North Texas State University
A Study of the Factors Related to Planned and Actual Manufacturing Lead Time in Two Environments: (1) High-Volume Continuous-Production and (2) Job-Shop Production-to-Order
Abstract
dc:descriptionThis study focused upon the manufacturing lead time management in California's electrical and electronic machinery, equipment, and supplies industry. Manufacturing firms with one hundred or more employees were invited to participate in the research. Six subproblems relating to manufacturing lead time were selected and six appropriate null hypotheses were tested. The subproblems identified (1) factors influencing manufacturing lead time, (2) production planning processes influencing manufacturing lead time accuracy, and (3) techniques reducing manufacturing lead time. These factors, production planning processes, and techniques were then IV investigated to determine the importance of each of them in two environments: (1) high-volume continuous-production (HVCP) and (2) job-shop production-to-order (JSPTO).
Degree
thesis:*- Grantor dc:publisher
- North Texas State University
- Year dc:date
- 1980
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Moshtaghi Moghaddam, Jahanguir
- Contributors dc:contributor
-
- Bimmerle, Charles F.
- Hays, Henry
- Spalding, John Barney
- Garnett, Hugh B.
- Dunn, J. D., 1928-
Subjects
dc:subject × 7Rights
dc:rights- Statement dc:rights
-
- Public
- Moshtaghi Moghaddam, Jahanguir
- Copyright
- Copyright is held by the author, unless otherwise noted. All rights reserved.
- Language dc:language
- English
Identifiers
dc:identifier.*- Identifier
-
local-cont-no: 1002782915-Moghaddam
call-no: 379 N81 no. 1660
untcat: b1218608
oclc: 7926421
ark: ark:/67531/metadc331251