Interface Shear Strength in Lightweight Concrete Bridge GirdersScott, Jana 27 July 2010 (has links)
Precast girders and cast-in-place decks are a typical type of concrete bridge construction. A key part of this type of construction is developing composite action between the girder and deck. In order to develop composite action, adequate horizontal shear resistance must be provided at the interface. As lightweight concrete is increasingly being used in bridge designs, it is important to understand the horizontal shear behavior of lightweight concrete.
The current AASHTO LRFD Specification provides design equations for horizontal shear strength of both lightweight and normal weight concrete. Thirty-six push-off tests were performed to determine if the current code equations accurately predict the horizontal shear strength of precast girders and cast-in-place decks for both normal weight and lightweight concrete. The different test series investigated effects from lightweight and normal weight concrete used for the girder/slab combination and the quantity of shear reinforcement provided across the interface.
The test results were compared to the results predicted by current design equations. A structural reliability analysis was performed and the test-to-predicted statistics were used to define LRFD resistance factors and quantify the probability of failure. The current design equations were found to be conservative and more conservative for lightweight concrete than for normal weight concrete. / Master of Science
|
12 |
Polyfunkční objekt / Multifunctional buildingProkop, Radek January 2019 (has links)
My diploma thesis deals with project a multifunctional building. My project corresponds to the scope of documentation for the execution of construction. Building hat five floor and construction roof is green roof, single-layer flat roof. Construction systém is cast-in-place concrete frame. In basement is technical facilities and parking place. In ground floor is shop place and parking floor. In first floor is office place. In third and fourth floor are flats. Building foundations are bored cast in place pile – method CFA.
|
13 |
Knihovna / LibraryDrinková, Natalie January 2022 (has links)
The subject of this diploma thesis is the design of a new library and the elaboration of project documentation for the construction. The library is located on the outskirts of the village Jiříkovice on a flat plot. The building is designed as a detached building with an underground floor and two above-ground floors. The individual floors are connected by staircases and a lift. The above-ground part of the building contains library, office part and café. The underground part of the building contains archive, stores and technical facilities. The structural system of a building is designed from cast-in-place concrete frame with filling from ceramic blocks. Horizontal structural system is from cast-in-place reinforced concrete point-supported slabs. Part of facade is from wood and part is with contact thermal insulation system with mineral wool insulation. Roof construction is designed as flat green roof.
|
14 |
Polyfunkční objekt / Multifunctional buildingTměj, Václav January 2022 (has links)
The subject of the thesis is a project documentation od multifunctional object to build. The building has four floors above ground and one sub-terrain. In the underground, there is parking and technical rooms. In the firt floor there are boutiques and a coffe shop. The second and third floor are office spaces and in the last floor the are apartments. The edifice has skeletal construction systém with monolithic ceiling structures and flat green roof. The object is based on piles created by CFA method. Blueprints were created in the Archicad program.
|
15 |
Hotel / HotelVopálenský, Lukáš January 2022 (has links)
This aim of the diploma thesis is the design of hotel with restaurant, outdoor parking and garage in Brno - Kníničky, Hrázní street on sloping plot no. 3570 and 3571. The hotel is with partial basement and has five above-ground floors. The total capacity of the hotel is 99 guests in 50 guest rooms. Structural systém is cast-in-place concrete frame. Infill wall are from clay masonry Heluz. Partition is from plasterboard partition. External wall are with contact thermal insulation system. Part of the external wall have ventilated facade. Floor structure is from cast-in-place reinforced concrete floor. The roof is green roof. The outdoor parking consists of ten parking spaces, fice of which are barrier-free for people with reduced mobility. Residue parking spaces are in the garage opposite the hotel. From the side of the hotel are parking spaces for hotel staff. On plot are designed playground.
|
16 |
Administrativní budova / Administrative BuildingHorká, Simona January 2020 (has links)
Subject of this diploma thesis is building documentation of an office building. Designed object is located in the city of Olomouc. Primary purpose of the building will be offices with rentable space, whose layout will be designed as open space offices with option to divide space according to requirements of a tenant. Office spaces will serve for example as headquarters of design offices, IT consulting and services, business companies, technical consulting or managerial services. The building will contain except of office premises also a space for café, retail and underground garage primarily designed for parking of office employees´ cars. Office building is designed as cast-in-place reinforced concrete frame with shear walls, consisting of 4 floors and basement. Object is shaped as two buildings connected with common walking space. Facade will predominantly be designed as glass curtain walling and also as a ventilated facade with cladding from exposed cement-fiber board. Also there is designed a system of steel curtain wall with docked trellis ropes for planting of climbing plants to decrease overheating of the building in summer and to meet the city requirements of as much greening of buildings and their surroundings as possible.
