Spelling suggestions: "subject:"[een] PERFORMANCE MEASUREMENT"" "subject:"[enn] PERFORMANCE MEASUREMENT""
251 |
Die Performance von öffentlichen Unternehmen am Beispiel von Wohnungsunternehmen in Deutschland /Hain, Mathias. January 2008 (has links)
Zugl.: Frankfurt (Oder), Universiẗat, Diss., 2008.
|
252 |
Strategisches Kundenbindungsmanagement : Modellrahmen und empirische Evidenz auf Basis einer kausalanalytischen Untersuchung in der Mineralölindustrie /Feistel, Matthias S. G. January 2008 (has links)
Zugl.: Hamburg, Universiẗat, Diss., 2008.
|
253 |
Management der Vertriebsstärke von BankenNirschl, Marco January 2008 (has links)
Zugl.: Regensburg, Univ., Diss., 2008
|
254 |
Internes Marketing in Dienstleistungsnetzwerken Konzeption und ErfolgsmessungMichaelis, Manuel January 2009 (has links)
Zugl.: Münster (Westfalen), Univ., Diss., 2009
|
255 |
Infrastrukturinvestitionen : Profil einer neuen Anlageklasse in Theorie und Praxis /Heid, Manfred. January 2009 (has links)
Zugl.: Köln, Fachhochsch., Diplomarbeit.
|
256 |
Stakeholder performance reporting von Nonprofit-Organisationen : Grundlagen und Empfehlungen für die Leistungsberichterstattung als stakeholderorientiertes Steuerungs- und Rechenschaftslegungsinstrument /Stötzer, Sandra. January 2009 (has links)
Zugl.: Linz, Universiẗat, Diss., 2009.
|
257 |
Airport performance measurement : Kennzahlensystem zur Analyse und Bewertung von Flughafenprozessen /Dietman, Nils von. January 2008 (has links)
Zugl.: Berlin, Techn. Universiẗat, Diss., 2008.
|
258 |
The efficiency of the container shipping industry and the development of a performance measurement systemOlivier, Taryn Lynn 03 1900 (has links)
Thesis (MScEng)--Stellenbosch University, 2012. / ENGLISH ABSTRACT: An efficient container shipping industry is something every country strives toward. Continuous
improvement in this industry is of utmost importance in order to grow a country’s economy. One
of the objectives of this research study is to determine the inefficiencies that exist within the
South African container shipping industry. A lot of these inefficiencies cannot be eliminated by a
single organisation, but require the cooperation of all the parties in a supply chain.
Currently there is not enough interaction between the organisations in the supply chain apart from
limited contact with direct customers and suppliers. The aim of the performance measurement
system is to drive organisations throughout the supply chain to focus on the areas that require the
most improvement. If inefficiencies are identified, the parties concerned should jointly come up
with action plans to address these inefficiencies. This research study will focus mostly on the
Cape Town region.
The performance measurement system (PMS) developed in this study can be used to improve
supply chain efficiency. Existing PMSs were researched in order to develop a system that is
applicable to the container industry. Research of the industry was done with the aid of
questionnaires, interviews, surveys and a focus group.
The benefits of such a system should be carefully explained to representatives of the
organisations in the industry to attract their participation. The success of the system is highly
dependent on how well the parties in the supply chain participate, as it is only then that the
efficiency of a supply chain can be measured. Management representatives were asked to indicate
which key performance indicators they are measuring. This information was used as a basis for
the study. There are various parties that are currently busy with similar studies, which emphasises
the increased need for a supply chain PMS in the container shipping industry.
Two case studies were identified that will benefit from a PMS. BMW’s manufacturing plant in
Rosslyn and the fruit export industry in the Cape Town region were used as examples of
integrated supply chains. The PMS can be easily adapted in order to apply it to other corridors or
commodities. / AFRIKAANSE OPSOMMING: ‘n Doeltreffende houer verskepingsindustrie is iets waarna elke land streef. Konstante
verbeterings in die industrie is baie belangrik vir ‘n land se ekonomie. Een van die doelwitte van
hierdie navorsingsprojek is om te bepaal wat die ondoeltreffendhede in die houer
verskepingsindustrie is. Baie van hierdie ondoeltreffendhede kan nie deur een organisasie opgelos
of geïlimineer word nie. Dit moet deur die hele voorsieningsketting gesamentlik gedoen word.
