• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 262
  • 6
  • 2
  • Tagged with
  • 270
  • 270
  • 270
  • 202
  • 128
  • 108
  • 81
  • 79
  • 68
  • 54
  • 47
  • 47
  • 46
  • 42
  • 41
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
261

Práticas de produção enxuta no contexto da construção e manutenção de redes de distribuição de utilidades. / Lean production practices in the context of construction and maintenance of utility distribution networks.

Sergio Kempenich 21 October 2009 (has links)
Esta dissertação considera a atuação das empresas responsáveis pelas redes de distribuição de água, energia elétrica e gás natural denominadas Redes de Distribuição de Utilidades (RDUs) como sistemas produtivos, com o propósito de conhecer e avaliar a maneira como os esforços de melhoria da produtividade são conduzidos em busca de metas como maior qualidade, menor custo e menor prazo de entrega ao cliente. Este estudo é desenvolvido tomando-se como referência o modelo da produção enxuta, desenvolvido pela Toyota Motor Company do Japão, fundamentado no princípio de buscar o aumento da produtividade por meio da identificação e eliminação de desperdícios. Embora originalmente disseminada na cadeia da indústria automobilística, a adoção e adaptação da abordagem de melhoria de processos deste modelo têm sido consideradas em diferentes setores. Assim, o presente trabalho tem como motivação explorar as possibilidades de estender a aplicação de conceitos e práticas da produção enxuta em empresas de RDU. Primeiramente, a cadeia de valor das RDUs é analisada, e são escolhidos dois processos construção e manutenção para o desenvolvimento do estudo. Em seguida, é apresentada uma revisão bibliográfica, a partir da qual um conjunto de dezenove práticas enxutas possivelmente aplicáveis aos processos escolhidos é identificado. Por meio de três estudos de caso, analisa-se em que medida as empresas responsáveis pelas RDUs aplicam tais práticas enxutas em seus processos, e em que medida a aplicação atual ou uma possível aplicação futura de cada prática enxuta é motivada pelo pensamento enxuto. Com base nos dados levantados na pesquisa de campo, as práticas consideradas são avaliadas quanto ao potencial de efetiva aplicação em cada processo, levando-se em conta o objetivo de eliminação de desperdício. O estudo possibilitou verificar que todas as dezenove práticas são aplicáveis a pelo menos um dos processos considerados, sendo a maioria aplicável a ambos. / This dissertation considers the performance of the companies that are responsible for water, electricity and natural gas networks named Utility Distribution Networks (UDN) as productive systems, in order to understand and evaluate the way that the efforts for continuous productivity improvement of their processes are conducted in search of goals such as more quality, less cost and less lead time to customer. The model that is used as a reference for this study is the lean production model, which was developed by the Toyota Motor Company in Japan, founded on the principle of search for productivity increase by the elimination on waste. Although it was originally disseminated in the auto industry value chain, the process improvement approach from this model has been considered in different industries. Therefore, the present work is motivated by the chance to explore the possibility of extending the lean production application concepts and practices to UDN companies. Firstly, UDNs value stream is analyzed, and two processes are chosen construction and maintenance for the development of study. Then, a bibliographic review is presented, from which a set of nineteen lean practices that maybe possibly applicable on the chosen processes is identified. By the development of three case studies, an evaluation is performed with the objective to analyze to what extent the companies that are responsible for UDN apply those lean practices on their processes, and to what extent the current application or a possible future application of each lean practice is motivated by lean thinking. Based on the data from the field research, the potential for effective application of the considered practices is evaluated for each process, taking into consideration the objective of elimination of waste. The study made it possible to verify that all the nineteen practices are applicable at least on one of the considered processes, and the majority is applicable on both processes.
262

Análise crítica da rota tecnológica adotada no desenvolvimento de equipamento sinalizador de faltas para redes aéreas de distribuição de energia elétrica. / Critical analysis of the technological route adopted for development of faulted circuit indicator equipment for aerial power distribution network.

