• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 7
  • 4
  • 1
  • 1
  • Tagged with
  • 13
  • 13
  • 7
  • 6
  • 5
  • 5
  • 4
  • 3
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Value stream mapping on foam injection moulding process-- the starting point of a six sigma project

Srivastava, Prashant. January 2005 (has links) (PDF)
Thesis, PlanB (M.S.)--University of Wisconsin--Stout, 2005. / Includes bibliographical references.
2

On decision variable contingency and system desensitization in process design

Engelstad, Donald George, January 1970 (has links)
Thesis (Ph. D.)--University of Wisconsin--Madison, 1970. / Typescript. Vita. eContent provider-neutral record in process. Description based on print version record. Includes bibliographical references.
3

Factors in the successful implementation of Six Sigma in Canadian manufacturing firms /

Tran, David, January 1900 (has links)
Thesis (M.B.A.) - Carleton University, 2006. / Includes bibliographical references (p. 126-132). Also available in electronic format on the Internet.
4

Successful pollution control through cleaner production myth or reality /

Ouano, Ely Anthony Rosales. January 2007 (has links)
Thesis (PhD) -- Macquarie University, Division of Law, Centre for Environmental Law, 2007. / "July 2007". Bibliography: p. 334-369. Also available in print form.
5

Simulação dinâmica de planta de condicionamento de gás natural em plataforma offshore / Dynamic simulation of natural gas conditioning plant in offshore platform

Pimenta, Luciana Bispo 19 August 2018 (has links)
Orientador: Maria Regina Wolf Maciel / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Química / Made available in DSpace on 2018-08-19T10:31:27Z (GMT). No. of bitstreams: 1 Pimenta_LucianaBispo_M.pdf: 3231978 bytes, checksum: c2de8436ce07b62fabe1af47e5020ef1 (MD5) Previous issue date: 2011 / Resumo: O comportamento dinâmico em unidades de produção de óleo é muito importante para a operação e projeto de equipamentos. O desenvolvimento da tecnologia no processamento primário de petróleo é caracterizado pela otimização de peso e espaço nas unidades de produção. Estas restrições têm sido diretrizes para pesquisas em desenvolvimento de equipamentos mais eficientes e compactos, como hidrociclones. Porém, esta capacidade de compactar equipamentos resultou em redução na flexibilidade em operar com oscilações de carga (golfadas). Ao longo dos últimos anos, a maturação de campos produtores e o aumento na produção de água e no uso de gás lift associados à produção de óleo em lâminas d'água cada vez mais profundas têm aumentado a freqüência de golfadas. A simulação dinâmica pode ser utilizada para desenvolver estratégias para controlar situações transientes em plataformas offshore. Este trabalho utilizou a simulação dinâmica de uma planta de condicionamento de gás natural em plataforma offshore feita no simulador de processos HYSYS 7.2, como ferramenta para analisar a planta e propor melhores condições de operação. Neste trabalho duas situações serão analisadas. Na primeira, apenas o gás associado passa pelo sistema de compressão e o gás não associado é encaminhado diretamente para desidratação com TEG (situação 1). Na segunda, haverá uma quebra de pressão do gás proveniente dos poços de gás e este deverá ser encaminhado para o sistema de compressão juntamente com o gás proveniente dos poços de óleo (situação 2). Em um primeiro momento, a planta foi analisada em modelo de estado estacionário e foi avaliado o efeito da quebra de pressão na temperatura da tubulação à jusante das válvulas responsáveis pela quebra (situação 2). Em um segundo momento, a planta foi avaliada no estado dinâmico, onde foi possível analisar o efeito que as oscilações de carga têm no sistema de compressão da planta, bem como nas trocas térmicas. Este segundo estudo foi avaliado para as situações 1 e 2. Para o estudo em estado estacionário, foi possível observar que a especificação de temperatura mínima de projeto para a tubulação à jusante das válvulas que efetuam a quebra de pressão não é alcançada, porém, existe uma faixa de ?P ideal para cada válvula a fim de evitar a formação de gelo na parte externa da tubulação. Para o estudo dinâmico foi possível avaliar os efeitos que as oscilações de carga trazem para o sistema de compressão e em que situação (1 ou 2) a planta opera com maior estabilidade. Verificou-se que o trocador da saída do sistema de compressão opera com certa instabilidade na situação 1 devido à baixa vazão de gás a ser resfriado e na situação 2 esta instabilidade é reduzida. As conclusões deste estudo mostram a importância da simulação dinâmica como ferramenta de decisão para o engenheiro de processamento de gás na operação da planta / Abstract: Dynamic behavior in oil production units is vital for equipments project and operation. Technology development in offshore primary processing has traditionally been characterized by optimizing weight and space in their production units. Such restrictions have been the guidelines for researches in developing more efficient and compact equipments, such as hydro cyclones. However, this compactness has resulted, invariably, in reduced capacity to deal with load oscillations, typical in offshore units. Along the last years the maturation of production fields, and the increase of water production and gas lift use, associated to the oil production in larger and larger water depths have been increasing slugs intensity. Dynamic simulation can be used to develop better strategies to control transient situations in offshore units. This study use a dynamic simulation of a natural gas offshore conditioning plant as a tool to analyze the plant and to propose better operational conditions. The process simulator to do dynamic simulation was HYSYS 7.2. In this work two situations were analyzed. In the first one, only the gas from oil wells pass through the gas compression system and the gas from gas wells are forwarded directly to dehydration with TEG (situation 1). In the second situation, there will be a pressure drop of the gas from gas wells and this gas should be forwarded to the compression system along with gas from oil wells (situation 2). At first, the plant was analyzed in steady state model and the effect of pressure drop in pipe temperature downstream of the valves responsible for pressure drop was evaluated (situation 2). In a second stage the plant was evaluated in dynamic state where it was possible to analyze the effect of load oscillations in the compression system, as well as in the heat exchange. This second study was evaluated for situations 1 and 2. For the static study, the specification of minimum project temperature for the pipeline downstream of the valves that perform the pressure drop is not achieved but there is an ideal range pressure drop for each valve to prevent ice formation outside the pipe. In the dynamic study was evaluated the effects of load oscillations in compression system and in what situation (1 or 2) the plant operates with greater stability. It was found that the heat exchange of the output of the compression system operates with instability in the situation 1 due to the low flow of gas to be cooled, and in the situation 2 this instability is reduced. The conclusions of this study show the importance of dynamic simulation as a decision tool for the engineer in the gas processing plant operation / Mestrado / Desenvolvimento de Processos Químicos / Mestre em Engenharia Química
6

