• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 28
  • Tagged with
  • 28
  • 28
  • 24
  • 22
  • 21
  • 20
  • 18
  • 16
  • 13
  • 13
  • 12
  • 11
  • 11
  • 10
  • 6
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Propuesta de mejora de niveles de servicio en dos intersecciones

Reyna Peña, Pedro 11 January 2015 (has links)
El presente documento propone una alternativa para mejorar el nivel de servicio de dos intersecciones en el distrito de Miraflores. La primera de ellas es la intersección de las avenidas Comandante Espinar con la Calle Enrique Palacios y la segunda es la nueva intersección semaforizada de Enrique Palacios con la Calle Arica. Estas intersecciones se encuentran a 100 m de distancia, y se analizó el grado de saturación de las intersecciones mencionadas; además se realizó el cálculo de las demoras y se determino el nivel de servicio actual. Luego, se proponen soluciones, mediante la evaluación de los ciclos de los semáforos, con el fin de mejorar el nivel de servicio para agilizar el tránsito en esta zona en horas punta. Los datos de aforo se obtuvieron del aforo manual realizado en las dos intersecciones en análisis y también se recogió información de la Municipalidad de Miraflores para comparar los valores obtenidos. La información obtenida se ha procesado según el HCM. Asimismo, se está usando como herramienta el software de modelación Synchro Traffic 8.0 que ayudó a la evaluación analítica del documento. Finalmente, se propone una solución que este acorde a la realidad de cada intersección desde el punto de vista técnico.
2

Propuesta de mejora para disminuir los tiempos de paradas no programadas de los buses en una empresa de transporte público a través de la metodólogia RCM y un mantenimiento autónomo

Durand Delgado, Harold Noe 30 September 2018 (has links)
Consorcio Transporte Arequipa S.A., es una empresa de transporte público que participó y ganó la licitación para circular por las rutas del corredor complementario N° 03; “Corredor Azul”. Cuenta con una flota de buses que circulan de manera periódica durante todos los días. Debido a diversas averías funcionales de los buses, estos quedan inoperativos en las horas programadas de trabajo y ocasionan tiempos muertos que disminuye los ingresos de la empresa e incurren en costos de reparación, estas paradas son ocasionadas en 67% del total por averías mecánicas. El presente proyecto de mejora tiene como objetivo disminuir los tiempos de paradas no programadas ocasionaras por fallas mecánicas, por lo que se aplicará una metodología de mantenimiento basado en confiabilidad y un mantenimiento autónomo. Para obtener estas mejoras se realizó un análisis de los buses más críticos, un análisis de modo y efecto de fallo (AMFE) y se implementó las 5 “s”. / Consorcio Transporte Arequipa S.A., is a public transport company which participated and won the tender to circulate by routes of supplementary racer N ° 03; “Corredor Azul”. It has a fleet of buses that circulate on a regular basis every day. Due to different functional faults of buses, these are rendered ineffective in the scheduled hours of work and they cause downtimes which decreases company revenues and incurred in repair costs, these stops are caused in 67% of the total by mechanical breakdowns. This improvement project aims to decrease the times of unscheduled stops ocasionaras by mechanical failuresby which applies a methodology of maintenance based on reliability and autonomous maintenance. To achieve these improvements an analysis of the most critical buses, an analysis of the mode and effect of failure (FMEA) was conducted and implemented the 5 "s". / Tesis
3

Evaluación de soluciones para mejorar el nivel de servicio de tres intersecciones de la Avenida Salaverry, comprendidos entre la Avenida Cádiz y la Avenida Canevaro

Garcia Rojas, Patty Maritza, Jauregui Huaman, Carla Stephanie 04 January 2018 (has links)
Medir la eficiencia del comportamiento de tres intersecciones: Avenida Salaverry, Cádiz y Canevaro, asimismo evaluar la calidad de nivel de servicio. Se empleó como herramienta el programa SYNCHRO 8.0, el cual a partir de los datos obtenidos en campo como los aforos vehiculares, ciclo de semaforización y factores de ajuste para el flujo de saturación pudo determinar los tiempos de demora que definieron finalmente los niveles de servicio en cada una de las intersecciones. Cabe mencionar que para corroborar los resultados obtenidos por el programa se realizó una comparación con los cálculos obtenidos de manera manual utilizando la metodología del Highway Capacity Manual / Measure the efficiency of the behavior of three intersections: Avenida Salaverry, Cádiz and Canevaro, also assess the quality of service level. The SYNCHRO 8.0 program was used as a tool, which of the data obtained in the field, such as motor vehicles, the traffic signaling cycle and the adjustment factors for the saturation flow, were able to determine the delay times that were finally defined. service at each of the intersections. It is worth mentioning that in order to corroborate the results obtained by the program, a comparison was made with the measures of manual use using the methodology of the Highway Capacity
4