Fábio José de Andrade 20 April 2012 (has links)
Um equipamento sinalizador luminoso de faltas foi desenvolvido pela Companhia Paulista de Força e Luz (CPFL) em parceria com a Escola Politécnica da USP e a empresa Expertise Engenharia Ltda., através de uma série de projetos de pesquisa incluídos no programa de pesquisa e desenvolvimento (P&D) regido pela Agência Nacional de Energia Elétrica (ANEEL) brasileira. Neste trabalho é feita uma análise crítica da rota tecnológica adotada no desenvolvimento do sinalizador de faltas, apontando detalhes e justificativas das escolhas tecnológicas adotadas, além de novas possibilidades de melhoria do equipamento face aos avanços tecnológicos detectados nos últimos anos. Para tanto, é proposto e aplicado um novo método, associado a uma sistematização, para análise comparativa de tecnologias, que considera dados quantitativos, qualitativos e estratégicos diretamente comparáveis entre si. Ao longo do trabalho são analisados as escolhas dos princípios de detecção de faltas e funcionalidades agregadas, o desenvolvimento da eletrônica e dos circuitos integrados do detector de faltas, a fonte de alimentação, a sinalização luminosa e o gabinete do equipamento. Como resultado da linha de pesquisa do sinalizador luminoso de faltas foram obtidos protótipos de prova de conceito, cabeça-de-série e de lote pioneiro, estes últimos prontos e certificados para inserção no mercado. Obtiveram-se também diversas publicações em congressos nacionais, a geração de dois pedidos de patentes e um sistema computacional de alocação otimizada de sinalizadores de faltas em redes de distribuição aérea de energia elétrica. / Within the R&D program governed by the National Agency of Electric Energy of Brazil, a luminous faulted circuit indicator equipment (FCI) was developed by the Companhia Paulista de Força e Luz (CPFL) in partnership with the Escola Politécnica da USP and the company Expertise Engenharia Ltda. In this work it is presented a critical analysis of the technological route adopted for development of this new FCI, indicating details and justifications of technological choices adopted, and new detected possibilities for improvements, taken into account the technological advances in recent years. For such purpose, it is proposed a new method, associated to a practical systematization, for comparative analysis of technologies that accounts for quantitative, qualitative and strategic data directly comparable. The work presents analyses on the choices of fault detection principles and related functions, the development of integrated circuits and fault detector electronics, the power supply, the luminous signaling and the equipment case. As results of the research and development of the FCI there were obtained proof of concept, prototype and pilot equipments, the last ones certified and ready for sale. There were also obtained several publications in national conferences, submission of two patent applications and a software for optimization of FCIs allocation on overhead power distribution networks.
263

PLANEJAMENTO DE REDE DE DISTRIBUIÇÃO DE ENERGIA ELÉTRICA COM RESTRIÇÕES GEOGRÁFICAS E ELÉTRICAS / PLANNING NETWORK DISTRIBUTION OF ELECTRICITY RESTRICTIONS WITH GEOGRAPHICAL AND ELECTRICAL

RIBEIRO, Geraldo Valeriano 29 June 2009 (has links)
Made available in DSpace on 2014-07-29T15:08:20Z (GMT). No. of bitstreams: 1 dissertacao geraldo valeriano eec.pdf: 1215973 bytes, checksum: 4ceb98a1d5250ad33d16a8997882d277 (MD5) Previous issue date: 2009-06-29 / This work presents two methods to solve the problem of Electric Distribution Networks (EDN) with geographical and power restrictions. The high cost of the project involving EDN together with lack of efficient methods when working with real applications justifies the development of this research. Taking into account concepts of heuristic and metaheuristic two methods are proposed: The first is based on the Hill-Climbing (HC) heuristic and the second is based on the Simulated Annealing (SA) metaheuristic. The possible paths are provided by the Delaunay triangulation and it is considered the natural and socio-political obstacles of the site where you want to locate a new energy network. The dimension of the EDN feeders is calculated using the power flow results from the Forward-Backward method. The initial solution is found using an intelligent method. Then the SA metaheuristic and/or HC heuristic are used providing a good solution for a new EDN in comparison with the heuristic used to find the initial solution. A comparison is also made between the two proposed methods / RESUMO Neste trabalho são apresentados dois métodos para resolver o problema de planejamento de rede de distribuição de energia elétrica (RDEE) com restrições geográficas e elétricas. O custo elevado que envolve o projeto de RDEE unido à escassez de métodos eficientes quando se trata de aplicações reais justificam o desenvolvimento desta pesquisa. Considerando os conceitos de heurística e metaheurística são propostos dois métodos: o primeiro é baseado na heurística Hill-Climbing (HC) e o segundo é baseado na metaheurística Simulated Annealing (SA). Os possíveis caminhos são fornecidos pela triangulação de Delaunay e são considerados os obstáculos naturais e políticosociais (restrições geográficas) do local onde se deseja implantar a nova rede de energia elétrica. O dimensionamento dos alimentadores da RDEE é feito utilizando-se do fluxo de potência calculado pelo método Backward-Forward. A solução inicial é encontrada utilizando-se um método inteligente. A metaheurística SA e/ou a heurística HC são então utilizadas, fornecendo uma boa solução para uma nova RDEE, em relação à heurística utilizada para encontrar a solução inicial. Também é realizada uma comparação entre os dois métodos propostos.
264

