11 |
Design and development of a composite frequency response analyserJones, David Lee January 1990 (has links)
No description available.
|
12 |
A microprocessor-based electronic control system for the jacquard loomInyiama, H. C. January 1981 (has links)
No description available.
|
13 |
Interactive programs and algorithms for designing control systems by method of inequalitiesAl-Swaha, A. M. January 1977 (has links)
No description available.
|
14 |
Self tuning filters for two dimensional systemsCaldas Pinto, J. R. January 1983 (has links)
No description available.
|
15 |
Design of a compensated self-tuner for process controlGuidoum, A. January 1988 (has links)
No description available.
|
16 |
High speed processing for real-time control of multiple axis continuous path manipulatorsSherkat, Nasser January 1989 (has links)
No description available.
|
17 |
The application of predictive controlLing, Keck-Voon January 1992 (has links)
No description available.
|
18 |
CAD tools for digital controlDe Oliveira, Maria Cristina Ferreira January 1990 (has links)
No description available.
|
19 |
INVENTORY CONTROL SYSTEM : Optimization of production system and reliabilityKALEEM ULLAH, MUHAMMAD January 2010 (has links)
The main idea of this research to solve the problem of inventory management for the paper industry SPM PVT limited. The aim of this research was to find a methodology by which the inventory of raw material could be kept at minimum level by means of buffer stock level.The main objective then lies in finding the minimum level of buffer stock according to daily consumption of raw material, finding the Economic Order Quantity (EOQ) reorders point and how much order will be placed in a year to control the shortage of raw material.In this project, we discuss continuous review model (Deterministic EOQ models) that includes the probabilistic demand directly in the formulation. According to the formula, we see the reorder point and the order up to model. The problem was tackled mathematically as well as simulation modeling was used where mathematically tractable solution was not possible.The simulation modeling was done by Awesim software for developing the simulation network. This simulation network has the ability to predict the buffer stock level based on variable consumption of raw material and lead-time. The data collection for this simulation network is taken from the industrial engineering personnel and the departmental studies of the concerned factory. At the end, we find the optimum level of order quantity, reorder point and order days.
|
20 |
Variable structure model synthesis for switched systems /Kypuros, Javier Angel, January 2001 (has links)
Thesis (Ph. D.)--University of Texas at Austin, 2001. / Vita. Includes bibliographical references (leaves 182-186). Available also in a digital version from Dissertation Abstracts.
|
Page generated in 0.0277 seconds