Análisis del estudio de impacto vial para el proyecto de ampliación de instalaciones de la universidad peruana Cayetano Heredia

Marcelo Morales, Andrea Carolina, Monzón Muñoz, William 11 January 2015 (has links)
El estudio de impacto vial es un estudio de impacto del transporte, dado que no sólo involucra a la infraestructura vial sino que también al tránsito y a los modos de transporte. Su objetivo es la determinación de impactos negativos que se pudierna generar en el movimiento vehicular y peatonal, atraídos por el funcionamiento de un proyecto. El presente trabajo se enfoca en el análisis y evaluación del Estudio de Impacto Vial (en adelante EIV) para el proyecto de ampliación de instalaciones de la Universidad Peruana Cayetano Heredia. La propuesta de desarrollo del presente trabajo surge como necesidad de la supervisión del proyecto por desarrollar un EIV a la fecha actual. Como base de trabajo se cuenta con un EIV previo, el cual ha sido desarrollado hace más de un año por la consultora del proyecto, motivo por el que la supervisión desea contar con un EIV actualizado. El referido proyecto contará con varios trabajos de infraestructura, como son la ampliación de diversas instalaciones, y, dentro de la propuesta del proyecto, se contempla la construcción de una playa de estacionamientos. Es así como surge la necesidad de llevar a cabo un EIV, que permita conocer el impacto de esta nueva infraestructura sobre el tráfico actual, y así tomar las medidas necesarias para mitigar el impacto negativo en el tránsito.
5

Gestión de transporte sostenible y diseño geométrico de ciclovía que interconecte la estación Aramburú del Metropolitano y la estación San Borja Sur del Metro de Lima

Cavero Winchez, Gissell Alfonsina, Fernández Chipana, Paola 01 April 2016 (has links)
El objetivo general de la presente tesis es desarrollar un plan de gestión de transporte sostenible y el diseño geométrico para una ciclovía que conecte la estación de San Borja Sur del Metro de Lima con la estación Aramburú del Metropolitano. Los objetivos específicos que se explicará con el avance de la tesis son los siguientes: • Desarrollar los conceptos relacionados con la movilidad sostenible y uso de la bicicleta como transporte urbano. • Identificar los puntos de atracciones que se encuentren dentro de la zona de estudio. • Recopilar la base de datos de la demanda de usuarios del Metropolitano y el Metro de Lima de las estaciones que se encuentran dentro de la zona de estudio. • Realizar una encuesta de origen destino a los usuarios de las estaciones Angamos y Aramburú del Metropolitano y las estaciones La Cultura, San Borja Sur y Angamos del Metro de Lima. • Calcular la demanda a futuro de los ciclistas que usarán la ciclovía propuesta. • Desarrollar el diseño geométrico de la ciclovía que conecte la estación Aramburú del Metropolitano y la estación San Borja Sur del Metro de Lima. • Desarrollar un sistema de gestión de transporte sostenible para incentivar el uso de bicicletas en la zona de estudio.
6

Propuesta de solución al aumento del flujo vehicular en un área de estudio. Caso de estudio: Av. Túpac Amaru entre la Calle Sánchez Cerro y la Av. Tomás Valle / Proposal of solution to the increase of the vehicular flow in a study area Case study: Av. Túpac Amaru between Calle Sanchez Cerro and Av. Tomás Valle

Alvarado Castillo, Dante Alberto 30 November 2018 (has links)
La presente tesis analiza y plantea soluciones a las condiciones de tráfico actual y futuro en la intersección comprendida entre las avenidas Túpac Amaru y Tomás Valle, tomando como base los flujos vehiculares que ingresan adicionalmente por la Calle Sánchez Cerro. Se tomaron datos para calcular la capacidad de la infraestructura vial actualmente instalada, tales como control de tráfico, dispositivos viales dentro de la zona de estudio y geometría de la zona, así como los flujos vehiculares que ingresan a la Av. Túpac Amaru por la calle ya mencionada. Esta tesis se basa en la metodología del Highway Capacity Manual (HCM) (2010). Es así como con los datos obtenidos se determina la demanda vehicular que incide en la zona de estudio y luego se realiza el análisis de resultados obtenidos de la modelación con el Software Synchro V8, tanto para la situación actual como para la situación futura. Con ello se buscan reducir los problemas de demoras, saturación y niveles de servicio en las intersecciones, estimando el flujo vehicular a 6 años, periodo válido de sostenibilidad para un proyecto Vial Urbano, basándonos en el crecimiento vehicular del distrito de Independencia donde se encuentra la zona de estudio. / Independence This thesis analyzes and planted a Solution The current conditions and future traffic in the intersection of the avenues including Tupac Amaru and Thomas Valle, based on vehicle flows additionally enter the street Sanchez Cerro. Data were taken to calculate the capacity of the currently installed Road Infrastructure, tales traffic control Como, vials devices within the study area and geometry of the area and traffic flows entering the Av. Tupac Amaru street already mentioned. This thesis is based on the Methodology Manual Highway Capacity (HCM) (2010). Thus, with the data obtained vehicular demand affects the study area is determined and then the analysis of results obtained from the modeling software with V8 Synchro is done, both for the current situation as future situation. This would seek to solve the problems of delays, saturation and service levels at intersections, estimating traffic flow to 6 years valid period of Sustainability for a road project Urbano, based on the vehicular Growth District of Independence where it meets the Study zone. / Tesis
7

