• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 3625
  • 38
  • 29
  • 17
  • 5
  • 4
  • 1
  • Tagged with
  • 3804
  • 1962
  • 1902
  • 1902
  • 1902
  • 1902
  • 1902
  • 1896
  • 1578
  • 861
  • 761
  • 702
  • 621
  • 600
  • 541
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
91

Implantación del Sistema de Planeamiento y Control de Costos por Procesos para Empresas de Construcción

Briceño Balarezo, Omar Orlando January 2003 (has links)
El presente trabajo aporta un Sistema de Planeamiento y Control de Costos por Procesos para proyectos en el sector Construcción, el cual incluye las actividades que a continuación se detallan. Definición de los Volúmenes del Proyecto. Se debe revisar y analizar toda la documentación existente del proyecto: Contratos, planos y especificaciones, presupuesto y planeamiento de oferta; el objetivo es lograr una conceptualización general del mismo y establecer las premisas necesarias. Teniendo en consideración toda esta información, el jefe de proyecto y su equipo inicial, deberán determinar los principales volúmenes (metrados) a ejecutar. Definición de Procesos y Responsables. El jefe de Obra definirá los “Procesos del Proyecto” considerando que cada proceso debe ser identificable y mensurable, con responsables y recursos específicos. Así mismo definirá los responsables de los mismos, para lo cual coordinará la disponibilidad e idoneidad del personal en coordinación con el Gerente de la Unidad de Negocios. Identificación del metrado más relevante del Proceso. Para cada Proceso definido, el responsable conjuntamente con el Jefe de Costos, deberá identificar las Partidas Cliente que corresponden al proceso y definir el metrado que servirá para cuantificar el Costo Unitario del Proceso (US$/Und). Plan por Procesos. Esta Planificación por Procesos debe considerar metas (Milestone) que serán hitos de entrega específicos entre los procesos que se establezcan. Definición de Recursos Principales en cada Proceso. Tomando como información los volúmenes a ejecutar en cada proceso, los plazos definidos en el Programa Detallado, los recursos generales definidos y con los rendimientos estándar o por experiencias anteriores, cada Responsable de Proceso definirá los recursos principales y las cantidades que planea usar en la ejecución del proceso, obteniendo de esta manera su Costo Meta. Los recursos deberán ser agrupados en los siguientes rubros: Equipos, Vehículos, Manos de Obra, Materiales, Subcontratos, Supervisión, y Gastos Generales. Medición de la Productividad de los Recursos: Para cada proceso, el responsable del mismo en coordinación con el Jefe de Costos, calcularán los siguientes ratios de control de productividad: C.U. Presupuesto: Se obtiene al dividir el Costo de Presupuesto entre el metrado elegido para medir el avance del proceso, para lo cual se debe tener en cuenta adicionar al Costo Directo Presupuestado, el Costo Presupuestado de los recursos “Indirectos de Producción”, es decir aquellos que en presupuesto fueron considerados como indirectos pero que contribuyen directamente en el proceso según los recursos establecidos en la definición de recursos. (Ejemplo: Costo de Supervisión Directa, Vehículos, etc.) C.U. Meta: Se obtiene al dividir el Costo Meta (Estándar) entre el metrado elegido para medir el avance del proceso. C.U. Real: Se obtiene al dividir el Costo Total de los recursos realmente utilizados en un periodo de tiempo entre el metrado ejecutado. Se debe cuantificar el C.U. Real de cada periodo y el C.U. Acumulado. La comparación del C.U. Meta vs. El C.U Real Acumulado servirá al responsable del proceso para tomar acciones para la reducción de costos y/o ajustar el costo de la proyección por ejecutar. De esta manera los responsables de Procesos podrán enfocarse en sus Procedimientos Constructivos y encontrar los recursos con menor rendimiento que están influyendo negativamente en el resultado del proceso.
92

Léxico de la industria de la construcción en el Perú: Aspectos lexicológicos y lexicográficos