Sistema inteligente baseado em decomposição por componentes ortogonais e inferência fuzzy para localização de faltas de alta impedância em sistemas de distribuição de energia elétrica com geração distribuída / Intelligent system based on orthogonal decomposition technique and fuzzy inference for high impedance location fault in distribution systems with distributed generation

Oureste Elias Batista 28 March 2016 (has links)
Os sistemas elétricos de potência modernos apresentam inúmeros desafios em sua operação. Nos sistemas de distribuição de energia elétrica, devido à grande ramificação, presença de extensos ramais monofásicos, à dinâmica das cargas e demais particularidades inerentes, a localização de faltas representa um dos maiores desafios. Das barreiras encontradas, a influência da impedância de falta é uma das maiores, afetando significativamente a aplicação dos métodos tradicionais na localização, visto que a magnitude das correntes de falta é similar à da corrente de carga. Neste sentido, esta tese objetivou desenvolver um sistema inteligente para localização de faltas de alta impedância, o qual foi embasado na aplicação da técnica de decomposição por componentes ortogonais no pré-processamento das variáveis e inferência fuzzy para interpretar as não-linearidades do Sistemas de Distribuição com presença de Geração Distribuída. Os dados para treinamento do sistema inteligente foram obtidos a partir de simulações computacionais de um alimentador real, considerando uma modelagem não-linear da falta de alta impedância. O sistema fuzzy resultante foi capaz de estimar as distâncias de falta com um erro absoluto médio inferior a 500 m e um erro absoluto máximo da ordem de 1,5 km, em um alimentador com cerca de 18 km de extensão. Tais resultados equivalem a um grau de exatidão, para a maior parte das ocorrências, dentro do intervalo de ±10%. / Modern electric power systems present numerous challenges in its operation. Fault location is a major challenge in Power Distribution Systems due to its large branching, presence of single-phase laterals and the dynamic loads. The influence of the fault impedance is one of the largest, significantly affecting the use of traditional methods for its location, since the magnitude of the fault currents is similar to the load current. In this sense, this thesis aimed to develop an intelligent system for location of high impedance faults, which was based on the application of the decomposition technique of orthogonal components in the pre-processing variables and fuzzy inference to interpret the nonlinearities of Power Distribution Systems with the presence of Distributed Generation. The data for training the intelligent system were obtained from computer simulations of an actual feeder, considering a non-linear modeling of the high impedance fault. The resulting fuzzy system was able to estimate distances to fault with an average absolute error of less than 500 m and a maximum absolute error of 1.5 km order, on a feeder about 18 km long. These results are equivalent to a degree of accuracy for the most occurrences within the ± 10% range.
265

Otimização em tempo real para o controle Volt/VAr em sistemas de distribuição de energia elétrica. / Real time optimization for Volt/VAr control in electric power distribution systems.

