• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 1
  • 1
  • Tagged with
  • 5
  • 5
  • 5
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Upgrade the Saudi Arabian Procurement System Delivery Method

January 2015 (has links)
abstract: Saudi Arabia has been having many issues with large construction projects such as delays, low performance and high cost. Some studies show that around 70% of the public projects in Saudi Arabia are delayed. These issues have resulted from many factors. One of the factors believed to be delaying projects is the Saudi procurement system. The Saudi procurement system only selects contracts based on the lowest bid price offered. However, the Saudi procurement system has been found to not only produce delayed low quality projects, but also has resulted in higher costs. This paper shows how to modify the Saudi procurement system by implementing a clarification phase, which is the most important phase in the Performance Information Procurement System (PIPS). The clarification phase requires the bid’s winning contractor to submit a project scope, a project schedule, to identify risks that not their responsibility, performance measurements and a milestone schedule. The PIPS system has been one of the most successful systems around the world and has shown a 98% success rate in six different countries with risks and cost reductions up to 30%. This research conducted a survey of 157 engineers, 33 consultants, 9 owners, 5 vendors, 13 academics, and 28 architects to develop the public procurement system in Saudi Arabia. The participants work in government sectors with an interest in the Saudi Arabian procurement system. 80.61 % of participants believe that the traditional Saudi procurement system consistently selects poor performing contractors. Moreover, 95.97% of participants think that the selection of contractors based only on the lowest price criterion affects projects negatively. Also, 96.20% of participants in the survey feel that there needs to be a change in the traditional Saudi Arabian procurement system. 88.7% of participants agree to require the contractor to identify risks, and 96.03 % of participants agree that the contractors must have a plan. Moreover, 95.45% of participants agree to require a contractor review the scope of a project and verify that it is correct. Finally, 82.18% of participants agree to require a contractor to resolve all owner concerns before signing a contract to improve construction projects performance. The paper shows the need to change the Saudi procurement system and a solution to this growing problem. / Dissertation/Thesis / Masters Thesis Construction 2015
2

Uma avaliação comparativa entre os métodos design-build e o design-bid-build para redução de problemas entre projeto e contrução de obras públicas brasileiras

ALBUQUERQUE, Ana Elisabete Cavalcanti de 31 May 2012 (has links)
Submitted by Suethene Souza (suethene.souza@ufpe.br) on 2015-03-03T18:32:34Z No. of bitstreams: 2 DissertacaoDesignBuild.pdf: 3398710 bytes, checksum: ef609f38cfa0477d8bd3c9f076675594 (MD5) license_rdf: 1232 bytes, checksum: 66e71c371cc565284e70f40736c94386 (MD5) / Made available in DSpace on 2015-03-03T18:32:34Z (GMT). No. of bitstreams: 2 DissertacaoDesignBuild.pdf: 3398710 bytes, checksum: ef609f38cfa0477d8bd3c9f076675594 (MD5) license_rdf: 1232 bytes, checksum: 66e71c371cc565284e70f40736c94386 (MD5) Previous issue date: 2012-05-31 / Este estudo objetiva identificar as contribuições do método design-build, bem como riscos envolvidos na sua adoção, com vistas à minimização de problemas entre projeto e construção de obras públicas, oriundos em parte da dissociação entre projeto e construção imposta pela legislação brasileira ao determinar contratações distintas para ambos. Para que as contribuições do método fossem visualizadas foi necessário compará-lo ao que atualmente é utilizado pela Administração, método design-bid-build. Assim, foi realizado um estudo de caso de natureza qualitativa, no qual foram realizadas pesquisas documentais e de campo, na forma de entrevistas. Sobre os dados documentais e de campo foi aplicada análise de conteúdo, bem como triangulação de métodos e fontes, o que possibilitou investigar os problemas sob pontos de vistas diversos, captados por métodos diferentes, oferecendo um panorama bem mais próximo da realidade. Dentre os problemas identificados figuram falta de interação direta entre projetistas e construtoras, prazos irreais determinados pelo contratante para elaboração dos projetos e longo período de tempo entre concepção do projeto e efetiva execução da obra. Identificados os problemas foi verificado quais deles poderiam ser solucionados ou minimizados com a adoção do método de contratação design-build, considerando sua principal característica de concepção do projeto e execução da obra realizados por uma única empresa, em uma única contratação. Ao mesmo tempo, com vistas a uma possível adoção do método, foram levantados aspectos negativos, riscos prováveis e respectivas estratégias de enfrentamento. Dentre os aspectos críticos observados pelos entrevistados sobressaíram a possibilidade da empresa contratada se beneficiar elaborando um projeto ajustado às suas disponibilidades e não à real necessidade do contratante, associada à falta de estrutura dos órgãos públicos para exercerem o controle requerido pelo método design-build. Verificou-se que o método design-build seria uma solução possível para alguns dos problemas encontrados. Entretanto, o contratante deve precaver-se dos aspectos negativos e riscos possíveis, adotando medidas que eliminem ou minimizem seus efeitos. Os resultados encontrados contribuirão certamente não apenas para uma possível implantação do método, em contextos inclusive distintos do público, como também para a melhoria dos processos concernentes a projeto e execução de obras, independente do método de contratação porventura utilizado. No âmbito acadêmico poderá contribuir incentivando a realização de mais pesquisas sobre projeto e execução de empreendimentos de construção
3

