• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 5
  • Tagged with
  • 5
  • 5
  • 5
  • 5
  • 5
  • 4
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Localização de faltas em linhas de transmissão com múltiplas derivações utilizando dados de somente dois terminais. / Multiterminal transmission line fault location method using only two terminals data.

Di Santo, Silvio Giuseppe 15 January 2010 (has links)
Neste trabalho foi desenvolvido um método de localização de faltas em linhas de transmissão constituídas de circuito simples e continuamente transpostas com derivações. Este método utiliza fasores de tensão e corrente pré-falta e pós-falta medidos apenas nos terminais local e remoto, para determinar as informações da falta, as quais são: local, distância, resistência e tipo. O método de localização de faltas proposto neste trabalho é composto pelo processo de obtenção dos fasores, pelo algoritmo de determinação do tipo de falta, pelos algoritmos de estimativa de cargas e de localização de faltas, onde o algoritmo de localização de faltas foi proposto neste trabalho. A principal característica deste novo método é a de não haver necessidade de reduzir a linha para uma linha equivalente de dois terminais para aplicação do método de localização de faltas usando dados de um ou dois terminais para determinar o possível ou os possíveis locais de ocorrência da falta, uma vez que o algoritmo de localização de faltas proposto neste trabalho possui uma função objetivo que determina de forma direta o trecho de ocorrência da falta. Com o objetivo de avaliar a eficiência do método de localização de faltas proposto, este foi submetido a simulações de variação de distância de falta, de resistência de falta, de tipo de falta e simulações de erros nos fasores e nos parâmetros da linha de transmissão. / In this work was developed a fault location method on single circuit continuously transposed transmission lines with derivations. This method uses pre-fault and post-fault voltage and current phasors, measured at local and remote terminals only, to determine the information about the fault, which are: location, distance, resistance and type. The fault location method proposed in this work is composed by the phasor obtaining process, the fault type determination algorithm, the load estimation algorithm and the fault location algorithm, where the fault location algorithm has been proposed in this work. The main characteristic of this new method is no need to reduce the line to two terminals equivalent line to application of the one or two terminal fault location method which determine the possible fault location occurrence, since the fault location algorithm proposed in this work has an objective function that determines by direct way the exact path of fault occurrence. In order to evaluate the efficiency of the proposed fault location method, it was subjected to fault distance, fault resistance and fault type variation simulations and phasors and transmission lines parameters errors simulations.
2

Modelo regulatório do setor elétrico no Brasil e sua repercussão jurídica nos contratos de concessão de transmissão de energia elétrica. / Regulation model of electric sector in Brazil and its juridic repercussion on concession agreement of electric energy transmission.

García Hernández, Claudia Lorena 07 May 2010 (has links)
No presente trabalho se analisa a atividade de transmissão de energia elétrica em sua perspectiva econômica e jurídica, no contexto do modelo regulatório do setor de energia elétrica no Brasil, caracterizado atualmente pela sua desverticalização. A abordagem pretendida parte da configuração dos princípios que orientam a regulação do setor elétrico e, que posteriormente, se vislumbram na configuração das obrigações do contrato de concessão do serviçoo público de transmissão; o que permite avaliar o nível de consistência e maturidade do modelo regulatório. Para tanto, se estudaram as resoluções normativas onde se consagram os critérios que norteiam a regulação econômica, à que se atrela o contrato de concessão, o que por sua vez permite a preservação do equilíbrio econômico financeiro, assim como, a defesa dos interesses dos consumidores finais, mediante os incentivos à eficiência na gestão das concessionárias. Tendo como referência, o desenvolvimento da relação entre as empresas de transmissão e o órgão regulador, no caso a Agência Nacional de Energia Elétrica (ANEEL), no exercício das suas competências regulatórias e como defensor do interesse público, implícito no serviço público de energia elétrica. O que leva a concluir o grau de eficiência das decisões adotadas pelo órgão regulador, nas suas competências de gestão do controle e fiscalização, concretizados nos processos de revisões tarifárias. / Through this paper we analyze the economical and legal perspective of the electric energy transmission activity in the context of the Brazilian regulation for the electric energy industry, currently characterized by deverticalization. The aimed approach begins at the principle setting that leads the electric industry regulations and posteriorly is seen within the obligation setting of the transmission public utility concession agreement; what makes possible to evaluate the level of consistency and maturity of this type of regulation. For that, we have studied the norms that apply the criteria guiding the economical regulation, being the concession agreement intrinsically related to that, what in turn allows to maintain the financial and economical balance, as well as final consumer interest, based on the incentives for the efficiency of the grantee management. We have used as reference the development of the relationship between the transmission companies and the regulating Brazilian Agency of Electric Energy (ANEEL) in the exercise of its regulatory capacity and as a protector of the public interest implied in the public utility of electric energy. Our conclusion is the level of efficiency of the decisions adopted by the regulatory agency in order to manage control and inspection, materialized in the tariff revision process.
3

Modelo regulatório do setor elétrico no Brasil e sua repercussão jurídica nos contratos de concessão de transmissão de energia elétrica. / Regulation model of electric sector in Brazil and its juridic repercussion on concession agreement of electric energy transmission.