Uma aplicação de controle preditivo multiparamétrico em planejamento da produção / An application of multi-parametric predictive control in production planning

Kido, Rafael Hisashi Zanetti 12 July 2011 (has links)
Orientador: Paulo Augusto Valente Ferreira / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Elétrica e de Computação / Made available in DSpace on 2018-08-19T11:54:53Z (GMT). No. of bitstreams: 1 Kido_RafaelHisashiZanetti_M.pdf: 3168500 bytes, checksum: 878c22e520b0301cfac31c3f6b2b1ba7 (MD5) Previous issue date: 2011 / Resumo: Nesta dissertação, o problema de controle preditivo baseado em modelo, um problema de otimização não linear com critério de desempenho quadrático e restrições lineares, é reformulado via otimização quadrática multiparamétrica, em que as entradas de controle são as variáveis de otimização e os estados (no caso mais simples) representam um vetor de parâmetros. A resolução do problema multiparamétrico fornece as ações de controle ótimas para cada região onde possam estar situados os parâmetros de interesse. Um algoritmo para obtenção destas regiões - politopos - é apresentado. Fórmulas explícitas para a transformação de problemas preditivos clássicos (envolvendo tanto regulação de estados quanto regulação de saída) em problemas de controle preditivo multiparamétricos são derivadas. O algoritmo para regulação da saída, versão multiparamétrica, é então aplicada a um problema de planejamento da produção envolvendo a coordenação de esforços de produção/estoque e propaganda. Resultados computacionais demonstram a versatilidade que a abordagem paramétrica propicia ao processo de tomada de decisões em ambientes de planejamento / Abstract: In the present dissertation, the model based predictive control problem, a nonlinear optimization problem with quadratic performance criterion and linear constraints, is reformulated as a multi-parametric quadratic programming problem, in which the control inputs are the optimization variables and the states (in the simplest case) represent the parameter vector. The optimal solution of the multi-parametric problem provides the optimal control input for every single region where the parameters of interest may be located. An algorithm for obtaining all regions (politopes) is presented. Explicit formulas for the transformation of classical predictive problems (state regulation and output regulation, as well) in multi-parametric predictive control problems are provided. The output regulation algorithm in its parametric version is applied then to a production planning problem involving the production/inventory and the propaganda efforts. Computational results demonstrate the versatility of the parametric approach in production planning environments / Mestrado / Automação / Mestre em Engenharia Elétrica
7