Daar is tans te min samewerking tussen organisasies in die voorsieningsketting. In die meeste
gevalle werk organisasies slegs met hulle onmiddelike kliënte en verskaffers. ‘n
Voorsieningsketting meting-stelsel sal verseker dat daar op die regte aspekte gefokus word. As ‘n
ondoeltreffendheid geïdentifiseer word, is dit die verantwoordelikheid van die hele
voorsieningsketting om te verseker dat die ondoeltreffendheid geïlimineer word. Dit sal beslis
samewerking bevorder. Die navorsingsprojek fokus meestal op Kaapstad.
Bestaande meting-stelsels was geondersoek om ‘n stelsel te ontwikkel wat van toepassing is op
die houer verskepingsindustrie. Navorsing was gedoen deur middel van vraelyste, onderhoude,
opnames en ‘n fokusgroep. Die doel van die meting-stelsel is om organisasies regdeur die
voorsieningsketting te dryf om te fokus op die areas wat die meeste verbetering benodig.
Die voordele van die stelsel moet noukeurig aan die bestuursverteenwoordigers van die
organisasies in die voorsieningsketting verduidelik word sodat hulle sal deelneem aan die
inisiatief. Die sukses van die meting-stelsel hang af van hoeveel organisasies sal deelneem. Die
doeltreffendheid van ‘n voorsieningsketting sal eers werklik gemeet kan word as daar ‘n redelike
groot belangstelling vanaf die industrie is. Bestuursverteenwoordigers was gevra om aan te dui
watter prestasie-aanwysers hulle tans meet. Hierdie inligting was gebruik as ‘n basis vir die
studie. Daar is tans verskeie partye wat besig is met soortgelyke navorsing. Dit beklemtoon die
feit dat ‘n voorsieningsketting meting-stelsel werklik nodig is vir die houer verskepingsindustrie.
Twee gevalle studies was geïdentifeseer dat hulle sal voordeel trek uit die implementering van ‘n
voorsieningsketting meting-stelsel. BMW se Rosslyn voorsieningsketting en die vrugte uitvoer
industrie in Kaapstad was gebruik as voorbeelde van geïntegreerde voorsieningskettings. Die
meting-stelsels kan maklik aangepas word vir ander kommoditeite.
|
259 |
An investigation into the measurement invariance of the performance indexDunbar-Isaacson, Hazel 12 1900 (has links)
Thesis (MComm (Industrial Psychology))--University of Stellenbosch, 2006. / The leadership-for-performance framework designed by Spangenberg and Theron (2004) aspires
to explicate the structural relationships existing between leader competency potential, leadership
competencies, leadership outcomes and the dimensions of organizational unit performance. The
Performance Index (PI) and Leadership Behaviour Inventory (LBI) comprise the leadership-forperformance
range of measures. The PI was developed as a comprehensive criterion measure of
unit performance for which the unit leader could be held responsible. The basic PI structural
model has been developed to explain the manner in which the various latent leadership
dimensions measured by the LBI affect the eight unit performance latent variables that are
assessed by the PI. Although preliminary research suggests the basic PI structural model could be
refined, continued research in this regard can only be justified if the basic PI measurement model
is shown to be measurement invariant across independent samples from the target population. As
part of ongoing research of the leadership-for-performance range of measures, this crossvalidation
study investigated the extent to which the PI measurement model may be considered
measurement invariant across two independent samples from the same population. Two samples
were collected through non-probability sampling procedures and included 277 and 375 complete
cases after imputation by matching. Item analysis and dimensionality analysis were performed on
each of the PI sub-scales prior to the formation of item parcels. No items were excluded based
on item- and dimensionality analysis results. Two composite indicator variables (item parcels)
were created from the items of each sub-scale and were treated as continuous variables in the
subsequent statistical analyses. Structural equation modelling, using robust maximum likelihood
estimation, was used to perform a confirmatory first-order factor analysis on the item parcels for
each sample. The measurement model was fitted to both samples independently and close fit for
each sample was established. The measurement model was cross-validated using a progressive
series of measurement invariance tests. Results indicated the PI measurement model did not
display full measurement invariance across the two samples although it did cross-validate
successfully under the configural invariance condition. Statistically significant non-equivalence
was found to exist in both the measurement error variances and the factor covariances (p<0,05),
although the p<0,05 critical value was only narrowly surpassed in both cases. The measurement
model did, however, display metric invariance across the samples as no significant differences
were found between the factor loadings, suggesting the content of each item is perceived and
interpreted in a similar manner across samples from the target population. When considered in
combination, these results may be viewed as quite satisfactory as they indicate that themeasurement model does not appear to vary greatly when fitted to data from the two samples. As
this study has established at least metric invariance of the PI, it therefore provides some basis of
confidence for proceeding with subsequent research aimed at establishing the structural
invariance of the basic PI structural model and eventually research that links the leadership
behaviour to work unit performance as measured by the PI. Limitations of this study are
discussed.
