• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 4
  • 3
  • Tagged with
  • 7
  • 7
  • 7
  • 4
  • 3
  • 3
  • 3
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

SCHEDULING ROTARY INJECTION MOLDING MACHINE

Urs, Shravan B. R. January 2005 (has links)
No description available.
2

Optimization of Large-Scale Single Machine and Parallel Machine Scheduling / Large-Scale Single Machine and Parallel Machine Scheduling in the Steel Industry with Sequence-Dependent Changeover Costs

Lee, Che January 2022 (has links)
Hundreds of steel products need to be scheduled on a single or parallel machine in a steel plant every week. A good feasible schedule may save the company millions of dollars compared to a bad one. Single and parallel machine scheduling are also encountered often in many other industries, making it a crucial research topic for both the process system engineering and operations research communities. Single or parallel machine scheduling can be a challenging combinatorial optimization problem when a large number of jobs are to be scheduled. Each job has unique job characteristics, resulting in different setup times/costs depending on the processing sequence. They also have specific release dates to follow and due dates to meet. This work presents both an exact method using mixed-integer quadratic programming, and an approximate method with metaheuristics to solve real-world large-scale single/parallel machine scheduling problems faced in a steel plant. More than 1000 or 350 jobs are to be scheduled within a one-hour time limit in the single or parallel machine problem, respectively. The objective of the single machine scheduling is to minimize a combined total changeover, total earliness, and total tardiness cost, whereas the objective of the parallel machine scheduling is to minimize an objective function comprising the gaps between jobs before a critical time in a schedule, the total changeover cost, and the total tardiness cost. The exact method is developed to benchmark computation time for a small-scale single machine problem, but is not practical for solving the actual large-scale problem. A metaheuristic algorithm centered on variable neighborhood descent is developed to address the large-scale single machine scheduling with a sliding-window decomposition strategy. The algorithm is extended and modified to solve the large-scale parallel machine problem. Statistical tests, including Student's t-test and ANOVA, are conducted to determine efficient solution strategies and good parameters to be used in the metaheuristics. / Thesis / Master of Applied Science (MASc)
3

[en] A METAHEURISTIC FOR THE PIPE LAYING SUPPORT VESSELS SCHEDULING PROBLEM / [pt] UMA METAHEURISTICA PARA O PROBLEMA DE ESCALONAMENTO DE PIPE LAYING SUPPORT VESSELS

DAVI ZERPINI MECLER 24 August 2020 (has links)
[pt] Este trabalho tem como objetivo propor uma metaheurística Iterated Local Search para minimizar o tempo de término ponderado de jobs em problemas de escalonamento de máquinas idênticas paralelas. O objetivo secundário do trabalho é propor uma solução prática para um problema real da companhia estudada em questão. A motivação para o trabalho consiste em uma aplicação prática na indústria de óleo e gás, onde os navios PLSV realizam operações em poços de forma ordenada e visando a antecipação dos poços de petróleo mais produtivos. As características do problema, tais quais: elegibilidade entre navio e operações, tempos de setup relativos à família de atividades, associações entre operações e poços e setups que dependem da chegada de material se adequam a modelagem baseada em escalonamento de máquinas paralelas idênticas. No trabalho uma introdução à respeito do tema é apresentada, em seguida é feita uma revisão da literatura sobre problemas de máquinas paralelas idênticas, a formulação matemática com a descrição do problema é apresentada, a metodologia contemplando representação da solução, heuristica construtiva, vizinhanças exploradas, busca local e Iterated Local Search é exposta, por fim são apresentados os resultados do método e as conclusões sobre o trabalho. / [en] This work objective is to propose an Iterated Local Search metaheuristic to minimize the weighted completion time of jobs on identical parallel machines scheduling problems. The secondary objective of this work is to propose a practical solution to the real problem of the studied company. The motivation of this work consists on a practical application in the Oil and Gas industry, where the PLSV vessels perform ordered operations in a set of wells aiming to maximize the oil production. The characteristics of the problem such as: eligibility between vessels and operations, setup times related to the family of activities, association between operations and wells and setup times depending on the material arrival fit well the identical parallel machine schedule modelling. In this work, an introduction about the theme is presented, followed by a literature review on identical parallel machine scheduling problems, the mathematical formulation with the problem description is presented, the methodology, including the solution representation, constructive heuristic, neighborhood structures, local search and Iterated Local Search is exposed, at last, the method results and conclusions of the work are summarized.
4