Gerenciamento do bombeio de cavidades progressivas / Operational management of progressing cavity pum

Carvalho, Paulo Cesar Gasse de 12 September 1999 (has links)
Orientadores: Celso Kazuyuki Morooka, Sergio Nascimento Bordalo / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Mecanica / Made available in DSpace on 2018-07-25T22:21:03Z (GMT). No. of bitstreams: 1 Carvalho_PauloCesarGassede_M.pdf: 7671437 bytes, checksum: 5c73626d53d31bb65617b10db9e1c11a (MD5) Previous issue date: 1999 / Resumo: Neste trabalho, buscou-se desenvolver um sistema inteligente de acompanhamento e controle de poços, que permita avaliar periodicamente o desempenho operacional de um campo de petróleo, produzindo com os poços equipados com BCP - Bombeio de Cavidades Progressivas. O trabalho foi desenvolvido em duas etapas principais. Inicialmente, foi realizada uma revisão bibliográfica sobre o BCP, voltada para a identificação dos pontos fundamentais, para proporcionar um melhor funcionamento do sistema. Em seguida, com base na experiência acumulada nos últimos anos com o acompanhamento de campos de petróleo na Bahia, procurou-se propor um sistema de controle para gerenciamento das operações de um campo de petróleo, voltado para o BCP. Este sistema utiliza técnicas de inteligência artificial, como conjuntos nebulosos. Espera-se que os resultados apresentados neste trabalho possam servir de base a gerentes, engenheiros, supervisores e operadores, para obterem um desempenho contínuo e otimizado deste método de elevação, na produção de petróleo / Abstract: The main purpose of this work is to develop an intelligent system to management and control, that allows to periodically evaluate the operational performance of a petroleum field producing with the wells equipped with PCP - Progressing Cavity Pump. The work was developed in two main stages. Initially, it was accomplished a literature search about PCP, in order to identify its fundamental parameters that provide a better operation of the system. Afterwards, based on the experience obtained during the last years with the accompaniment of petroleum fields in Bahia, it is proposed acontrol system for management of the petroleum field operations, centered to PCP. This system uses techniques of artificial intelligence, as fuzzy sets, to obtain better interpolations. It is desired that the results presented in this Master' s thesis can be useful to managers, engineers, supervisors and operators to obtain a continuous and optimized performance of this artificial lift method, at the petroleum production / Mestrado / Mestre em Engenharia de Petróleo
8

Ganttovy diagramy / Gantt charts

Kantar, Martin January 2014 (has links)
The thesis is aimed at Gantt charts. Primarily on their use in production processes, such as planning and scheduling. The thesis also includes an introduction, explaining what are the Gantt charts, for what are using and what is their principle. The thesis also includes analysis and software possibilities for implementing Gantt charts with using OOP. Programmatic and theoretical analysis of the various functions that are characteristic of Gantt charts, including their internal logic and program implementation. These programmed characteristic functions of Gantt charts were composed in the form of a DLL library, which provides a simple implementation of Gantt charts. By using this library is realized the software for production management. The work is included on the DVD, except the DLL itself software with detailed descriptions of each part of the source code.
9

A gestão de estoques em sistemas produtivos Engineering-To-Order e Make-To-Stock: estudo de casos em empresas do setor gráfico

