Spelling suggestions: "subject:"balanced scorecard"" "subject:"balanced coreward""
41 |
Procurement KPIs analysis / Procurement KPIs analysisFlisníková, Klára January 2013 (has links)
The work aims to analyze and deduce subsequent key performance indicators in the Procurement department of the gas transmission company operating in the Czech Republic. In the first part are summarized the theoretical principles concerning procurement processes and performance measurement theories. By combining these two theoretical scopes was created a concept of Balanced Scorecard for Procurement and simultaneously was drawn a process for derivation of the key performance indicators. In the practical part were analyzed current processes in the procurement department and simultaneously were performed external and internal analyses and from the ascertained data was formed the SWOT matrix. Subsequently, the findings from the theoretical part were used and was proceeded accordingly to the pre-defined process in order to identify key performance indicators. In the conclusions were summarized the outputs of the work, the proposed key performance indicators and recommendations were given for successful implementation of the indicators into the process.
|
42 |
Wertschöpfungsorientierte balanced scorecard : Entwicklung und Ausgestaltung eines strategieumsetzungsorientierten Ziel- und Kennzahlensystems /Engel, Andreas. January 2006 (has links)
Zugl.: Erlangen, Nürnberg, University, Diss., 2006.
|
43 |
Aplicação de métodos de gestão à instituições de ensino: análise do Instituto Federal de Educação, Ciência e Tecnologia da Bahia – Campus Valença, sob a perspectiva do Balance ScorecardSantana, Ricardo Silva de 17 March 2014 (has links)
Submitted by Tatiana Lima (tatianasl@ufba.br) on 2015-03-30T18:21:16Z
No. of bitstreams: 1
Santana, Ricardo Silva de.pdf: 2142724 bytes, checksum: 3560d86ed5624b681fa233a45969f82c (MD5) / Approved for entry into archive by Tatiana Lima (tatianasl@ufba.br) on 2015-04-06T19:42:49Z (GMT) No. of bitstreams: 1
Santana, Ricardo Silva de.pdf: 2142724 bytes, checksum: 3560d86ed5624b681fa233a45969f82c (MD5) / Made available in DSpace on 2015-04-06T19:42:49Z (GMT). No. of bitstreams: 1
Santana, Ricardo Silva de.pdf: 2142724 bytes, checksum: 3560d86ed5624b681fa233a45969f82c (MD5) / Este trabalho tem a ambição de contribuir para o aprimoramento dos modelos de gestão das instituições de educação superior no Brasil, por meio de uma análise balizada pela proposta desenvolvida por Kaplan e Norton no Balanced Scorecard. Parte-se da visão, amplamente compartilhada no país, da deficiência na formação de gestores e na implementação de modelos bem organizados e sistematizados de gestão destas instituições. A partir da experiência diária no desafio de encontrar soluções administrativas e gerenciais dentro do contexto organizacional do Instituto Federal de Educação, Ciência e Tecnologia da Bahia, Campus Valença, realizou-se uma análise do quadro atual com as propostas desenvolvidas pela metodologia mundialmente adotada do Balanced Scorecard, e uma proposta visionária de gestão a partir de uma hipotética aplicação da metodologia naquele contexto organizacional. Ao final, espera-se que o presente estudo lance um pouco de luz sobre a formação dos gestores de instituições educacionais e provoque o aprofundamento dos estudos de administração aplicada a este campo estratégico para o desenvolvimento da sociedade e das organizações brasileiras. The aim of this work is to contribute to the improvement of management models of higher education institutions in Brazil, through an analysis buoyed by the proposal developed by Kaplan and Norton in Balanced Scorecard. Starting from the sight widely shared into the country , disability in management training and implementation of models well organized and systematized management of these institutions. From the daily experience in the challenge of finding administrative and managerial solutions within the organizational context of the ‘Instituto Federal de Educação, Ciência e Tecnologia da Bahia’, Campus Valença, we carried out a analysis of the current situation with the proposed methodology developed by the worldwide adopted of the Balanced Scorecard and a proposal visionary management from a hypothetical application of the methodology that organizational context. Finally, it is hoped that the present study throw some light on the training of managers of educational institutions and induce deeper studies of this strategic field applied to the development of society and the Brazilian organizations.
