Rehabilitation of Precast Deck Panel Bridges

Abstract

dc:description

USF completed a research study in 2005, which prioritized the replacement of 85 deteriorating composite precast deck panel bridges. This thesis re-evaluates the original recommendations in the wake of failures of two of these bridges in 2007. Since funding will not allow all identified bridges to be replaced, it was necessary to determine the most effective repair methods. To assess USF’s recommendations, a forensic study was undertaken in which the most current inspection and work program documents on the two failed bridges were reviewed and FDOT personnel interviewed. The best repair procedures were determined by reviewing repair plans, specifications, reports and site visits. The study found the two bridges that failed had been correctly prioritized by USF (No. 1 of 18 and No. 8 of 15). A new, accelerated repair method encompassing complete bay replacement was developed in a pilot project funded by the Florida Department of Transportation.

Degree

thesis:*
Level thesis:degree_level
Thesis
Discipline thesis:degree_discipline
Civil and Environmental Engineering
Grantor
University of South Florida
Year dc:date
2010

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Alvi, Atiq H.
Contributors dc:contributor
  • Rajan Sen, Ph.D.
  • William Carpenter, Ph.D.
  • Gray Mullins, Ph.D.

Subjects

dc:subject × 7

Rights

Language dc:language
EN-US

Identifiers

dc:identifier.*
Repository record dc:identifier
https://digitalcommons.usf.edu/etd/3581

Chain of custody

source
Harvested from
University of South Florida
Base URL
digitalcommons.usf.edu/do/oai/
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

Alvi, Atiq H.. Rehabilitation of Precast Deck Panel Bridges. Thesis thesis, University of South Florida, 2010. https://digitalcommons.usf.edu/etd/3581