Rodrigues, Paulo Cesar Chagas [UNESP] 05 December 2008 (has links) (PDF)
Made available in DSpace on 2014-06-11T19:26:16Z (GMT). No. of bitstreams: 0 Previous issue date: 2008-12-05Bitstream added on 2014-06-13T20:34:06Z : No. of bitstreams: 1 rodrigues_pcc_me_bauru.pdf: 661198 bytes, checksum: fd2070d60a4818ea36d1e95ea50627af (MD5) / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES) / As organizações industriais vêm adotando modelos produtivos que priorizam a redução de custos e aumento da qualidade de seus processos e produtos. Neste contexto a otimização e racionalização da gestão de estoques é uma grande oportunidade para estas empresas conquistarem estes objetivos. Para a realização desta pesquisa optou-se pela metodologia de estudo de casos múltiplos (dois casos), para atender o objetivo de analisar a gestão de estoques em duas empresas do setor gráfico localizadas na região de Bauru, na qual uma adota o sistema produtivo Engineering-To-Order (ETO) e a outra o sistema produtivo Make-To-Stock (MTS). O qual foi alcançado por meio da triangulação dos meios de coleta de dados, ou seja, entrevista semi-estruturada, análise documental e observação in-loco e estes tiveram como embasamento o referencial teórico. Por meio da triangulação das informações obtidas durante a coleta de dados, pôde-se elaborar a descrição da gestão de estoques e do sistema produtivo adotado em cada uma das empresas apresentadas nos estudos de caso e a análise cruzada. Após estes procedimentos foi elaborada a análise da influência do sistema produtivo sobre a gestão de estoques, no qual foram analisados os seguintes itens: produção, previsão de demanda, sazonalidade, layout, gestão de estoques, setup, logística de suprimentos e logística de distribuição. / Industrial organizations are adopting productive models that prioritize the reduction of costs and increase the quality of their processes and products. In this context the optimization and streamlining the inventory management is a great opportunity for these companies conquer these goals. To achieve this research methodology was chosen for the study of multiple cases (two cases), to meet to evaluate the inventory management in two companies in the sector chart located in the region of Bauru, in which one adopts the production system. Which was achieved by means of triangulation of data collection, i.e., semi-structured interviews, document analysis and observation in loco and they were light as the theoretical framework. Through triangulation of information obtained during data collection, it was possible to develop a descritption of the inventory management and the production system used in each of the companies presented in case studies and crossexamination. After these procedures were developed to analyze the influence of the production system on the inventory management, which were analyzed in the following: production, estimates of demand, seasonality, layout, inventory management, setup, logistics supplies and logistics of distribution. While reviewing the analysis of the influence of the production system on the management of inventories could be observed some differences in relation to the literature, they are: logistics supply, distribution, inventory management, production systems Make-To-Stock and Engineering-To-Order.
10

A gestão de estoques em sistemas produtivos Engineering-To-Order e Make-To-Stock : estudo de casos em empresas do setor gráfico /

Rodrigues, Paulo Cesar Chagas. January 2008 (has links)
Orientador: Otávio José de Oliveira / Banca: Fernando Bernardi de Souza / Banca: Marcel Andreotti Musetti / Resumo: As organizações industriais vêm adotando modelos produtivos que priorizam a redução de custos e aumento da qualidade de seus processos e produtos. Neste contexto a otimização e racionalização da gestão de estoques é uma grande oportunidade para estas empresas conquistarem estes objetivos. Para a realização desta pesquisa optou-se pela metodologia de estudo de casos múltiplos (dois casos), para atender o objetivo de analisar a gestão de estoques em duas empresas do setor gráfico localizadas na região de Bauru, na qual uma adota o sistema produtivo Engineering-To-Order (ETO) e a outra o sistema produtivo Make-To-Stock (MTS). O qual foi alcançado por meio da triangulação dos meios de coleta de dados, ou seja, entrevista semi-estruturada, análise documental e observação in-loco e estes tiveram como embasamento o referencial teórico. Por meio da triangulação das informações obtidas durante a coleta de dados, pôde-se elaborar a descrição da gestão de estoques e do sistema produtivo adotado em cada uma das empresas apresentadas nos estudos de caso e a análise cruzada. Após estes procedimentos foi elaborada a análise da influência do sistema produtivo sobre a gestão de estoques, no qual foram analisados os seguintes itens: produção, previsão de demanda, sazonalidade, layout, gestão de estoques, setup, logística de suprimentos e logística de distribuição. / Abstract: Industrial organizations are adopting productive models that prioritize the reduction of costs and increase the quality of their processes and products. In this context the optimization and streamlining the inventory management is a great opportunity for these companies conquer these goals. To achieve this research methodology was chosen for the study of multiple cases (two cases), to meet to evaluate the inventory management in two companies in the sector chart located in the region of Bauru, in which one adopts the production system. Which was achieved by means of triangulation of data collection, i.e., semi-structured interviews, document analysis and observation in loco and they were light as the theoretical framework. Through triangulation of information obtained during data collection, it was possible to develop a descritption of the inventory management and the production system used in each of the companies presented in case studies and crossexamination. After these procedures were developed to analyze the influence of the production system on the inventory management, which were analyzed in the following: production, estimates of demand, seasonality, layout, inventory management, setup, logistics supplies and logistics of distribution. While reviewing the analysis of the influence of the production system on the management of inventories could be observed some differences in relation to the literature, they are: logistics supply, distribution, inventory management, production systems Make-To-Stock and Engineering-To-Order. / Mestre

Page generated in 0.1097 seconds