Claudia Lorena García Hernández 07 May 2010 (has links)
No presente trabalho se analisa a atividade de transmissão de energia elétrica em sua perspectiva econômica e jurídica, no contexto do modelo regulatório do setor de energia elétrica no Brasil, caracterizado atualmente pela sua desverticalização. A abordagem pretendida parte da configuração dos princípios que orientam a regulação do setor elétrico e, que posteriormente, se vislumbram na configuração das obrigações do contrato de concessão do serviçoo público de transmissão; o que permite avaliar o nível de consistência e maturidade do modelo regulatório. Para tanto, se estudaram as resoluções normativas onde se consagram os critérios que norteiam a regulação econômica, à que se atrela o contrato de concessão, o que por sua vez permite a preservação do equilíbrio econômico financeiro, assim como, a defesa dos interesses dos consumidores finais, mediante os incentivos à eficiência na gestão das concessionárias. Tendo como referência, o desenvolvimento da relação entre as empresas de transmissão e o órgão regulador, no caso a Agência Nacional de Energia Elétrica (ANEEL), no exercício das suas competências regulatórias e como defensor do interesse público, implícito no serviço público de energia elétrica. O que leva a concluir o grau de eficiência das decisões adotadas pelo órgão regulador, nas suas competências de gestão do controle e fiscalização, concretizados nos processos de revisões tarifárias. / Through this paper we analyze the economical and legal perspective of the electric energy transmission activity in the context of the Brazilian regulation for the electric energy industry, currently characterized by deverticalization. The aimed approach begins at the principle setting that leads the electric industry regulations and posteriorly is seen within the obligation setting of the transmission public utility concession agreement; what makes possible to evaluate the level of consistency and maturity of this type of regulation. For that, we have studied the norms that apply the criteria guiding the economical regulation, being the concession agreement intrinsically related to that, what in turn allows to maintain the financial and economical balance, as well as final consumer interest, based on the incentives for the efficiency of the grantee management. We have used as reference the development of the relationship between the transmission companies and the regulating Brazilian Agency of Electric Energy (ANEEL) in the exercise of its regulatory capacity and as a protector of the public interest implied in the public utility of electric energy. Our conclusion is the level of efficiency of the decisions adopted by the regulatory agency in order to manage control and inspection, materialized in the tariff revision process.
4

Localização de faltas em linhas de transmissão com múltiplas derivações utilizando dados de somente dois terminais. / Multiterminal transmission line fault location method using only two terminals data.

Silvio Giuseppe Di Santo 15 January 2010 (has links)
Neste trabalho foi desenvolvido um método de localização de faltas em linhas de transmissão constituídas de circuito simples e continuamente transpostas com derivações. Este método utiliza fasores de tensão e corrente pré-falta e pós-falta medidos apenas nos terminais local e remoto, para determinar as informações da falta, as quais são: local, distância, resistência e tipo. O método de localização de faltas proposto neste trabalho é composto pelo processo de obtenção dos fasores, pelo algoritmo de determinação do tipo de falta, pelos algoritmos de estimativa de cargas e de localização de faltas, onde o algoritmo de localização de faltas foi proposto neste trabalho. A principal característica deste novo método é a de não haver necessidade de reduzir a linha para uma linha equivalente de dois terminais para aplicação do método de localização de faltas usando dados de um ou dois terminais para determinar o possível ou os possíveis locais de ocorrência da falta, uma vez que o algoritmo de localização de faltas proposto neste trabalho possui uma função objetivo que determina de forma direta o trecho de ocorrência da falta. Com o objetivo de avaliar a eficiência do método de localização de faltas proposto, este foi submetido a simulações de variação de distância de falta, de resistência de falta, de tipo de falta e simulações de erros nos fasores e nos parâmetros da linha de transmissão. / In this work was developed a fault location method on single circuit continuously transposed transmission lines with derivations. This method uses pre-fault and post-fault voltage and current phasors, measured at local and remote terminals only, to determine the information about the fault, which are: location, distance, resistance and type. The fault location method proposed in this work is composed by the phasor obtaining process, the fault type determination algorithm, the load estimation algorithm and the fault location algorithm, where the fault location algorithm has been proposed in this work. The main characteristic of this new method is no need to reduce the line to two terminals equivalent line to application of the one or two terminal fault location method which determine the possible fault location occurrence, since the fault location algorithm proposed in this work has an objective function that determines by direct way the exact path of fault occurrence. In order to evaluate the efficiency of the proposed fault location method, it was subjected to fault distance, fault resistance and fault type variation simulations and phasors and transmission lines parameters errors simulations.
5

