• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 2
  • 1
  • Tagged with
  • 6
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Invesitgating Risk Factors Invovled in an International Joint Venture Construction Project:- A Case Study of Kaohsiung Mass Rapid Transit

Yao, Tsu-Chiang 13 June 2005 (has links)
Since Taiwan became a member of the World Trade Organization (WTO), the government has opened the market for foreign contractors to tender for major public works within the country. Some of the international construction companies from Germany, Japan, Malaysia, Holland, Korea, Singapore etc had set up their branch office in Taiwan to compete ambitiously with the local construction companies . Many exclusive investment projects in Taiwan was implemented in bigger scale since 1998. For instance , among the 11 packages of the Kaohsiung Metropolitan Mass Rapid Transit (KMRT) Project, the smallest package is worth NTD 500 million while the biggest package amounting to NTD 900 million. Such projects characterized by its large size, huge capital injection, high technical expertise requirement, sophisticated system consolidation as well as multiple interfacing works which is beyond the capabilities of the local traditional construction companies . Partnership especially joint venture with foreign construction companies has became a better resolution for local construction companies . Although joint venture has the advantages of risk sharing, technology transfer , professional advice and profit sharing, however the differences in culture of the joint venture companies, management style, financial strength, expertise and size of related companies has caused a number of problems and uncertainties. This dissertation was an in-depth study on risk assessment of international contractor in a joint venture company implementing one of the packages of KMRT projects. Based on the information collected, interviews with the executives and various analysis, it can be summarized as below : - External risk factors: Foreign contractors should evaluate the possibility on change of related laws and strategies by the local government in order to formulate a versatile contingency plan. They should be more selective while choosing a local partner. This partner should have the first hand information with respect to the local resources, good relationship with local community and politician to reduce the non-professional risk. They should be more conservative on the evaluation of the local government administrative performance. Project risk factors: There should be ample time allocated to discuss the Main Contract Agreement . It is suggested to be carried out in two stages : Firstly, a simplified main contract to be drafted. Secondly, a more define and explicit addendum to main contract to be appended progressively so that every aspect of the contractual issues can be studied and discussed in great detail . This will provide a fair basic for interpretation of the main contract for client and the main contractor ( JV). The right and liabilities on land acquisition, demolition of landed properties , compensation to the owners, construction period, delay and various contractual claim issues should be scrutinize thoroughly. Internal risk factors : The project execution strategies should be prepared and accepted collectively to avoid misunderstanding on technology transfer, safety & quality assurance, progress control and profit distribution among the members of the Joint Venture during the course of the works.
2

A biomorphic integrated-circuit implementation of muscular contraction

Hudson, Tina Ann 08 1900 (has links)
No description available.
3

Ett patientvänligt sjukhus : - exemplet Visby lasarett / A patient friendly hospital : The example of the Visby hospital

Ronsten, Barbro January 2009 (has links)
No description available.
4

Ett patientvänligt sjukhus : - exemplet Visby lasarett / A patient friendly hospital : The example of the Visby hospital

Ronsten, Barbro January 2009 (has links)
No description available.
5

ResPublica/Civitas Socialis – Strachotín, l. p. 2017 / ResPublica/Civitas Socialis - Strachotín

Kupka, Tomáš January 2017 (has links)
Strachotín is a village on the edge, not just from geological point of view, but in the sense it´s next development too. Currently it´s main problem is, that it does not offer anything specific to become interesting for turists. There are not the best wine, architecture, accomodation, catering or public services. What it does have is undoubtedly the best view of Palava massif. It is not used at all and that was the main reason that led me to think of building at the pier so this attribute could be finally used for further development of this village. For this purpose i chose the object gallery of wine which is missing here and is also welcomed by it´s citizens.
6

Porovnání technických vlastností a technologií pokládky lehkých stavebních hmot pro podlahové konstrukce / Comparison of technical characteristics and technology of laying light building materials for floor construction

Mikulica, Karel January 2015 (has links)
This graduation thesis is aimed to presentation heat isolation materials for the floor constructions. The experimental part is devoted physical - mechanical properties suggested very light concretes with the cement. The main part of the thesis is devoted to form of the transit and putting of the individual heat isolation materials. In the end are suggested structures of the floor constructions with the respect to their properties and price.

Page generated in 0.0961 seconds