An Investigation of Project Delivery Methods Relating to Repetitive Commercial Construction

Patterson, Donald A. 10 July 2014 (has links) (PDF)
The Design/Bid/Build (DBB) delivery method has historically been the most popular and the most effective means of determining the least cost for building a project based upon a set of construction documents. In recent years, however, other project delivery methods, including but limited to Construction Manager/General Contractor (CM/GC) and Design/Build (DB), have slowly taken a share of the construction market away from the DBB delivery method. The choice of delivery method that will produce the best value for an owner in the measurements of efficiency in quality, cost, and timeliness depends upon the type of project and the business culture of the project owner. A unique opportunity for a comparative study was presented by the Meetinghouse Facilities Department (MFD) of the Church of Jesus Christ of Latter-day Saints. The MFD completed over 200 repetitive meetinghouse projects in the U.S. over a five-year period (1999-2003), contracting approximately two-thirds of the projects using a CM/GC delivery method with an attached partnering agreement. The remaining meetinghouses were contracted using a DBB delivery method. A comprehensive comparison was conducted measuring all of the efficiencies created by the selection of delivery method, including short- and long-term costs, direct and indirect costs, construction cycle time, and quality assessment scores. After identifying and then adjusting for several confounding variables in the historical data, the statistical analysis provided evidence that the CM/GC delivery method proved to be the best value for the MFD by producing a total cost savings of over 5.5 percent on the meetinghouse projects when compared to the DBB meetinghouse projects. Construction cycle time was 20% shorter on the CM/GC meetinghouse projects and quality assessment (QA) scores were consistently higher. In regards to a 10-year life cycle repair costs, the CM/GC delivery method produced a higher quality meetinghouse, reducing repair costs by 34% when compared to the DBB meetinghouse projects.
4

Quality of Detailed Construction Documents in Design-Bid-Build Contracts : Perceptions of Clients and Consultants / Kvalitet i bygghandlingar för utförandeentreprenader : Beställarnas och konsulternas uppfattningar