|
17 |
Hasičská stanice / Fire stationHorváthová, Radka January 2022 (has links)
The topic of the diploma thesis is the elaboration of project documentation for the construction of a fire station with almost zero energy consumption. The building will serve as a fire station type P4 with the scope of the JPO I unit - a unit of the fire department with a territorial scope, usually within 20 minutes drive from the place of deployment. The designed building is a detached object with two above-ground and one underground floor. The building is designed as a reinforced concrete skeleton. It consists of two operating units. The administrative and operational part has three floors. In this part, the main entrance to the building is on the 1st floor, oriented on the south side. The technical rooms of the fire department are located on the first floor and are functionally connected to the administrative part. Exit garages, a car wash and a dryer are also attached to it. Prior to the elaboration of the project, a visit to the regional fire station in Trnava and a consultation with the director of this station took place regarding the needs and requirements of the fire department.
|
18 |
Nosná železobetonová konstrukce vícepodlažního obytného objektu / Load-bearing reinforced concrete structure of a multi-storey residential buildingBadány, Kristián January 2022 (has links)
The objective of the diploma thesis is a design and check of load-bearing concrete structure of multi-storey residential building. The building is located in Brno. The total ground plan’s dimensions are 39,32 x 22,58 metres, total height of the building in the highest point is 10,29 metres. The object is three-storey building with rectangular plan with partial basement designed as cast-in-place concrete frame and two above-ground floor designed as reinforced concrete walls and masonry walls. Load-bearing floor structures are designed as reinforced concrete slabs. Drawing documentation is included.
|
19 |
AN INVESTIGATION INTO THE DESIGN AND PRODUCTION OF THE SINGLE-POUR, CAST-IN-PLACE CONCRETE COMPOSITE WALLSTEVENS, BENJAMIN JOHN 02 July 2004 (has links)
No description available.
|
20 |
Planejamento e controle da produção com a utilização de células de trabalho: estudo de caso em construções com vedações verticais em concreto armado moldadas in loco / Planning and control of production using work cells: a case study in constructions with cast-in-place concrete vertical panelsBezerra, Larissa Marinho Coelho de Medeiros 10 June 2010 (has links)
A indústria da construção civil vem assumindo um papel determinante no desenvolvimento econômico do país e vivenciado um crescimento exponencial que exige das empresas uma dedicação crescente na busca por novas tecnologias construtivas e ferramentas que auxiliem na gestão de empreendimentos. Sistemas construtivos racionalizados que repercutam na melhoria dos produtos com a redução de custos são essenciais para manter a competitividade no setor. O sistema construtivo de vedações verticais em concreto armado moldadas in loco confere uma alternativa na produção de habitações em larga escala caracterizada pela redução de custos e alta produtividade originando uma cadeia produtiva que auxilia no planejamento e controle da produção em obras. O presente trabalho tem como objetivo contribuir para o planejamento e o controle da produção de edificações que utilizam em seu processo o sistema construtivo anteriormente citado, propondo um modelo de organização da produção baseado na redução da variabilidade dos processos produtivos por meio do fluxo contínuo da produção, que proporcione o trabalho ininterrupto no canteiro de obras. A proposta associa os princípios que sustentam a filosofia produtiva da Lean Constrution, e recomenda um modelo para o planejamento operacional de curto prazo, que defina os fluxos produtivos pela aplicação de ritmos constantes nas atividades mediante o nivelamento dos recursos de mão-de-obra envolvidos no processo produtivo com a introdução de células produtivas que proporcionam lotes otimizados de trabalho, constituindo células de trabalho. / The construction industry has a decisive role in economic development of the country and experienced exponential growth requires dedication growing companies in the search for constructive new technologies and tools that will assist them in managing exposures. Constructive rationalized systems that reverberate in improvement of products with reducing costs is critical to remain competitive in the industry. The constructive system using cast-in-place concrete vertical panels confers an alternative in the production of large-scale housing characterized by reduced costs and high productivity that provides a productive chain which assists in the planning and production control in workplaces. This work aims to contribute to the planning and production control buildings that use its constructive system previously cited, proposing a model organization of production based on reducing variability in productive processes through streaming production, providing uninterrupted work on site. The proposal combines the principles supporting the production philosophy of Lean Constrution, and recommends a template for the short-term operational planning, defining workflows by applying patterns appearing in activities by the leveling of labour resources involved in the production process with the introduction of work cells that provide small batches of work.
|