Juan Diego Echeverry Restrepo 30 June 2016 (has links)
Atualmente, as concessionárias de energia enfrentam vários desafios na tentativa de fornecer energia com qualidade e confiabilidade, por exemplo, redes de distribuição com pouco monitoramento e controle, envelhecimento dos ativos, atender a crescente demanda dos consumidores e satisfazer padrões de qualidade, entre outros. No Brasil, para atingir os índices de qualidade no fornecimento de energia estabelecidos pela Agência Nacional de Energia Elétrica (ANEEL), tem-se como alternativa aumentar a inteligência da rede com sistemas de tecnologia de informação (TI), além de utilizar Dispositivos Eletrônicos Inteligentes (IEDs), medidores inteligentes e sensores. Adicionalmente é necessário o emprego de uma infraestrutura de comunicação que forneça uma visibilidade abrangente das condições de carga e do estado do sistema de distribuição, permitindo fazer uso de técnicas de otimização e tomada de decisão para aumento da inteligência. O controle da tensão e o gerenciamento da potência reativa (Volt/VAr) são práticas de automação que podem ser empregadas nos sistemas de distribuição. Estas práticas ajudam a aumentar o benefício, a confiabilidade e a eficiência no fornecimento da qualidade do produto, minimizando os custos de operação e manutenção nas concessionárias. Na presente dissertação foi desenvolvida uma metodologia de controle Volt/VAr descentralizado (subestação), por meio da coordenação e controle dos transformadores com mudança de tap sob carga - LTC, dos bancos de capacitores localizados na subestação e ao longo dos alimentadores, bem como dos reguladores de tensão instalados ao longo dos alimentadores. Destaca-se a utilização da técnica de Estimação de Estados, a qual possibilita o uso da metodologia de controle Volt/VAr em tempo real. O algoritmo de otimização desenvolvido neste trabalho foi implementado através de simulações numa rede teste e numa rede real que permitem mostrar o potencial da formulação matemática desenvolvida. Os resultados da metodologia proposta comprovam a melhoria do perfil de tensão dos alimentadores da rede testada ao longo do dia, assim como uma diminuição das perdas técnicas, as quais chegaram a diminuir 7% em energia. Estes resultados foram alcançados sem ultrapassar a quantidade de operações definidas por dia nos diferentes dispositivos de controle. / Currently, power utilities face challenges in order to provide energy considering minimum requirements of power quality and reliability due to the absence of control and monitoring infrastructure, aging assets, growing demand, amongst others. In Brazil, the Agência Nacional de Energia Elétrica (ANEEL) establishes specific power quality and reliability indices. Power utilities should attend the limits for those indices by improving intelligence of network using IT systems, installing Intelligent Electric Devices (IEDs), smart meters and sensors, amongst others. Additionally, communication infrastructure is needed to provide the monitoring of load conditions and distribution system state. Optimization and decision-making tools are important for developing smart grids. Voltage control and reactive power management (Volt/VAr) are automation techniques that can be used in distribution systems. These practices lead to benefits for the utilities such as improvement of reliability and efficiency of the system, minimization of operation and maintenance costs, amongst others. In the present dissertation a methodology for decentralized control (Volt/VAr) was developed, through the coordination and control of load tap changers (LTCs) in power transformers and capacitors banks located at the substation, as well as capacitor banks and voltage regulators scattered throughout the feeders. State Estimation was utilized, which allows the application of the Volt/VAr Control methodology in real time environment. The optimization algorithm developed in this work was implemented through simulations in a test network and in a real network which validated the proposed methodology showing the potentiality of the mathematical model. The results of the proposed method showed voltage profile improvement over the day for the network tested as well as a 7% decrease in power energy losses. These results were achieved without exceeding the number of operations per day defined for all control devices.
266

Alocação de capacitores e ajuste de tapes para minimização de perdas em sistemas de distribuição de energia elétrica / Capacitor placement and LTC adjustment for loss minimization in electric power distribution systems