Three Essays in Parallel Machine Scheduling

Garg, Amit January 2008 (has links)
No description available.
5

[en] RESCHEDULING OF OIL EXPLORATION SUPPORT VESSELS WITHIN A METAHEURISTIC APPROACH / [pt] REPROGRAMAÇÃO DE EMBARCAÇÕES DE APOIO À EXPLORAÇÃO DE PETRÓLEO ATRAVÉS DE UMA ABORDAGEM METAHEURÍSTICA

VICTOR ABU-MARRUL CARNEIRO DA CUNHA 09 August 2017 (has links)
[pt] A dissertação aborda um problema real de reprogramação de uma frota de embarcações do tipo PLSV (Pipe Laying Support Vessel), responsáveis pelas interligações de poços petrolíferos submarinos. O cronograma de curto prazo dessas embarcações está sujeito à inúmeras incertezas inerentes às operações realizadas, acarretando em ociosidade nas embarcações ou postergações na produção de petróleo, que podem resultar em prejuízo de milhões de reais. Uma metaheurística ILS (Iterated Local Search) é proposta para atender a frequente demanda por reprogramações dos PLSVs. O método é composto de uma fase inicial de viabilização, para tratar potenciais inconsistências nas programações. Na sequência, iterativamente, são realizadas perturbações na solução por meio de movimentos de swap e aplicada uma busca local baseada na vizinhança insert, a fim de fugir de ótimos locais e encontrar soluções que aprimorem o cronograma. Foram feitos experimentos com diferentes parâmetros e critérios do ILS, sendo definidas duas abordagens aplicadas a dez instâncias oriundas de uma programação real de PLSVs. A partir de uma função de avaliação, capaz de medir o impacto operacional na programação, o ILS proporcionou uma melhoria média nos cronogramas acima de 91 por cento, quando comparados aos cronogramas originais. As soluções foram obtidas em um tempo computacional médio de 30 minutos, aderente ao processo da companhia. Em função dos resultados alcançados, o método provou ser uma boa base para uma ferramenta de apoio à decisão para a reprogramação dos PLSVs. / [en] This dissertation addresses a real-life rescheduling problem of a Pipe Laying Support Vessels (PLSVs) fleet, in charge of subsea oil wells interconnections. The short-term schedule of these vessels is subject to uncertainties inherent to its operations, resulting in ships idleness or delays in oil production, which may lead to losses of millions of Brazilian Reais. A method based on the ILS (Iterated Local Search) metaheuristic is proposed to meet the frequent demand of PLSVs rescheduling. The first step of this method aims to find a feasible initial solution from an incoming schedule with potencial inconsistencies. The following steps consists in, iteratively, performing a perturbation on a solution through swap movements and applying a local search based on the insertion neighborhood, in order to escape from local optimal and find better solutions. Extensive preliminary experiments were conducted considering different ILS parameters setups. The two most performing setups were selected and applied to ten instances of a real PLSV schedule. Taking into account an objective function that measures the operational impact on schedules, the ILS provided an average improvement above 91 percent in schedules when compared to the original planning. These solutions were obtained in an average computational time of 30 minutes, which fits in the company process. The obtained results showed that the proposed method might be a basis for a decision support tool for the PLSVs rescheduling problem.
6

HIBRIDIZAÇÃO DE MÉTODOS EXATOS E HEURÍSTICOS PARA RESOLUÇÃO DE PROBLEMAS DE OTIMIZAÇÃO COMBINA / HYBRIDIZATION OF EXACT AND HEURISTIC METHODS TO SOLVE COMBINATORIAL OPTIMIZATION PROBLEM