|
44 |
Proposição de uma metodologia para implantação do Balanced Scorecard no Hospital Escolar Portugal RamalhoGouveia, Rogério de Alencar 31 January 2008 (has links)
Made available in DSpace on 2014-06-12T17:38:02Z (GMT). No. of bitstreams: 2
arquivo3966_1.pdf: 1784025 bytes, checksum: b887b72f7efeaf3ee83df7ee9f7f4495 (MD5)
license.txt: 1748 bytes, checksum: 8a4605be74aa9ea9d79846c1fba20a33 (MD5)
Previous issue date: 2008 / Este estudo propõe uma metodologia para implantação do Balanced Scorecard (BSC) no Hospital Escola Portugal Ramalho, Instituição pública de assistência psiquiátrica da cidade de Maceió, Alagoas. Para tanto, foi apresentado o histórico do Hospital, a estrutura organizacional com suas hierarquias e o planejamento estratégico, como iniciativa de profissionalização da gestão. O referencial teórico trabalha temas atrelados à estratégia, ao planejamento estratégico e ao sistema de avaliação desempenho BSC, como base conceitual deste trabalho. Mostra-se a construção do BSC a partir das etapas recomendadas por Kaplan e Norton (2007), além da viabilidade do emprego desta ferramenta gerencial no âmbito do segmento público governamental. Sugere-se um modelo para Entidade hospitalar partindo do planejamento estratégico existente na Instituição, com adaptação da metodologia do BSC, contemplando a integração de medidas financeiras e não-financeiras, sob a ótica das quatro perspectivas: financeira, cliente, processo interno e ensino e aprendizado, propostas no Balanced Scorecard, interligadas por relações de causa e efeito. Destacam-se ainda as principais vantagens em utilizar este instrumento. Por fim, é mostrada a aplicação prática da proposta, de forma preliminar, materializada por meio do mapa estratégico, a partir da contribuição dos dirigentes do Hospital
|
45 |
Strategic implications of the employee performance management in emerging marketsGregor, Richard January 2008 (has links)
This thesis is dealing with the topic of the strategic performance management and cultural consequences of its implementation at emerging markets. The foremost goal of this thesis was to break down key issues which should be addressed by C-level management when considering implementation of Balanced Scorecards in emerging markets. Key issues which were addressed in this thesis: Cultural differences between emerging and developed countries; Knowledge worker as the key production factor in services; Theory of the Performance Management; Theory of Balanced Scorecards; Strategic implications of the implementation of Balanced Scorecards; Alternative approaches to Balanced Scorecards
|
46 |
Balanced Scorecard de uma organização de IDI - Investigação, Desenvolvimento e Inovação: o caso do INEGICunha, Manuel Sérgio Pereira da January 2010 (has links)
Estágio realizado no INEGI e orientado pelo Eng.º José Coutinho Sampaio / Tese de mestrado. Engenharia de Serviços e Gestão. Faculdade de Engenharia. Universidade do Porto. 2010
|
47 |
A Review of Strategy, Process, and IT in CRM and Future Development SuggestionKuo, Chien-min 19 July 2005 (has links)
Because of the fierceness of business environment competition, there are a lot of scholars investing this field to carry on research one after another. It makes CRM become new developing studying apparently in the MIS field. But there is no scholar to review important issue in CRM.
According this research we find the topics relative CRM can be divided into six constructs that are segment, finical, customer, customer knowledge management, operation and IT. Pass such a categorized way, not only help us understanding its intension, but also the relation of influencing each other.