Casagrande, Cristiano Gomes 13 August 2010 (has links)
Submitted by Renata Lopes (renatasil82@gmail.com) on 2016-09-21T17:53:15Z No. of bitstreams: 1 cristianogomescasagrande.pdf: 637689 bytes, checksum: 8110c0aa199d98fa3f68855ccb257b82 (MD5) / Approved for entry into archive by Diamantino Mayra (mayra.diamantino@ufjf.edu.br) on 2016-09-26T20:27:35Z (GMT) No. of bitstreams: 1 cristianogomescasagrande.pdf: 637689 bytes, checksum: 8110c0aa199d98fa3f68855ccb257b82 (MD5) / Made available in DSpace on 2016-09-26T20:27:35Z (GMT). No. of bitstreams: 1 cristianogomescasagrande.pdf: 637689 bytes, checksum: 8110c0aa199d98fa3f68855ccb257b82 (MD5) Previous issue date: 2010-08-13 / A necessidade de redução do custo associado à operação dos sistemas de distribuição de energia elétrica tem se tornado cada vez mais imperativa no cenário do setor energético. Uma das principais alternativas para resolver este problema é a minimização de perdas de potência ativa nos alimentadores de distribuição. A fim de reduzir as perdas, algumas práticas têm sido adotadas, como a alocação de capacitores em pontos estratégicos do sistema, bem como o ajuste de tapes de transformadores e reconfiguração de redes de distribuição. A solução de problemas desse tipo envolve complexos algoritmos de otimização não linear inteira mista. Nesse contexto, este trabalho apresenta uma técnica especializada baseada na meta-heurística colônia de formigas para solucionar o problema de minimização de perdas nos sistemas de distribuição de energia elétrica através da alocação ótima de capacitores combinada ao ajuste de tapes, além de considerar restrições de violação de tensão. O algoritmo desenvolvido propõe modificações na estrutura básica do problema, a fim de obter resultados melhores. A metodologia proposta é aplicada a sistemas encontrados na literatura e resultados são comparados com outros métodos. / The reduce the cost associated with the operation of electric power distribution systems has become increasingly imperative in the setting of the energy sector. One of the main alternatives to solve this problem is to minimize power losses in distribution feeders. In order to reduce losses, some practices have been adopted, such as the allocation of capacitors at strategic points in the system as well as LTC adjustment and reconfiguration of distribution networks. The solution of such problems involves complex algorithms for nonlinear mixed integer optimization. Therefore, this paper presents a specialized technique based on meta-heuristic ant colony optimization to solve the problem of minimizing losses in electric power distribution systems through the optimal capacitor placement combined with the LTC adjustment, and consider constraints voltage violation. This algorithm proposes changes to the basic structure of the problem in order to obtain better results. The proposed methodology is applied to systems found in the literature and results are compared with other methods.
267

Comunicação digital em canais PLC: técnicas de transmissão, detecção e caracterização de canais PLC outdoor brasileiros

Picorone, Antonio Angelo Missiaggia 22 August 2014 (has links)
Submitted by Renata Lopes (renatasil82@gmail.com) on 2017-04-25T12:36:15Z No. of bitstreams: 1 antonioangelomissiaggiapicorone.pdf: 6590019 bytes, checksum: 115ef6e90742599945ac5e9c8c44cb2c (MD5) / Approved for entry into archive by Adriana Oliveira (adriana.oliveira@ufjf.edu.br) on 2017-04-25T15:26:22Z (GMT) No. of bitstreams: 1 antonioangelomissiaggiapicorone.pdf: 6590019 bytes, checksum: 115ef6e90742599945ac5e9c8c44cb2c (MD5) / Made available in DSpace on 2017-04-25T15:26:22Z (GMT). No. of bitstreams: 1 antonioangelomissiaggiapicorone.pdf: 6590019 bytes, checksum: 115ef6e90742599945ac5e9c8c44cb2c (MD5) Previous issue date: 2014-08-22 / Esta tese discute a medição e a caracterização das redes de distribuição de energia elétrica de baixa tensão (RDE-BT) e externa (outdoor) como meio de comunicação de dados para sistemas power line communication (PLC). São apresentados e discutidos diversos parâmetros obtidos a partir de uma campanha de medição realizada na RDE-BT de uma concessionária brasileira. Dentre os parâmetros analisados destacam-se o tempo de coerência, banda de coerência, espalhamento do atraso, comprimento da resposta ao impulso do canal e capacidade do canal, quando se considera as bandas de frequências de 1,7 a 30 MHz, 1,7 a 50 MHz e 1,7 a 100 MHz. As análises estatísticas evidenciam o potencial da rede de energia elétrica como meio de comunicação e discute os limites dessa potencialidade. Além disso, são propostos modelos de densidade espectral de potência dos ruídos, caracterização esparsa de canais PLC e proposto um modelo para geração de canais PLC variantes no tempo, cujo tempo de coerência entre as realizações dos canais é controlado. A estimação de canais PLC é apresentada como uma oportunidade de aplicação das técnicas de amostragem compressiva. Os resultados relacionados com as modelagens propostas constituem um ferramental de grande utilidade para projetar e analisar o desempenho de sistemas PLC. / This dissertation aims at discussing the measurement and characterization of outdoor electric power grid of low voltage as communication medium (power line communication - PLC). Statistical analyses carried out on several parameters such as average channel gain, coherence time, coherence bandwidth, delay spread, length of the channel impulse response, and channel capacity, when it is considered the frequency bands from 1.7 to 30 MHz, from 1.7 up to 50 MHz, and from 1.7 up to 100 MHz, are presented. These analyses reveal the circumstances in which outdoor and low-voltage electric power grids can be advantageous to support a reliable and efficient PLC system operation. Moreover, power spectral density models of additive noise and sparse representation of PLC channels are proposed. Also, a PLC time-varying channels model generator that makes use of coherence time is introduced. The proposed model generator, which is validated with measured PLC channels, is an effective tool to carry out performance analysis of PLC systems. Finally, PLC channel estimation is highlighted as an opportunity for the application of compressive sampling-based techniques. The use of traditional OFDM - based channel estimation techniques and the ones based on compressive sensing gives some directions for advancing channel estimation techniques for PLC channels.
268