Lazic, Kamelia, Melek, Justyna January 2024 (has links)
The detailed design phase of construction projects marks a critical moment when conceptual ideas andmethods are developed into precise technical specifications, crucial for project execution. Existingresearch shows that insufficient and incomplete construction documents lead to poor integrationbetween design and production, resulting in conflicts and communication barriers. These shortcomingscompromise the integrity of the project and lead to rising costs for clients. Thus, there is a need forincreased commitment from both the client and the design consultant to ensure the quality of theconstruction documents provided to the contractor. This study identified the factors affecting the quality of construction documents in the context ofdesign-bid-build contracts, focusing specifically on the perceptions of clients and consultants in theSwedish infrastructure sector. Furthermore, the study evaluated the responsibilities of clients andconsultants, assessed compliance with governing guidelines and requirements, and suggestedopportunities for their development. Garvin’s eight dimensions of quality, ISO 9001:2015 andorganisational culture were applied as theoretical frameworks. The study employed both qualitativeand quantitative approaches, conducted through questionnaires, document analysis, and semistructured interviews. The results revealed several interrelated factors that influence the quality of construction documents,including competence and experience; quality processes and quality assurance; communication,coordination, and collaboration; budget and form of remuneration; clear documents from the client;and time schedules. Furthermore, the study showed a shared responsibility between clients andconsultants in ensuring the quality of construction documents. Inconsistent compliance with governingguidelines and requirements has been demonstrated. Factors challenging adherence to the guidelinesand requirements include time constraints, high workload, unclear instructions, communication gaps,and reliance on verbal agreements. Regarding the development of guidelines and requirements forpractical and realistic implementation, the study showed that guidelines should outline solutions andsteps for meeting the requirements, but also that the processes must be adapted to specific projects.Based on the conclusions, it is established that the factors influencing quality should be consideredfrom the beginning of the detailed design phase. Clients and consultants should be aware of theirresponsibilities. The focus should be on clear communication and documentation, realistic timeschedules, and adaptable processes to improve compliance with guidelines and the overall quality ofconstruction documents. / Detaljprojekteringsfasen i byggprojekt är en kritisk tidpunkt där konceptuella idéer och metoderutvecklas till tekniska specifikationer och är avgörande för projektutförandet. Befintlig forskning visaratt otillräckliga och bristfälliga bygghandlingar leder till dålig integration mellan design ochproduktion. Detta kan leda till konflikter och hindra kommunikation, vilket äventyrar projektetsintegritet och bidrar till tidsförseningar och stigande kostnader för beställaren. Således finns det ettbehov av ökat engagemang från både beställare och projekterande konsulter för att säkerställakvaliteten på bygghandlingarna som tillhandahålls entreprenören. Denna studie fördjupade sig i faktorer som påverkar kvaliteten på bygghandlingar inom ramen förutförandeentreprenader, med ett specifikt fokus på upplevelsen hos beställare och konsulter i densvenska infrastruktursektorn. Studien identifierade nyckelfaktorer som påverkar kvaliteten påbygghandlingar, utvärderade beställarens och konsulternas ansvar för kvalitet, bedömde efterlevnadenav styrande riktlinjer och krav samt utforskade möjligheter till utveckling av dessa. Garvins åttakvalitetsdimensioner, ISO 9001:2015 och organisationskultur användes som teoretiska ramverk.Studien utfördes genom kvalitativ och kvantitativ metodik via enkäter, semistrukturerade intervjueroch dokumentanalys. Resultatet visade flera sammankopplade faktorer som påverkar kvaliteten på bygghandlingar, blandannat kompetens och erfarenhet, kvalitetsprocess och kvalitetssäkring, kommunikation och samarbete,budget och ersättningsform, tydliga dokument från beställaren och tidplaner. Vidare visade studien attdet är ett delat ansvar mellan beställare och konsulter att säkerställa kvaliteten på bygghandlingar. Eninkonsekvent efterlevnad av styrande riktlinjer och krav har påvisats. Faktorer som utmanarefterlevnaden av riktlinjer och krav är tidsbegränsningar, hög arbetsbelastning, otydliga instruktioner,kommunikationsbrist och att förlita sig på muntliga överenskommelser. Gällande utveckling avriktlinjer och krav för praktisk och realistisk implementering, visade studien bland annat att riktlinjerbör beskriva lösningar och steg för hur kraven kan uppnås, men även att processerna ska varaanpassade till det specifika projektet. Utifrån slutsatserna konstaterades att hänsyn bör tas till depåverkande faktorerna redan i början av projekteringsfasen. Beställare och konsulter ska varamedvetna om sitt ansvar. Fokus ska ligga på tydlig kommunikation och dokumentation, realistiskatidsramar samt anpassningsbara processer för att förbättra efterlevnaden av riktlinjer och denövergripande kvaliteten på bygghandlingar.
5

Metoda Design-Build a její použití pro zadávání v ČR / Design-Build Delivery Method and its Respective Application in the Czech Republic

Paníček, Patrik January 2019 (has links)
This Diploma thesis follows up the award of public contracts using the Design-Build method. The first part focuses on the description of individual procurement methods and their advantages and disadvantages. In addition, the basic types of FIDIC terms and connditions are compared here. The second part describes and evaluates the terms of reference for specific projects commissioned by Design-Build in the Czech Republic. There is also a questionnaire survey that examines the viewpoints, knowledge and experience of contracting authorities with this method.

Page generated in 0.0414 seconds