Análisis de flujo de saturación real en la intersección de Av. Primavera con Av. Encalada en la ciudad de Lima

Torres Senmache, Abraham David, Alvarado De La Cruz, Ricardo Jesús 19 February 2018 (has links)
Analyze the real saturation flow and the proposal for the saturation flow closest to the baseline of the intersection, Av. Primavera with Av. Encalada in the city of Lima. The saturation flow analysis can be done through recommendations of the Highway Capacity Manual 2010. / Tesis
8

Propuesta de mejora en el nivel de servicio peatonal para la intersección de la av. Angamos con la av. Tomás Marsano ubicado en el distrito de Surquillo-Lima

Daga Guillén, Karen 29 November 2018 (has links)
En la actualidad, la cantidad de autos y peatones que transitan en las principales avenidas de Lima sobrepasa las capacidades iniciales por las que fueron diseñadas. En el caso de los peatones, estos circulan en espacios reducidos y emplean más tiempo de lo usual. Por ello, se eligió la intersección Av. Angamos con Av. Tomás Marsano, ya que según la Policía Nacional de Tránsito (2014), esta intersección se encuentra dentro de los principales puntos críticos del distrito de Surquillo. Mediante observaciones in situ, también se percibió un mal diseño geométrico por lo que los peatones transitaban corriendo, en espacios reducidos y empleaban varios minutos al cruzar una calzada. Es así que se realizaron los aforos pertinentes para determinar la cantidad actual de peatones que transitan por estas avenidas, luego se emplearon 3 métodos para hallar el nivel de servicio peatonal según el HCM 2010, el Nivel de Servicio Multimodal del NCHRP 616 y la Evaluación de Cruces del NCHRP 562. Con ello, se obtuvieron los niveles de servicio se compararon y se identificaron las posibles propuestas de mejora. Debido a que efectivamente el nivel de servicio no era el óptimo, se propuso rediseñar geométricamente la intersección con ampliaciones de bermas, veredas, entre otros. Finalmente, se validaron los niveles de servicio con las propuestas de mejora, y el nivel de servicio salió óptimo. Actually, the number of cars and pedestrians that are passing on the main avenues of Lima exceed the initial capacity for which they were designed. In the case of pedestrians, they are circulating in small spaces and are spending more time than usual. Therefore, the Ave. Angamos was elected intersection with Ave. Tomas Marsano by the Traffic National Police of Peru (2014), this intersection is located in the main critical points of Surquillo. By in situ observations, also it is looked a bad geometric design so pedestrians transited running in small spaces and employed several minutes to cross a road. So that relevant traffic counts were performed to determine the current number of pedestrians passing through these avenues, then 3 methods are used to find the level of pedestrian service by the HCM 2010, the level of Multimodal Service by the NCHRP 616 and Appraise of crosses by the NCHRP562. As a result, service levels obtained were compared and possible proposals for improvement were identified. Because effectively the level of service was not optimal, it was proposed to redesign the intersection geometrically as extensions of berms, sidewalks, among others. Finally, service levels were validated with proposals for improvement, and the level of service was optimum. / Tesis
9

Propuesta de mejora en los niveles de servicio del óvalo José quiñones empleando el software vissim 7.0