Desenvolvimento de uma abordagem fuzzy para estimação de demanda de potência em um sistema de distribuição de energia elétrica / Development of a fuzzy approach for power demand forecast in an electrical energy distribution system

Lucas Assis de Moraes 01 August 2014 (has links)
Este trabalho tem por objetivo desenvolver uma abordagem fuzzy focando na estimação de curto prazo da demanda de potência ativa de um alimentador de sistema de distribuição de energia elétrica. A motivação para este trabalho encontra-se na redução do erro de estimação para que o sistema de distribuição como um todo seja corretamente operado. O destaque da abordagem desenvolvida é a metodologia de seleção de entradas para o sistema de estimação, que o treina fornecendo-lhe informações não redundantes e não desnecessárias sobre o comportamento da série temporal. Os resultados, obtidos com treinamento e teste de um sistema de inferência fuzzy multicamadas, mostram que as estimações realizadas selecionando as entradas do sistema de forma criteriosa apresentam menor erro que quando não há critério de seleção. Conclui-se então que a metodologia foi funcional e eficiente para o caso estudado, o que faz com que este trabalho resulte em válidas contribuições nas áreas de sistemas inteligentes, de sistemas dinâmicos e inclusive na forma metodológica de especificação de modelos de estimação de séries temporais. / This work aims to develop a fuzzy approach focusing on the short-term active power demand forecast in a feeder of an electrical energy distribution system. This work motivation lies on the reduction of the forecast error so that the whole distribution system can be correctly operated. The highlight of the developed approach is the methodology to select the inputs for the estimation system, which trains it giving to it non-redundant and non-unnecessary information about the time series behavior. The results, obtained by training and testing a multilayer fuzzy inference system, show that the estimations made by following a criterion to select the inputs have smaller error than when there is no selection criterion at all. It is therefore concluded that the methodology was functional and efficient for the case under study, what makes this work result in valid contributions for the fields of intelligent systems, dynamic systems and in the methodological way to specify models to estimate time series.
269

Estratégias de planejamento de Smart Grids: uma abordagem baseada em meta-heurísticas e simulação

