• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 37
  • 4
  • Tagged with
  • 41
  • 41
  • 25
  • 13
  • 12
  • 10
  • 9
  • 9
  • 8
  • 8
  • 8
  • 7
  • 7
  • 7
  • 7
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Análise de confiabilidade de sistemas eletrônicos complexos baseada em ensaios acelerados de vida. / Reliability analysis of complex electronic systems based on accelerated life tests.

Érico Pessoa Felix 15 January 2007 (has links)
O objetivo deste estudo é desenvolver um método para avaliar a confiabilidade de sistemas eletrônicos complexos. A análise proposta baseia-se na aplicação de ensaios de confiabilidade e de normas técnicas, bem como modelos matemáticos para estimação da vida operacional. Os ensaios de confiabilidade executados nesse estudo simulam condições operacionais mais severas que as usualmente enfrentadas pelo sistema, a fim de reduzir o tempo de execução dos ensaios. Ao longo destes, foram coletados os tempos até a falha de diversas amostras do sistema, os quais são submetidas a diferentes condições de operação. O planejamento das variáveis que aceleram os principais modos de falha de componentes eletrônicos e os perfis de solicitação empregados também são discutidos, sendo consideradas as mais importantes a temperatura e a umidade. Através da aplicação de modelos matemáticos para predição da vida nas condições normais de operação, dadas as ocorrências de falhas nas condições aceleradas, a confiabilidade e o tempo médio até a falha são determinados para a central telefônica estudada, tomada como exemplo na aplicação do método. Adicionalmente aos ensaios são desenvolvidas estimativas da confiabilidade da central telefônica através da norma militar US MIL-HDBK-217 F (1991). Os resultados destas estimativas são utilizados para comparação e confirmação dos resultados obtidos através dos ensaios. Destaca-se que os métodos descritos neste texto não são restritos a aplicação em centrais telefônicas analógicas, mas podem ser empregados a uma grande família de equipamentos eletrônicos de complexidade tecnológica semelhante. / This research aims to develop a method to evaluate the reliability of complex electronic systems. The analysis proposed is based on application of reliability laboratory tests, technical standards and mathematical models to estimate the system operational life. Reliability tests proposed simulate harder operational conditions than those usually faced by the system, aiming to reduce the time of execution. During the tests, time to failure of several samples are collected. Those samples are submitted to different environmental conditions. Selection of variables that accelerate the main failure modes of electronic components and the load profiles used are also analyzed, considering humidity and temperature the most important variables for failure acceleration. The proposed model is used to estimate the reliability and the mean time to failure of an analog PABX, those values being generated by the application of mathematical models for life prediction in the usage operation condition, given the accelerated reliability estimate. Additionally to the tests, a reliability estimation of the PABX central is done using US MIL-HDBK-217 F (1991). Results are used to compare and to validate the reliability value evaluated through the accelerated tests. It is important to emphasize that the application of the methods described in this present text is not restricted to analog PABX systems, being applied to a wide range of electronic equipments with similar technological complexity.
12

Estudo da corrosão do aço, induzida por carbonatação, em concretos com adições minerais

Vaghetti, Marcos Alberto Oss January 2005 (has links)
As pesquisas com o concreto buscam cada vez mais alternativas para melhorá-lo em desempenho, não apenas nas resistências mecânicas, mas também e principalmente quanto à sua durabilidade. Para isso, a utilização das adições minerais nos concretos, principalmente a partir da década de 80, no Brasil, passaram a fazer parte dos experimentos, em função dos benefícios que trazem para minimizar os problemas patológicos de deterioração do material. No entanto, estudos em concretos com essas adições precisam ser melhor investigados, especialmente na proteção da armadura contra a corrosão. Em vista disso, o presente trabalho teve como objetivo principal avaliar o desempenho dos concretos com e sem adições minerais frente à corrosão do aço induzida por carbonatação acelerada. Foram pesquisados, nas relações água/aglomerante (a/ag) nominais de 0,50, 0,60 e 0,70, cinco tipos de concreto, sendo quatro com adições minerais (substituição em massa): cinza volante 25% e 50%, cinza de casca de arroz 25% e escória granulada de alto-forno 70% e um sem adição: 100% cimento CPV-ARI, tomado como referência. Os concretos foram curados por 49 dias em câmara úmida e, em seguida, passaram por um processo de précondicionamento para equilíbrio de umidade interna até completarem 91 dias, segundo recomendações da RILEM-TC116/1999. O processo da corrosão foi induzido por carbonatação (10% de CO2 em volume) e acelerado por ciclos de molhagem/secagem, sendo avaliado através das técnicas eletroquímicas do potencial de corrosão e resistência de polarização bem como do ensaio de perda de massa gravimétrica. Também foram realizados os ensaios complementares de resistência à compressão axial, permeabilidade a gases, absorção capilar d’água, profundidade de carbonatação e pH. Os resultados mostraram que os concretos feitos com adições minerais, principalmente aqueles com altos teores (cinza volante/50% e escória/70%), apresentaram menor proteção para o aço contra a corrosão, quando comparados com o concreto de referência, feito somente com cimento. Portanto, no contexto das presentes condições experimentais, concluiu-se que os concretos com os tipos e teores de adições minerais estudados, para resistências à compressão ≤ 40 MPa e relações a/ag ≥ 0,50, não apresentaram desempenhos adequados no tocante à corrosão do aço induzida por carbonatação, necessitando, no entanto, de mais experimentos que comprovem tal comportamento para concretos em estruturas reais.
13

Método de uso de simuladores de tráfego linear móvel de pista para a determinação de comportamento e previsão de desempenho de pavimentos asfálticos. / Mobile linear traffic simulator method to forecast behavior and performance of asphalt pavements.

