • Copyright is held by the author, unless otherwise noted. All rights reserved.
  • Richardson, Gary Lowell
Language dc:language
English

Identifiers

dc:identifier.*
Identifier
call-no: 379 N81d no.429
local-cont-no: nd_00429
untcat: b1569193
ark: ark:/67531/metadc277777

Chain of custody

source
Harvested from
University of North Texas
Base URL
digital.library.unt.edu/oai/
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

Richardson, Gary Lowell. The Impact of the Cost Schedule Control Systems Criteria on Electronics and Aerospace Contractors. North Texas State University, 1970. https://digital.library.unt.edu/ark:/67531/metadc277777/