Contreras Gamonal, Magnolia Mery January 2016 (has links)
El objetivo de esta tesis es dar cuenta de la formación, origen y caraterización de los términos que conforman el lenguaje especializado de la industria de la construcción civil. Con este objetivo y dadas la amplitud y complejidad de las diversas áreas que integran la construcción civil (ferrería, eletricidad, sanitarios, carpintería y albañilería), hemos tratado de incluir en mayor proporción a aquellos términos procedentes del área de la albañilería. Si consideramos que la construcción en general constituye una de las actividades más antiguas del mundo, no es de extrañar que el hombre haya empleado diversos tipos de herramientas, materiales y procedimientos de acuerdo con la región en la que habitaba. Asimismo, con el fin de mejorar la calidad y rapidez del trabajo, el hombre se habría visto obligado a recurrir a nuevos o mejorados materiales y herramientas, así como a especializarse en ciertas tareas. Como efecto de todo ello, empieza a desarrollarse el léxico de la construcción que constituye el objeto de nuestro estudio. Los resultados obtenidos muestran que este léxico proviene básicamente del latín a través del castellano, y en menor proporción, de otras lenguas (catalán, italiano, quechua, griego, aimara, etc). Además, encontramos que este léxico está constituído por neologismos y recursos expresivos como resultado en el proceso de desarrollo de esta industria. En la formación de estas expresiones ha contado con los recursos expresivos del castellano como una necesidad de contar con expresiones para denominar y diferenciar dichos materiales, herramientas, implementos o procesos. Para la obtención de estos resultados, se llevaron a cabo diversas tareas, las mismas que se ven reflejadas en la estrutura del trabajo y que expandiremos en el Capítulo 4. En el capítulo 1 se identifica el problema del estudio. Como parte de este aspecto se mencionan los objetivos, los interrogantes y la justificación del trabajo. Se continúa con los antecedentes, marco teórico y las hipótesis correspondientes. En el desarrollo del trabajo se procederá a especificar la metodología de la investigación. En el Capítulo 2 nos referimos a las funciones de los trabajadores de la construcción civil. Luego, se procede a describir las diversas tareas (llamadas ‘operaciones’ en los manuales de SENCICO) que se llevan a cabo en el área de la albañilería durante la construcción de una vivienda familiar de un piso, tarea a cargo de un maestro de obras, quien podría contar con el apoyo de un ingeniero civil. La actividad principal de esta parte de este trabajo, consiste en la inclusión de la información sobre los materiales, herramientas e implementos necesarios para cada tarea, así como quién las ejecuta. En el Capítulo 3 se elabora el diccionario en base a los datos sobre la construcción y su correspondiente terminología. En el Capítulo 4 se caracteriza el léxico de la construcción civil en base a criterios semánticos y morfo-sintácticos. En el último capítulo se presentan las conclusiones sobre el origen, formación y caracterización del léxico de la construcción civil. La bibliografía sobre lingüística y sobre construcción civil se clasificará en textos físicos y virtuales. En los anexos se incluirán la relación de figuras y tablas; la transcripción de las entrevistas, una muestra del recojo de información de (12) términos, un glosario general con los términos mencionados en el Capítulo 2 y no incluidos en el diccionario del Capítulo 3 y una clasificación de los materiales, herramientas, implementos, procesos y acciones del Capítulo 3 en las diversas fases de la Construcción Civil.
93

Evaluación técnica económica de la construcción en PVC Sistema RBS

Campos Vasquez, Maria del Carmen January 2008 (has links)
El presente trabajo es una contribución para dar a conocer a un nuevo sistema no convencional "Royal Building System" o RBS la traducción literal no es muy precisa en el sentido que se le quiere dar a la denominación del sistema, no es un sistema de construcción real sino un sistema de construcción que usaría la realeza en el mas amplio sentido del marketing. Esta tesis pretende analizar los componentes de los Sistemas convencionales y no convencionales, para la fabricación de ambientes, de características similares y las correspondientes normas aplicables.
94

Plan de negocios para una empresa prestadora de servicios relacionados con la construcción INSER Ltda "Ingeniería de Servicios"