We find out that too much research focus on CSF, system introduction and IT. And this research proposes a measurement based on balanced scorecard. Through this way not only help us knowing what benefit that CRM brought for organization, but also improved the successful rate. Besides balanced scorecard, this research discussed the creation of customer knowledge and we find out the steps of customer knowledge creation can also divided into socialization, externalization, combination and internalization. However, most research focus on externalization, future research could do research on the others that would help organization more efficient grasping customer knowledge.
|
48 |
The Research on Implementing Performance Management System Based on Balanced Scorecard ¡V Using the Taiwanese Branch of a Multinational Foods Company as an ExampleLee, Yuh-Chin 22 August 2002 (has links)
ABSTRACT
Institute of Human Resource Management
National Sun Yat-Sen University
Title of the thesis:
The Research on Implementing Performance
Management System Based on Balanced
Scorecard ¡V Using the Taiwanese Branch of a
Multinational Foods Company as an Example
Name: Yuh-Chin Lee
Advisor: Chin-Kang Jen, Ph.D.
Graduate date: July, 2002
Degree conferred: Master
Considering there is only few company implementing Balanced Scorecard in Taiwan, or even if there are some companies already implementing it, they are seldom effectively linked with performance management or other systems. This research is using the Taiwanese Branch of a multinational foods company as an example, and is based on the principle of the single case study method. The topics of this thesis are as follows:
1. To study the individual company¡¦s performance
management system to understand the actual
operation of Balanced Scorecard in the
enterprise, thereafter provides the company¡¦s
experience to those who will use Balanced
Scorecard in the future by introducing step by
step of the individual company¡¦s implementing
process.
2. To point out, through the analyzes of an
individual company¡¦s system and the studies
of related documents, problems that individual
company might encounter during the
implementation of the system, and find out
improving methods.
3. To provide suggestions for improvements to the
individual company.
Based on the findings of this research, the following conclusions are reached:
1. Because the individual company follows
Balanced Scorecard¡¦s concept to implement its
performance management system, thus the system
can runs smoothly and gets good results. The
process starts with the confirmation and
integration of the company vision, mission,
and core values, which will help the company
to build up its conscientious. The second step
is to set up company strategy align with
company vision, mission and core values, and
use Balanced Scorecard to convert this
strategy into the company goal, then develop
its action plans. The third step consists in
monitoring performance results and doing
necessary revisions to ensure the achievement
of the goal. In the end it is necessary to
link the performance results with the reward,
employee development and promotion plan.
2. The problems that individual company
encountered during the system implementation
are as follows:
1) In the area of system design
Because the individual company directly
adopted its mother company¡¦s strategy, and
did not draw out its own strategy map, it
is highly possible that in the future, if
the environment dramatically changes, the
company will need to revise its strategy to
adapt to the changes and might fail to link
the performance management system with the
strategy properly.
2) In the area of processing
a. Lack of complete information supporting
system.
b. Employees¡¦ expectation of a gap between
performance results and performance
bonus payments.
c. Increasing imbalance between employee¡¦s
work and family life.
3. Suggestions to the individual company are as
follows:
1) Build up an individual company's strategy
map, and link the performance
management system tightly with the strategy.
2) Set up an information supporting system
based on Balanced Scorecard.
3) Disclose the linkage between performance
results and performance bonus
payments at the beginning of the
performance cycle.
4) Simplify the work process, and create a
balanced working environment.
|
49 |
Erfolgspotentiale in der bankbetrieblichen Planung /Wissmann, Ralf. January 2001 (has links)
Göttingen, Universität, Thesis (doctoral), 2001.
|
50 |
Effekte inter-organisationaler balanced scorecards Automobile-Hersteller-Zuliefererbeziehungen im internationalen VergleichAsmussen, Nils January 2008 (has links)
Zugl.: Lüneburg, Univ., Diss., 2008
|
Page generated in 0.0633 seconds