• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 1
  • Tagged with
  • 3
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Val av överlastskydd för elektriska ventilmanöverdon på kärnkraftverket i Forsmark

Bajramovic, Azur January 2012 (has links)
At nuclear power plants, electrical valve actuators are important for ensuring that the reactor core is water covered and the pressure in the reactor tank and containment is limited. The electrical actuators are provided with overload protection in case of drawing higher current then the motors are rated for. When safety manoeuvres are needed, the overload protection must not trig and cause the valve to stop before completing the manoeuvre. Analyses have showed that the current settings of the overload protection may cause an illegitimate trig at the worst theoretically possible accident. A new method has been developed with conservative assumptions and applies overload protections for all electrical valve actuators at the three reactors in Forsmark.
2

Selektivplan SCA Bionorr

Eriksson, Mattias January 2019 (has links)
This report presents a project in SCA Graphic Sundsvall AB's with purpose to establish setting values for the protection relays, to achieve selectivity in the plant. The problem with the plant is that the protection relays trigger higher up in the power grid, which result in shutting down a large area of the production instead of triggering the protection relay closest to the fault. This problem may be a result of that the plant have experienced several upgrades and developments over many years, and that the loads in the plant's power grid also been changed, but the protection settings have not been adjusted to the new circumstances.   A protection relay monitors parts of an electrical power system to detect when the pre-set limit values are exceeded. If a fault occurs, surpassing of those limit values enables the protection relay to send a signal to a circuit breaker to open and isolate the faulty components. The protection relays can provide many different types of protection. In this project the following are considered; overload protection, overcurrent protection, and earth fault protection.   The equations used in this report are based on a constant time perspective as a base, which means that a fixed time difference is set between the tripping times of protection relays, which is independent of the function value. Microsoft Excel is used to perform the calculations. To make it easier for the reader of the report to understand how the equations in the report are used, one example of the calculations made for one of the lines is shown.   The calculated results of the setting values for the protection relay and power switches that were requested by SCA are presented in tables. Since few values were provided regarding the previous setting values, it is difficult to compare the previous setting values with the proposed ones. Also, the ratio of the current transformers from previous setting values was unknown, where different sources showed different ratios. However, setting values were determined for both possible ratios for each protection relay, allowing the company to set the protection correctly, once they find the right ratio.   Based on the calculations, the time settings should be changed, so that they trigger in selective order, but also that the current settings values should be set to the new values based on the plant's present components and operating mode. / I denna rapport behandlas ett projekt med syfte att i SCA Graphic Sundsvall AB:s intresse, ta fram inställningsvärden till reläskydden för att uppnå selektivitet i anläggningen. Anläggningen har i dagsläget problem med att reläskydd löser ut högt upp i nätet istället för skyddet närmast det felbehäftande området, vilket leder till att många delar i processen slås ut. Det kan bero på att anläggningen har uppgraderats och utvecklats under många år och att lasterna ansluten till anläggningens elnät ändrats.   Ett reläskydd övervakar delar av ett elkraftsystem för att detektera när de förinställda gränsvärdena överskrids. Om ett fel inträffar, ska gränsvärdena överskridas, så att reläskyddet kan skicka en signal till en brytare för att bryta kretsen och isolera de felaktiga komponenterna. Reläskydden som används kan utgöra många olika typer av skydd. I detta projekt kommer överlastskydd, överströmsskydd, samt jordslutningsskydd behandlas.   Beräkningarna görs utifrån ett konstanttidsfördröjt perspektiv, som innebär att en fast tidsdifferens bestäms mellan skydden, som är oberoende av funktionsvärdet. Microsoft Excel används för att utföra beräkningarna. För att få en förståelse hur ekvationerna i rapporten är använda, ges ett exempel på beräkningarna av skydden i en av linjerna.   Beräknade lämpliga inställningsvärden för reläskydden och effektbrytarna som efterfrågades av SCA redovisas i tabeller. Eftersom få värden fanns tillhanda gällande tidigare inställningsvärden är det svårt att göra en jämförelse för alla inställningar. Även omsättningen på strömtransformatorerna från tidigare inställningsvärden hade tvetydiga uppgifter, där olika källor visade på olika inställningar. Men inställningsvärden togs fram för båda möjliga omsättningar för varje skydd, så att företaget kan ställa in skydden när de tagit reda på rätt omsättning.   Utifrån de beräkningar som gjorts visar resultaten på att dels tidsinställningarna bör ändras så att de löser ut i selektiv ordning, vilket de inte gjorde innan, men även att strömvärdena ställs in till de nya värdena då de är beräknade på anläggningens nuvarande komponenter och driftläge.
3

Requirements and Analysis of an Overload Protection Mechanism for an Electromechanical Linear Actuator / Kravställning och Analys av Skyddsmekanism mot Överlast för Linjärt Elektromekaniskt Ställdon