Sepúlveda Franco, Carolina January 2013 (has links)
Magíster en Gestión y Dirección de Empresas / El siguiente trabajo de grado es un plan de negocios para la puesta en marcha de una empresa prestadora de servicios relacionados con la construcción, entre los cuales se encuentran plomería, latonería, pintura, electricidad, etc. Parte de la necesidad de los hogares Santiaguinos de contratar a través de una empresa legalmente constituida, servicios de este tipo. Como marco conceptual se tiene en cuenta el proceso de administración estratégica que empieza con un análisis del entorno externo para obtener sus oportunidades y amenazas; en el entorno interno se encuentran los recursos, capacidades y competencias de la empresa para perseguir las oportunidades y combatir las amenazas. Con estos recursos estratégicos la organización eligió varias estrategias, definió su ventaja competitiva durable y diferenciadora; decidió la forma de implementarla. Una vez la empresa formula e implementa una estrategia crea valor, logra competitividad estratégica y por lo tanto rendimientos superiores al promedio, y finalmente satisfacer las necesidades que hoy presentan los clientes que no han sido atendidas parcial o totalmente. El plan de marketing está respaldado en un análisis de mercado que permite caracterizar los clientes potenciales así como los servicios que se contratan actualmente y las características del servicio ideal, así mismo se realizó una encuesta a clientes potenciales cuyos resultados permitieron inferir si los consultados están dispuestos a emplear este tipo de servicios, determinar cuáles de ellos contratan y su disposición a pagar dado que se prestaría de una forma diferente a la tradicional (con una ventaja competitiva), lo cual dará vía libre al diseño del servicio que permite cumplir con una promesa de calidad, seguridad, disponibilidad y garantía. De esta manera y a partir de los conceptos de administración de la cadena de servicios que caracteriza al cliente se describen los servicios que van a generar la diferenciación en el mercado, la estructura de la empresa, perfiles de cargos y administración, contratación del personal operativo que garantiza la profesionalización del servicio y la cadena de atención al cliente con los momentos de verdad y sus respectivos KPI´s. Finalmente el trabajo describe el flujo de caja del proyecto y la evaluación de rentabilidad con un análisis de sensibilidad permite concluir la viabilidad del plan de negocio desde el punto de vista de mercado y financieramente.
95

Implementación de BIM en Proyectos Inmobiliarios

Salinas, José Roberto, Ulloa Román, Karem Asthrid 19 August 2014 (has links)
karem_1408@hotmail.com / Significant growth in demand for housing, has led to real estate and construction companies accelerating their design processes, leading to deficiencies such as lack of detail, inconsistencies, and inconsistencies crosses between specialties, creating problems that affect the construction process. BIM is presented as an important proposal to manage design and construction through the digital representation of a product (model) that is developed collaboratively, that is, a totally new approach to the practice and promotion of professions requiring implementation of new policies , contracts and relations between stakeholders of the project (Kymmell, 2008) . Implementing BIM and obtaining benefits involves a change in the approach to project management. Succar (2009) proposes a framework for those involved in the architecture, engineering, construction and operations (AECO) industries to understand the fields of action of BIM, the stages of implementation and the objectives to be achieved with implementation. In order to demonstrate that BIM is applicable and beneficial, this paper presents metrics that show improvements upon implementation of BIM in a real estate and construction company, that involved stakeholder from the early stages within the collaborative development of the organization’s BIM model. / Debido al importante crecimiento de la demanda de viviendas, las empresas inmobiliarias y constructoras se han visto en la necesidad de acelerar sus procesos de diseño, presentándose deficiencias como falta de detalles, incompatibilidades y cruces entre especialidades e inconsistencias que generan problemas que repercuten en el proceso de construcción. BIM se presenta como una propuesta importante en la gestión de diseño y construcción a través de la representación digital de un producto (modelo) que es desarrollado colaborativamente, es decir es un enfoque totalmente nuevo para la práctica y la promoción de las profesiones que requiere la implementación de nuevas políticas, contratos y relaciones entre los involucrados del proyecto (Kymmell, 2008). Implementar BIM y obtener sus beneficios implica un cambio en el enfoque de la gestión de los proyectos, Succar (2009) propone un marco que permite que los involucrados que forman parte de la industria de arquitectura, ingeniería, construcción y operaciones (AECO, por sus siglas en inglés) entiendan los campos de acción de BIM, sus etapas de implementación y los objetivos que se deben alcanzar con su implementación. Con el objeto de demostrar que BIM es aplicable y beneficioso, se presenta las métricas de mejoras de la implementación de una empresa inmobiliaria y constructora en la que se tuvo en cuenta a los involucrados desde etapas tempranas en torno al modelo BIM desarrollado colaborativamente por la misma organización.
96

Análisis de alternativas de eliminación de material en la ejecución de una edificación de once sótanos en la ciudad de Lima