SANTOS, Ederson Costa dos 15 May 2017 (has links)
Submitted by Hellen Luz (hellencrisluz@gmail.com) on 2017-10-16T17:46:02Z No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertacao_EstrategiasPlanejamentoSmart.pdf: 3494830 bytes, checksum: e201884feda341a4df9471c6c2e42d2a (MD5) / Approved for entry into archive by Edisangela Bastos (edisangela@ufpa.br) on 2017-11-14T16:15:10Z (GMT) No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertacao_EstrategiasPlanejamentoSmart.pdf: 3494830 bytes, checksum: e201884feda341a4df9471c6c2e42d2a (MD5) / Made available in DSpace on 2017-11-14T16:15:10Z (GMT). No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertacao_EstrategiasPlanejamentoSmart.pdf: 3494830 bytes, checksum: e201884feda341a4df9471c6c2e42d2a (MD5) Previous issue date: 2017-05-15 / Atualmente o Sistema Elétrico de Potência passa por grandes modificações, as quais concentram-se em diversos níveis e sub-níveis dos sub-sistemas de geração, transmissão e distribuição, todos concentrados a lógica de Smart Grids. Este conceito caracteriza-se pela inclusão das novas tecnologias digitais no sistema elétrico, com o intuito trazer segurança, velocidade, monitoramento, dentre outros muitos benefícios. Para pleno desenvolvimento das Smart Grids, muito ainda necessita ser feito em diversas áreas de pesquisa. Nesta linha, este trabalho apresenta simulações de um modelo de planejamento de Smart Grid, caracterizando-a a partir de protocolos, os quais são tendências para esse tipo de rede. Para isto, também foi analisado um método de otimização, que utiliza algoritmos inteligentes para otimização de dispositivo sem uma Smart Grid. A solução proposta se baseia na alocação otimizada de equipamentos em uma rede de comunicação, que utiliza como meio físico de transmissão de dados a própria fiação elétrica, tecnologia Power Line Communitation. Nesta rede são inseridas aplicações Smart Grid definidas através da International Eletrotechnical Commission (IEC) 61850. Assim, com esse modelo proposto, foram realizadas simulações no software de eventos discretos Network Simulator–3.Os resultados mostram uma diminuição significativa no quantitativo de equipamentos, mantendo os níveis de qualidade de serviço para as aplicações. / Currently, the Electric Power System undergoes major modifications, which focus on various levels and sub-levels of the generation, transmission and distribution subsystems, all of which are based on Smart Grids logic. This concept is characterized by the inclusion of new digital technologies in the electrical system, with the purpose of bringing security, speed, monitoring, among many other benefits. For the full development of Smart Grids, a lot still needs to be done in several areas of research. In this line, this work presents simulations of a Smart Grid planning model, characterizing it from protocols, which are trends for this type of network. For this, we also analyzed an optimization method, which uses intelligent algorithms to optimize devices in a Smart Grid. The proposed solution is based on the optimized allocation of equipment in acommunication network, which uses as its physical transmission medium its own electrical wiring, Power Line Communitation technology. In this network are inserted Smart Grid applications defined through IEC 61850. Thus, with this proposed model, simulations were performed in the Network Simulator-3 discrete event software. The results show a significant decrease in the quantity of equipment, maintaining the quality levels to the applications.
270

Tratamento de eventos em redes elétricas: uma ferramenta. / Treatment of events in electrical networks: a tool.

DUARTE, Alexandre Nóbrega. 15 August 2018 (has links)
Submitted by Johnny Rodrigues (johnnyrodrigues@ufcg.edu.br) on 2018-08-15T14:16:38Z No. of bitstreams: 1 ALEXANDRE NÓBREGA DUARTE - DISSERTAÇÃO PPGCC 2003..pdf: 1526817 bytes, checksum: dfc39cd8b1649bf64468cbe2eaefe99b (MD5) / Made available in DSpace on 2018-08-15T14:16:38Z (GMT). No. of bitstreams: 1 ALEXANDRE NÓBREGA DUARTE - DISSERTAÇÃO PPGCC 2003..pdf: 1526817 bytes, checksum: dfc39cd8b1649bf64468cbe2eaefe99b (MD5) Previous issue date: 2003-02-25 / Apresenta uma nova ferramenta para o diagnóstico automático de falhas em redes elétricas. A ferramenta utiliza uma técnica híbrida de correlação de eventos criada especialmente para ser utilizada em redes com constantes modificações de topologia. A técnica híbrida combina o raciocínio baseado em regras com o raciocínio baseado em modelos para eliminar as principais limitações do raciocínio baseado em regras. Com a ferramenta de diagnóstico foi possível validar o conhecimento dos especialistas em sistemas de transmissão de energia elétrica necessário para o diagnóstico de falhas em linhas de transmissão e construir uma base de regras para tal. A ferramenta foi testada no diagnóstico de falhas em linhas de transmissão de um dos cinco centros regionais da Companhia Hidro Elétrica do São Francisco (CHESF) e apresentou resultados satisfatórios de desempenho e precisão. / It presents a new tool for the automatic diagnosis of faults in electric networks. The toot uses a hybrid event correlation technique especially created to be used in networks with constant topological modifications. The hybrid technique combines ruJe-based reasoning with modelbased reasoning to eliminate the main limitations of rule-based reasoning. With the tool it was possible to validate the knowledge acquired from electric energy transmission systems specialists needed for the diagnosis of faults in transmission lines and to construct rules. The tool was tested in the diagnosis of faults in transmission lines of one of the five regional centers of the Companhia Hidro Elétrica do São Francisco (CHESF) and presented satisfactoiy results in terms of performance and precision.

Page generated in 0.1191 seconds