METODOLOGIA PARA GERENCIAMENTO DE RISCOS EM PROJETOS DE TRANSMISSÃO DE ENERGIA ELÉTRICA COM FOCO NO PRAZO DE CONCLUSÃO APLICANDO O GERENCIAMENTO DE PROJETOS PELA CORRENTE CRÍTICA E SIMULAÇÃO DE MONTE CARLO / METHODOLOGY FOR RISK MANAGEMENT OF ELECTRIC ENERGY TRANSMISSION PROJECTS WITH FOCUS ON THE TIME FOR COMPLETION ADOPTING THE CRITICAL CHAIN AND MONTE CARLO SIMULATION FOR PROJECT MANAGEMENT

Pimentel, Jacinto Maia 18 October 2016 (has links)
Submitted by admin tede (tede@pucgoias.edu.br) on 2017-06-01T13:24:39Z No. of bitstreams: 1 JACINTO MAIA PIMENTEL.pdf: 3146885 bytes, checksum: d73d15b75ba44e1ab5fa45ebd06988f1 (MD5) / Made available in DSpace on 2017-06-01T13:24:39Z (GMT). No. of bitstreams: 1 JACINTO MAIA PIMENTEL.pdf: 3146885 bytes, checksum: d73d15b75ba44e1ab5fa45ebd06988f1 (MD5) Previous issue date: 2016-10-18 / The construction of electricity generation projects are held in places where there are specific conditions for its implementation, and it appears that these are not always close to the consumer markets. The energy needs to be transported to the consumption centers located many kilometers away, and to this end are used to power transmission lines. These developments are characterized by many different situations that impact on their time of completion. In order to pursue project management options so that deadlines are met, this research applies a risk management methodology for projects by means of the quantitative risk assessment. It is addressed to the energy transmission area with a focus on the project deadline. The proposed model adopts the Critical Chain Project Management – CCPM, whereby the appropriate activities duration are those achievable in the shortest time as possible. The use of CCPM calls for the application of buffers along the project schedule to control the uncertainties. The proposed methodology applies the Monte Carlo Simulation – MCS to the schedule, associating the Minimum, Most likely and Maximum times to the activities. The identified risks are related to these activities. The outcome resulting from the proposed methodology is quantitative and provides useful information to containment and contingency actions. / A construção dos empreendimentos de geração de energia elétrica é realizada nos locais onde existem condições específicas para sua implantação, e, nem sempre estes são próximos aos centros consumidores. A energia gerada necessita ser transportada para os centros de consumo localizados a muitos quilômetros de distância, e, para tal são utilizadas as Linhas de Transmissão de Energia. Estes empreendimentos caracterizam-se por encontrar situações diversas e que impactam no seu prazo de conclusão. Com o objetivo de buscar opções de gerenciamento de projetos para que os prazos sejam alcançados, esta pesquisa aplica uma metodologia para gestão dos riscos em projetos, com a aplicação de análise quantitativa dos riscos. Será aplicada na área de transmissão de energia com foco no prazo de conclusão. O modelo proposto utiliza o método do Gerenciamento de Projeto pela Corrente Crítica – CCPM, por meio do qual as durações das atividades consideradas são aquelas exequíveis no menor prazo possível. O uso da CCPM prevê a introdução de buffers no cronograma do projeto para controlar as incertezas. A metodologia proposta aplica ao cronograma a Simulação de Monte Carlo- SMC, associando às suas atividades o prazo Mínimo, Mais Provável e Máximo. Os riscos identificados são associados às atividades. O resultado da aplicação da metodologia proposta é uma análise dos riscos do projeto indicando a probabilidade de consumo dos buffers, as atividades que mais impactam no seu consumo e os riscos associados a estas. O resultado desta análise é quantitativa e gera informações úteis para ações de contenção e contingência.

Page generated in 0.1364 seconds