Parián Rivera, Junior Anthony Brantt 15 February 2017 (has links)
La presente tesis desarrolla el tema de eliminación de material excedente de tierra, la cual forma parte de la partida de movimiento de tierras en la construcción de edificaciones. Sin embargo, a diferencia de otros estudios orientados al desarrollo de procesos constructivos, el alcance de esta investigación es el análisis de alternativas de eliminación en función a diferentes características de un proyecto tales como la cantidad de sótanos, el área del terreno y el rendimiento de muros anclados diarios del proyecto. Las alternativas son las siguientes: conformación de rampas para el acceso de los volquetes al terreno, conformación de banquetas para una eliminación maquinaria-volquete, el método del pasamanos, el método cuchara a cuchara, el uso de la faja transportadora y el uso de baldes basculantes izados mediante grúa torre o grúa móvil. Para la decisión de la mejor alternativa se analizan los indicadores de costo y tiempo considerando los ciclos de duración, cantidad de horas hombre y máquina utilizadas, instalación de los medios, combustible, energía consumida y otras variables incidentes. El análisis es en la ejecución de un edificio de oficinas ubicado en el distrito de San Isidro. El proyecto en mención cuenta con 20 pisos y 11 sótanos construidos en un área de terreno de aproximadamente 1300m2, por lo cual es un ejemplo de aplicación interesante debido a la presencia de un gran número de sótanos en un área de terreno limitada en relación a la profundidad de ejecución. El análisis de las diferentes alternativas de eliminación, en función al avance del proyecto, se realiza bajo los lineamientos del ciclo de Deming ya que es una estrategia que busca la mejora continua de los procesos de un proyecto. De igual manera se muestra la importancia de la partida crítica de movimiento de tierras y de qué manera incide en el cumplimiento de partidas simultáneas y plazos internos del cronograma meta o contractual del proyecto. / Tesis
97

Metodologías constructivas de la base del plinto de la central hidroeléctrica Chaglla

Aguila Sáenz, Esteban Julián del 04 September 2014 (has links)
El Proyecto Hidroeléctrico Chaglla se encuentra en el valle del río Huallaga, a 40km de la ciudad de Tingo María, dentro del departamento de Huánuco. El presente estudio se centra en la base del plinto de la presa de enrocado con pantalla de concreto del proyecto. Durante la ejecución del Plinto, se desarrolló un diseño inicial en base a los estudios preliminares realizados en el área de influencia de la estructura. Sin embargo, al empezar los trabajos de ejecución de la presa, se observó y determinó que las características del área eran diferentes a los resultados de los estudios antes realizados. La nueva información obtenida provocó la modificación del diseño inicial por una solución de ingeniería completamente diferente. Por otro lado, las condiciones y realidad de la obra, así como las características de la zona, nos llevó a optar por una nueva alternativa de construcción, alterando nuevamente el proyecto. El objetivo principal es describir y reportar, en base al análisis y estudio, las diferentes soluciones de ingeniería y metodologías constructivas a aplicar en la base del plinto como producto de las diferentes modificaciones ingenieriles que se hicieron en esta estructura. / Tesis
98

Planeamiento integral de la construcción de cuatro bloques de cincuenta viviendas unifamiliares para el programa Mi Vivienda

Ulloa Clavijo, Juan Manuel 09 May 2011 (has links)
La tesis que se presenta a continuación consiste en la preparación del planeamiento integral y controles de obra para el desarrollo de un proyecto inmobiliario a construirse en la ciudad de Trujillo. El proyecto abarca la construcción de 200 módulos de vivienda unifamiliares, bajo las consideraciones del actual programa nacional de vivienda que patrocina el Fondo Mi Vivienda, dentro del Reglamento de Habilitación y Construcción Urbana Especial vigente para estos programas de vivienda. / Tesis
99

Generación de valor municipal : learning loops de los reclamos de post ocupación en proyectos de edificación

