• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Metodologia para eficientização do processo de elaboração e análise de projetos de linhas aéreas rurais de distribuição de energia elétrica

Ribeiro, Cássio Landim 29 September 2017 (has links)
Submitted by Luciana Ferreira (lucgeral@gmail.com) on 2017-10-13T13:21:48Z No. of bitstreams: 2 Dissertação - Cássio Landim Ribeiro - 2017.pdf: 3929731 bytes, checksum: 438916584696fc0815c232bacc624152 (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) / Approved for entry into archive by Luciana Ferreira (lucgeral@gmail.com) on 2017-10-13T13:22:21Z (GMT) No. of bitstreams: 2 Dissertação - Cássio Landim Ribeiro - 2017.pdf: 3929731 bytes, checksum: 438916584696fc0815c232bacc624152 (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) / Made available in DSpace on 2017-10-13T13:22:21Z (GMT). No. of bitstreams: 2 Dissertação - Cássio Landim Ribeiro - 2017.pdf: 3929731 bytes, checksum: 438916584696fc0815c232bacc624152 (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Previous issue date: 2017-09-29 / This paper presents a new methodology aimed at increasing efficiency in the dimensioning and approval stage of aerial rural electricity distribution lines projects. As a substitute for the sequential process currently employed, the approach proposed here is based on Simultaneous Engineering, where all the actors of the process have access to the computational tool, in a web platform, that allows implementing the methodology, enabling the multidisciplinary activity to be carried out in a parallel way. The estimates gathered indicate that the tool will allow the reduction of the time spent for the elaboration and approval of the projects, allowing: to reduce the total cost in man-hour spent by the electric utility; satisfy the customer's needs more quickly; optimize the mechanical dimensioning of distribution lines; and provide additional financial gain to the concessionaire due to the reduction of the average time to effectively start supplying electric power. / Neste trabalho, é apresentada uma nova metodologia dirigida ao aumento da eficiência nas etapas de dimensionamento e de aprovação de projetos de linhas rurais aéreas de distribuição de energia elétrica. Em substituição ao processo sequencial atualmente empregado, a abordagem proposta aqui é baseada em Engenharia Simultânea, onde todos os atores do processo têm acesso à ferramenta computacional, em plataforma web, que permite implementar a metodologia, possibilitando realizar a atividade multidisciplinar, em paralelo, de maneira mais ágil. As estimativas realizadas indicam que a ferramenta possibilitará a redução do tempo gasto para a elaboração e aprovação dos projetos, permitindo: reduzir o custo total em homem-hora despendido pela concessionária de energia elétrica; satisfazer a necessidade do cliente de maneira mais rápida; otimizar os dimensionamentos mecânicos das linhas de distribuição; e prover ganho financeiro adicional à concessionária devido à redução do tempo médio para efetivamente iniciar o fornecimento da energia elétrica.
2

Método computacional para elaboração de projetos eletromecânicos de redes de distribuição de energia elétrica com condutores de alumínio Nu

Carvalho, Denner Monteiro de 28 September 2017 (has links)
Submitted by Marlene Santos (marlene.bc.ufg@gmail.com) on 2017-11-17T16:18:59Z No. of bitstreams: 2 Dissertação - Denner Monteiro de Carvalho - 2017.pdf: 49512193 bytes, checksum: dce0c13146977219335b29250e4960d7 (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) / Approved for entry into archive by Luciana Ferreira (lucgeral@gmail.com) on 2017-11-20T10:11:34Z (GMT) No. of bitstreams: 2 Dissertação - Denner Monteiro de Carvalho - 2017.pdf: 49512193 bytes, checksum: dce0c13146977219335b29250e4960d7 (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) / Made available in DSpace on 2017-11-20T10:11:34Z (GMT). No. of bitstreams: 2 Dissertação - Denner Monteiro de Carvalho - 2017.pdf: 49512193 bytes, checksum: dce0c13146977219335b29250e4960d7 (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Previous issue date: 2017-09-28 / The present work presents the development of a computational tool for the optimization of processes in the elaboration of electromechanical projects of conventional electricity distribution networks. The current process of elaboration of distribution network projects that has significant topographical interferences is slow and depends on software with a technological lag that requires post processing of the data to generate the final project, besides demanding specific technical knowledge and too much elaboration time. This elaboration time, as well as the errors occurred in the post-processing stage, hinder the approval process of the projects in the electric power concessionaires, and delay the connection of final consumers. For modeling the process, the typologies of the terrain where the network path is to be determined through surveys of the topographic data are verified first. Afterwards, mechanical forces and stresses are observed in each type of electromechanical structure, defining the minimum mounting distances in compliance with related technical norms, as well as incident variables such as wind speed and mechanical variations of the conductors during the operation. The modeling of the decision variables is applied a recursive heuristic method with the application of the Hill Climbing optimization method, which sweeps the entire line defined by topography, performing the mechanical evaluations and calculations with the optimization of technical budget criteria, generating uniform solutions and Automated. The tool obtained is developed in Web platform with friendly interface and updated, and can be used through any browser. The software, besides providing the elaboration of the project with embedded normative criteria, can be easily used for project analysis, providing integrated visualization of the planialtimetric profiles through Google Maps, optimizing the process of visual evaluation. / O presente trabalho apresenta o desenvolvimento de um método computacional destinado à otimização de processos na elaboração de projetos eletromecânicos de redes de distribuição convencional de energia elétrica. O processo atual de elaboração de projetos de redes de distribuição que possui interferências topográficas é lento e depende de softwares com defasagem tecnológica que necessitam de pós processamento dos dados para gerar o projeto final, além de demandar conhecimento técnico específico e demasiado tempo de elaboração. Esse tempo de elaboração, bem como os erros ocorridos na etapa de pós processamento, dificultam o processo de aprovação dos projetos nas concessionárias de energia elétrica, e atrasam a ligação dos consumidores finais. Para modelagem do processo, são verificados primeiramente as tipologias do terreno onde se deseja definir o caminhamento da rede através de levantamentos dos dados topográficos. Após, são observados os esforços e solicitações mecânicas pontualmente em cada tipo de estrutura eletromecânica, definindo as distâncias mínimas de montagem em observância às normas técnicas relacionadas, e também, variáveis incidentes como a velocidade do vento e variações mecânicas dos condutores durante a operação. Realizada a modelagem das variáveis de decisão é aplicado um método heurístico recursivo com a aplicação do método de otimização Hill Climbing, que varre toda a linha definida pela topografia, realizando as avaliações e cálculos mecânicos com a otimização de critérios técnicos orçamentários, gerando soluções uniformizadas e automatizadas. O método computacional é desenvolvido em plataforma Web com interface amigável e atualizada, podendo ser utilizada através de um navegador qualquer. O software além de proporcionar a elaboração do projeto com critérios normativos embutidos, pode ser facilmente utilizada para análise de projetos, proporcionando visualização integrada dos perfis planialtimétricos através Google Maps, otimizando o processo de avaliação visual.

Page generated in 0.092 seconds