Stefanello, Fernando 04 March 2011 (has links)
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / The evolution of computer hardware as well as new applications of mathematical programming techniques, efficiently implemented in many commercial solvers, has given rise to new algorithms called hybrid metaheuristic, which have been applied to solve combinatorial problems. This work presents several approaches which try to deal with the hybridization of local search based metaheuristics with exact algorithms to solve two problems of combinatorial optimization. More specifically, the first problem, capacitated p-median problem, the proposed approach considers heuristic elimination of variable of the original mathematical model, that produce solutions of very good quality in a short amount of time, and a combination with an iterative procedure in which only a certain subset of points is considered. As regards the second problem, unrelated parallel machine scheduling with sequence and machine dependent setup time problem of minimizing makespan, is proposed a mathematical model to search the neighborhood of a solution and identify movement sequences to minimize the objective function. In both cases, mathematical models are solved using a commercial solver. Extensive computational experiments are carried out to demonstrate the good performance of the proposed approaches. / A recente evolução dos computadores como também dos métodos exatos oriundos da programação matemática, muitos destes eficientemente implementados em otimizadores comerciais, propiciou o surgimento de novos algoritmos, denominados metaheurísticas híbridas, que têm sido aplicados para resolução de problemas combinatoriais. Este trabalho apresenta abordagens que hibridizam metaheurísticas baseadas em busca local com algoritmos exatos de programação matemática para resolver dois problemas de otimização combinatória. Mais especificamente, para o primeiro problema, o problema das p-medianas capacitado, a proposta considera a eliminação heurística de variáveis do modelo matemático, que permite a obtenção de soluções de boa qualidade em um curto tempo computacional, e a combinação com um procedimento iterativo no qual apenas um determinado subconjunto de pontos é considerado. No que se refere ao segundo problema, programação de tarefas em máquinas paralelas não relacionadas com tempo de preparação dependente da sequência e da máquina com objetivo de minimizar o tempo de processamento total da máquina com maior carga entre todas (makespan), propõe-se um modelo matemático para varrer a vizinhança de uma solução e identificar sequências de movimentos de tarefas que podem ser aplicadas na respectiva solução de modo a minimizar a função objetivo. Nos dois casos os modelos matemáticos são resolvidos utilizando um otimizador comercial. Extensivos testes computacionais são realizados para demonstrar o bom desempenho das abordagens propostas.
7

[en] BUCKET-INDEXED FORMULATION: A NEW APPROACH TO SOLVE PARALLEL MACHINE SCHEDULING PROBLEM / [pt] FORMULAÇÃO BUCKET-INDEXED: UMA NOVA ABORDAGEM PARA RESOLVER O PROBLEMA DE PROGRAMAÇÃO DE MÁQUINAS PARALELAS

LUANA MESQUITA CARRILHO 20 December 2019 (has links)
[pt] A programação de máquinas é um processo de tomada de decisão que desempenha um importante papel na maioria das indústrias de manufatura e serviços. Esta dissertação aborda o problema de programação de máquinas paralelas idênticas sem preempção, considerando características da programação de data de liberação e data limite para execução do início das tarefas, restrição de precedência entre pares de tarefas, elegibilidade e disponibilidade de máquinas. Para resolver este problema, uma formulação de programação linear inteira mista é proposta. O novo modelo, chamado de bucket-indexed (BI), particiona o horizonte de planejamento em períodos de tempos de mesmo tamanho (buckets). O tamanho dos buckets é um par âmetro que varia de acordo com a instância e influencia o porte do modelo, podendo assumir valores entre 1 e o menor tempo de processamento das tarefas. Quanto maior o tamanho do bucket, menor é o número de buckets criados e, consequentemente, menor o porte do modelo. A formulação proposta é testada em instâncias reais referentes ao problema de programação de sondas para construção de poços de petróleo de uma indústria brasileira de óleo e gás. A fim de avaliar os resultados obtidos pela formulação BI, a formulação clássica time-indexed (TI) foi também implementada para comparação dos tempos computacionais e qualidade da solução. Os resultados da formulação proposta apontam um melhor desempenho nas instâncias testadas, reduzindo o tempo computacional em todos os casos e resolvendo instâncias de grande porte não resolvidas pela formulação TI. / [en] Machine scheduling is a decision-making process that plays an important role in most manufacturing and service industries. This dissertation tackles a nonpreemptive identical parallel machine scheduling problem, considering release dates, deadlines, precedences, eligibility, and machine availability constraints. To solve this problem, a mixed-integer linear programming formulation is proposed. The new model, called bucketindexed, partitions the planning horizon in periods of equal length (buckets). The bucket size is a parameter which varies according to instances and influences the model size, assuming values between 1 and the shortest processing time of jobs. The larger the bucket size, the smaller is the number of buckets created and, consequently, the smaller the model size. The proposed formulation is tested in real instances of the rig scheduling problem for a Brazilian oil and gas industry. To evaluate the results obtained by the BI formulation, the classical time-indexed (TI) formulation was also implemented for comparison of computational times and solution quality. The results of the proposed formulation highlight a better performance in all the tested instances, reducing computational time in all cases and solving large instances unsolvable by the TI formulation.

Page generated in 0.0676 seconds