Corrales Cáceres, Jaclyn Luz 10 August 2017 (has links)
Los municipios tienen la finalidad de mantener el bienestar y tranquilidad de sus residentes, lo que logran a través de servicios públicos que brindan. Uno de estos servicios es la gestión municipal en proyectos de edificación, el cual actualmente no está siendo ofrecido de la forma más adecuada debido al déficit de atención que están presentando los municipios. Los principales factores de esto son a) Bajo presupuesto recaudado para intervenir en los proyectos de edificación, b) Normativas, reglamentos y leyes que no regulan apropiadamente la gestión municipal y c) Contratación de personal no calificado para desempeñar funciones en el Comité Tecnico y como Revisores Urbanos. En vista de ello se propone una metodología de gestión a través del uso de información de post ocupación que se obtiene de reclamos producidos después de la entrega y habitación de la unidad de vivienda. Este modelo es el Lean Project Delivery System (LPDS), cuya finalidad es agregar valor a una gestión al obtener bucles de aprendizaje para alinear los fines, medios y restricciones de proyectos futuros de edificación a partir de la evaluación de proyectos ya ejecutados. (Ballard, 2008) Por consiguiente se establece la importancia de la gestión municipal sobre la revisión y aprobación del ante proyecto y proyecto definitivo, la fiscalización de obra y la entrega y conformidad de obra dentro de las partes del LPDS, lo que permitirá dirigir la información de post ocupación a su origen (Causa Raíz), ligando esto a las responsabilidades y funciones del municipio. Finalmente, la metodología es evaluada en un estudio de caso donde se propone el indicador “Número de Reclamos por Unidad de Vivienda” (NRUV), mediante el cual se evalúa el valor de la implementación de la metodología de gestión municipal bajo el enfoque del LPDS: NRUV DISTRITO = N° Reclamos entre los años [(X-1), X] / N° Unidades de Vivienda Autorizadas [(X-3), (X-2)]. Dónde: (X) Año de Estudio (a) Información de Reclamos de Post Ocupación del registro de INDECOPI. (b) Oferta de Unidades de Vivienda Autorizadas obtenida del Estudio de Mercado de Edificaciones de Lima y Callao, CAPECO. Para concluir se espera que con esta metodología propuesta se genere valor a la gestión municipal actual y que sea aplicable a cualquier distrito que esté dispuesto a implementar el sistema. / Tesis
100

Diseño mecatrónico de un robot para guía de biblioteca

Sánchez Sifuentes, Ana Cristina Midori 08 July 2015 (has links)
Con el crecimiento exponencial de la tecnología en los últimos años se ha optado por aplicar soluciones robóticas a diferentes problemas que el mundo real presenta. Algunas de estas soluciones se ven reflejadas en robots dedicados a brindar ayuda o entretenimiento a las personas. Dichos robots deben cumplir con su tarea y además tener las características externas necesarias para tener la aceptación del público objetivo. Es decir como tienen una interacción directa con el usuario no deben solo cumplir con la parte de máquina funcional, sino también las características necesarias para obtener una buena interacción humano robot. En la actualidad, esta clase de robots se encuentran en laboratorios, centros comerciales, museos e incluso en fábricas, dispuestos a brindar información o dar servicio de guía. Sin embargo aún no se encuentran en una biblioteca y ahora con la construcción de bibliotecas más tecnológicas, que cuentan con nuevos servicios como áreas de videoconferencias, áreas de impresión 3D y de manufactura digital, estantes de libros abiertos o cubículos con recursos multimedia, se debe informar al público para que éste conozca las nuevas posibilidades a la hora de acudir a la biblioteca. Para brindar información en algunos lugares se ha optado por utilizar paneles led o pantallas táctiles, lo cual no es eficiente, puesto que con las primeras no se tiene una interacción, sólo brinda información de manera cíclica y por otro lado las segundas se deterioran con el uso constante, en especial cuando no las usan de manera adecuada. Esto se podría mejorar con la utilización de un robot, puesto que la información la puede brindar de manera no sólo táctil sino también acústica. Además esta clase de robots motiva la curiosidad de las personas, logrando captar mejor su atención y atrayendo más usuarios a un área donde podrán adquirir conocimientos. Por tales motivos, en la presente tesis se desarrollará un diseño mecatrónico de un robot para guía de biblioteca que pueda brindar la información necesaria para dar a conocer los servicios con los que cuenta una biblioteca de una manera amena y agradable al usuario. Asimismo es una forma más eficiente que las otras soluciones no tienen, pues interactúa con las personas y no se desgasta fácilmente con el tiempo. / Tesis

Page generated in 0.0359 seconds