|
260 |
An investigation into the internal structure of the unit performance construct as measured by the performance index (PI)Henning, Roline 12 1900 (has links)
Assignment (MA)--University of Stellenbosch, 2002 / ENGLISH ABSTRACT: The responsibility for the performance of any organisational unit ultimately lies with the
leadership of the unit. Given this perceived pivotal role of leadership in work unit
performance, the ultimate objective is to capture the nature of the presumed relationship
between leadership and unit performance in a comprehensive structural model. To
validate such a leadership model, however, requires an explanation of the manner in
which the unit performance dimensions affect each other. Spangenberg and Theron
(2002b) developed a generic, standardized unit performance measure (PI) that
encompasses all the unit performance dimensions for which the unit leader could be held
responsible.
The objective of this paper is to investigate the internal structure of the PI in order to
establish the inter-relationships between the eight unit performance latent variables. The
PI consists of 56 questions covering eight dimensions. The validation sample consisted
of 304 completed PI questionnaires. However, after imputation 273 cases with
observations on all 56 items remained in the validation sample. Item analysis and
dimensionality analysis was performed on each of the sub-scales using SPSS.
Thereafter, confirmatory factor analysis was performed on the reduced data set using
LISREL. The results indicated satisfactory factor loadings on the measurement model.
Acceptable model fit was achieved for the measurement model. Subsequently, the
structural model was tested using LISREL. The results provided statistics of good fit.
Only four hypotheses failed to be corroborated in this study.
Conclusions were drawn from the results obtained and suggestions for further research
are made. / AFRIKAANSE OPSOMMING: Die prestasie van enige organisatoriese werkeenheid is die uiteindelike
verantwoordelikheid van die leierskap van die eenheid. Gegewe hierdie waargenome
sleutelrol van leierskap in werkeenheidprestasie, is die uiteindelike doelwit om die aard
van die veronderstelde verwantskap tussen leierskap en eenheidprestasie in 'n
omvattende strukturele model vas te lê. Die validering van so 'n leierskapmodel vereis
egter 'n uiteensetting van die wyse waarop die eenheidprestasie-dimensies mekaar
onderling beïnvloed. Spangenberg en Theron (2002b) het 'n generiese,
gestandaardiseerde eenheidprestasie-meetinstrument (PI) ontwikkel wat al die
eenheidprestasie-dimensies insluit waarvoor die leier van die eenheid verantwoordelik
gehou kan word.
Die doel van hierdie studie is om ondersoek in te stel na die interne struktuur van die PI
ten einde die inter-verwantskappe tussen die agt eenheidprestasie latente veranderlikes
vas te stel. Die PI bestaan uit 56 vrae wat die agt dimensies dek. Die validasiesteekproef
bestaan uit 304 voltooide PI vraelyste. Na vervanging van ontbrekende waardes is die
validasiesteekproef egter gereduseer tot 273 gevalle met waarnemings op al 56 items.
Item-ontleding en dimensieanalise is op elk van die sub-skale met behulp van SPSS
gedoen. Daaropvolgend is bevestigende faktor-analise op die verkorte datastel gedoen
met behulp van LISREL. Die passingstatistieke het hier aanvaarbare resultate opgelewer.
Vervolgens is die strukturele model met behulp van LISRELgetoets. Die resultate het hier
bevredigende passingstatistieke gelewer. Daar kon vir slegs vier hipoteses nie steun
gevind word in die studie nie.
Op grond van die resultate is daar tot bepaalde gevolgtrekkings gekom en daar word
aanbevelings vir verdere navorsing gemaak.
|
Page generated in 0.0372 seconds