Lopez Barrios, Leoncio Enrique, Medina Marcos, Carlos Eduardo 17 August 2018 (has links)
El crecimiento del área urbana-comercial, el incremento del parque automotor y la falta de dispositivos para el control del flujo vehicular genera que muchas infraestructuras viales colapsen o superen la capacidad para las que fueron diseñadas. Tal es el caso de la intersección vial Óvalo José Quiñones, donde en determinadas horas, a las cuales se denominará “horas punta”, el flujo vehicular se torna pesado, largas colas de espera para llegar a la intersección próxima. Por ello, en este proyecto de tesis se recolectarán datos de la intersección como aforos, distancias entre vehículos, velocidades promedio, etc. Estos parámetros recogidos en campo permitirán realizar un análisis de la situación actual, para determinar el flujo de vehículos, las colas y el tiempo de espera para cruzar esta intersección, con ayuda del software de microsimulación Vissim 7.0. Una vez creado, calibrado y validado el modelo de la situación actual en el software Vissim 7.0 se propondrán opciones de mejora que permitan tener una correcta canalización de los flujos que circulan por la intersección. Finalmente, se escogerá la propuesta que mejore considerablemente el funcionamiento del óvalo y que a su vez pueda ser implementada. / The growth of urban and commercial area, the increase of the cars fleet and the lack of devices for controlling the traffic, achieved that many road infrastructure collapse or exceed the capacity for which they were designed. Such is the case of road intersection roundabout Jose Quinones where in some hours, to which we will call "rush hour", traffic flow becomes heavy, long queues to reach the next intersection. Therefore, in this thesis project data will collected from the intersection as a traffic density, distance between vehicles, average speeds, etc. These parameters collected in the field will enable an analysis of the current situation, to determine the flow of traffic, queues and waiting times to cross this intersection using the Vissim 7.0 microsimulation software. Once created, calibrated and validated the model of the current situation in the Vissim 7.0 software enhancement options that enable a correct channeling of flows circulating be proposed by the intersection. Finally, the proposal greatly improve performance of the roundabout and which in turn can be implemented will be chosen. / Tesis
10

Rediseño geométrico aplicando la canalización de las intersecciones de la Av. Universitaria con la Av. Los Alisos y de la Av. Universitaria con la Av. Naranjal para reducir la congestión vehicular

Cereceda Bautista, Cristhian Josué, Román Chávez, Julio Alonso Omar 08 June 2018 (has links)
Lima Metropolitana representa cerca del 41.2% de la población urbana a nivel nacional donde uno de cada cuatro limeños vive en Lima Norte o el cono norte (Carabayllo, Ancón, Puente Piedra, San Martín de Porres, Santa Rosa, Comas, Independencia y Los Olivos). Además, Lima Metropolitana (incluyendo Callao) es la región que tiene más vehículos circulando por sus vías (1’752.919 vehículos), lo que representa el 66% de vehículos que existen en el parque automotor en todo el Perú, es decir más de la mitad de carros que hay en el país circulan por las vías y carreteras de nuestra capital; siendo los automóviles (807.529 unidades) los que más están circulando, seguidos de las station wagon (284.251 unidades) y camionetas rurales (236.502 unidades). La falta de planificación, acompañada del tráfico generado por la sobrepoblación y la mala logística, diseño e infraestructura de las vías urbanas, ocasiona que el tránsito vehicular y transporte de carga se vea afectado, originando el colapso de las intersecciones y retrasos en los recorridos de los usuarios. En el presente trabajo se analizará dos intersecciones congestionadas en la Av. Universitaria, una de las principales vías de transporte en Lima Norte. Las intersecciones son el cruce de la Av. Universitaria con la Av. Los Alisos y la Av. Naranjal. Se propone variaciones de canalización en la intersección y modificaciones del ciclo semafórico para reducir la congestión vehicular y se utilizara la metodología del HCM 2010 / Metropolitan Lima represents about 41.2% of the urban population nationwide where one in every four Lima lives in Lima Norte or the northern cone (Carabayllo, Ancon, Puente Piedra, San Martin de Porres, Santa Rosa, Comas, Independencia and Los Olivos ). In addition, Lima Metropolitan (including Callao) is the region that has more vehicles circulating through its roads (1'752.919 vehicles), which represents 66% of vehicles that exist in the vehicle fleet throughout Peru, that is, more than half of the cars in the country circulate along the roads and highways of our capital; being the automobiles (807.529 units) the ones that are circulating the most, followed by the station wagon (284.251 units) and rural vans (236.502 units). The lack of planning, accompanied by traffic generated by overpopulation and bad logistics, design and infrastructure of urban roads, causes vehicular traffic and transportation of cargo to be affected, causing the collapse of intersections and delays in the routes of the users. In the present work, two congested intersections will be analyzed in the University Avenue, one of the main transportation routes in North Lima. The intersections are the junction of University Ave. with Av. Los Alisos and Av. Naranjal. It is proposed variations of channeling in the intersection and modifications of the traffic light cycle to reduce vehicular congestion and the 2010 HCM methodology will be used. / Tesis

Page generated in 0.0669 seconds