Vesterberg, Mats January 2022 (has links)
Cascade Drives specializes in high-performance electromechanical linear actuators (EMA). The company has developed a range of linear rack and pinion actuators based on a patented load distribution technique that allows multiple pinions to interact with a single gear rack. A project where one of their EMAs is to be implemented into an excavator boom is about to be initiated. It is suspected that extreme shock loads are present in such applications. The shock loads could potentially cause problems for the structural integrity of the gear train. This master thesis focused on defining requirements for an overload protection mechanism and identifying and evaluating possible solutions that could be implemented into the EMA to protect it from damage. At the start of the thesis, a pre-study had already been conducted. The author found that the forces present during shock loading warrant some protection strategy to be researched and implemented into the EMA. A comprehensive multibody dynamics model (MBD) of the EMA was developed in MSC Adams (View) to validate the result from the pre-study. The MBD model was later expanded to include a torsional stiffness model derived from physical tests and the flexibility of the excavator boom itself, which was extracted from flexible body simulations of the excavator boom assembly in Adams. The expanded MBD model simulations revealed that a protection mechanism was needed in the thought application. Three protection mechanisms/strategies were simulated and evaluated in the MBD environment. A slipping solution in the form of a friction clutch, a disconnecting solution in the form of an electromagnetic clutch, and an active solution in which the electric motor was controlled to produce maximum torque in the opposite direction of motion at the point of impact to dampen the loads through the gear train. Running the motor in reverse at impact proved to be an insufficient strategy. Even for an idealized motor that combined the maximum torque from the strongest motor and the rotational inertia from the lightest motor available for the EMA, simulations resulted in loads above the static load limit through the gear train. The friction clutch was shown to be plausible but inefficient. The slipping torque of a friction clutch had to be detuned way below the static load limit due to the delays in peak torque throughout the gear train, which meant that the overall actuating force of the actuator was severely hampered. The electromechanical disconnecting clutch was proved to be the most promising alternative. The disconnecting clutch completely disengages the upstream components from the downstream components in the drive train, meaning that the overall system performance remained unchanged. The response times needed depended on where the clutch was installed, from around 16ms if only the motor was disengaged up to 17ms if both the motor and the brake were disengaged. Further analysis of triggering strategies and response times has to be conducted to definitely decide if an electromagnetic clutch is a viable option. Still, the result from this thesis shows that it is a promising path. / Cascade Drives är specialiserade på högpresterande elektromekaniska linjära ställdon. Företaget har utvecklat en rad linjära ställdon av kuggstångskonfiguration som bygger på en patenterad lastfördelningsteknik som möjliggör för flera pinjonger att interagera med en enda kuggstång. Ett projekt där ett av deras ställdon ska implementeras i en grävmaskinsbom är på väg att inledas och man misstänker att det i en sådan applikation kan uppstå extrema chocklaster, vilka potentiellt kan orsaka stora skador på ställdonets drivlina. Detta examensarbete fokuserade på att kravställa och analysera ett överbelastningsskydd och att identifiera och utvärdera olika möjliga lösningar som kan implementeras i ställdonet för att skydda det från skador. En förstudie kring problemet har redan genomförts där författaren fann att de krafter som uppstår vid chocklaster motiverar att någon form av skyddsstrategi undersöks och implementeras i ställdonet. En omfattande multibody dynamics (MBD) modell av ställdonet utvecklades i MSC Adams (View) för att validera resultatet från förstudien. MBD-modellen utvidgades senare till att innefatta en torsionsflexmodell härledd från fysiska tester och även flexibiliteten hos själva grävmaskinbommen som extraherades från flexible body-simuleringar av grävmaskinens bomaggregat i Adams. Resultat från de utökade MBD-modellsimuleringarna visade att en skyddsmekanism behövs för att skydda drivlinan i ställdonet mot överlast i den tänkta grävmaskinsapplikationen. Tre olika skyddsmekanismer/strategier simulerades och utvärderades i MBD-miljön. En glidande lösning i form av en friktionskoppling, en frånkopplande lösning i form av en elektromagnetisk koppling, och en aktiv lösning där elmotorn reglerades till att producera maximalt vridmoment bakåt vid tidpunkten för kollisionen för att minska belastningarna i drivlinan. Att köra motorn bakåt vid kollision visade sig vara otillräckligt. Även för en idealiserad motor som kombinerade det maximala vridmomentet från den starkaste motorn som simulerades med rotationströgheten från den lättaste motorn som simulerades resulterade simuleringar i krafter genom drivlinan överstigande den statiska maxbelastningen. Friktionskopplingen visade sig vara en möjlig men ineffektiv lösning. Friktionskopplingens utlösningsmoment måste trimmas ner långt under den statiska maxbelastningen på grund av tiden det tar för maxbelastningen att propagera genom drivlinan. Detta innebar att ställdonets totala prestanda minskade rejält. Den frånkopplande elektromekaniska lösningen visade sig vara det mest lovande alternativet. Det faktum att den frånkopplande kopplingen helt kopplar bort komponenterna uppströms från komponenterna nedströms i drivlinan innebar att systemets prestanda förblev oförändrad. Svarstiderna som krävdes berodde på var kopplingen var installerad, från cirka 16ms om bara motorn skulle kopplas ur och upp till 17ms om både motorn och bromsen kopplades ur. Ytterligare analyser av utlösningsstrategier och svarstider måste genomföras för att definitivt avgöra om en elektrisk frånkopplande koppling är ett bra alternativ, men resultaten från denna avhandling visar att det är en lovande väg.

Page generated in 0.0592 seconds