Vale, André Felipe 27 March 2008 (has links)
Os ensaios acelerados de pavimentos em escala real consistem na aplicação controlada de uma carga de roda igual ou acima da carga máxima legal permitida, em uma estrutura de pavimento, seja este um pavimento-teste ou uma via existente, para se determinar a resposta do sistema e o seu desempenho sob condições controladas e aceleradas de acúmulo de danos num espaço limitado de tempo (METCALF, 1996). Esses ensaios podem ser realizados hoje, tanto por simuladores instalados em campos de prova destinados a este único fim, quanto por simuladores móveis, cuja composição é rebocável ou autopropelida e pode ser posicionada no local a ser pesquisado, o que se mostra especialmente vantajoso no estudo de materiais e técnicas de restauração de pavimentos por preservar as condições de contorno. Apresentam-se os resultados dos primeiros testes acelerados em pavimentos com simulador de tráfego linear móvel no Brasil e suas contribuições para o desenvolvimento das técnicas, processos de projeto e planejamento rodoviários. Apresenta-se também uma síntese dos ensaios acelerados de pavimentos em escala real com simuladores de tráfego lineares móveis, com o objetivo de mostrar o estágio atual do conhecimento nessa área, a partir de uma revisão bibliográfica e associando esses conhecimentos a casos práticos. Como contribuição para futuros trabalhos, com base na análise das pesquisas já finalizadas e dos resultados já obtidos, foi elaborada uma proposta de método para a realização de simulação em pista e de ensaios a serem conduzidos antes, durante e após o término da simulação, dependendo do objetivo específico dos ensaios acelerados. / Full-scale accelerated pavement testing is defined as the controlled application of a wheel load in a pavement structure to determine the pavement system response and its performance under accelerated conditions of accumulated damage in a compressed time period (METCALF, 1996). Loads at or above the legal maximum allowed by highway agencies can be applied at test tracks, using simulators designed solely for this purpose, or at existent roads using mobile simulators positioned right at the road pavement structure. This layout provides an interesting advantage in the study of materials and pavement rehabilitation techniques by preserving field conditions, specially structural and environmental characteristics. This research describes the results from the first accelerated pavement tests with mobile linear traffic simulator in Brazil and their contribution for the development of design procedures, distress monitoring methods, and road planning. As part of this research, a wide literature review was done associated with practical case studies, the current stage of knowledge in this area, and a real scale synthesis of accelerated pavement experiments with linear mobile traffic simulators. This research proposes a simulation method for testing pavement sections and the evaluation tests to be performed according to the objective of the accelerated pavement test study. This research is a contribution to the state of practice of this type of accelerated pavement testing in Brazil and outlines the path for future applications of this technology in the country.
14

Contribuição ao estudo da carbonatação do concreto com adição de sílica ativa em ambiente natural e acelerado

Possan, Edna January 2004 (has links)
Devido à preocupação com a durabilidade das estruturas de concreto armado surgiram novas linhas de pesquisa destacando-se, dentre elas, a previsão de vida útil. Estes estudos deram origem a diversos modelos que tentam estabelecer o comportamento do concreto quando exposto a ambientes agressivos durante um determinado período. Existem várias maneiras de se modelar este comportamento: com base em resultados obtidos em experiências anteriores; a partir de ensaios de degradação acelerados; por métodos determinísticos e probabilísticos ou estocásticos. A estimativa de vida útil das estruturas de concreto empregando dados de ensaios acelerados é recomendada pela ASTM E-632 (1996) desde que estes sejam correlacionados com resultados de ensaios não acelerados ou naturais. A correlação entre estes ensaios possibilita a determinação dos coeficientes de aceleração, os quais expressam o número de vezes em que o ensaio acelerado representa o fenômeno de degradação natural. Dentro deste contexto o presente trabalho avalia a carbonatação do concreto com e sem adição de sílica ativa exposto a degradação natural e acelerada, verificando também a influência do teor desta adição e da relação água/aglomerante na carbonatação. Em paralelo foram determinados os coeficientes de carbonatação (kc) e de aceleração (αa). Os concretos estudados possuem relação água/aglomerante de 0,30; 0,35; 0,45; 0,60 e 0,80 e teor de adição de 0; 5; 10; 15e 20%. A carbonatação natural das amostras foi avaliada após 7 anos de exposição ao CO2, tendo como ambiente de degradação a cidade de Porto Alegre, RS. Os dados de carbonatação acelerada foram obtidos aos 7, 28, 63 e 98 dias de exposição ao CO2 com concentração de 5%, temperatura de 25°C e umidade relativa (UR) de 70%. Para o ensaio acelerado, baseado em análise estatística por meio de regressão múltipla não-linear, os resultados apontaram que a adição de sílica ativa em dosagens com relação água/aglomerante elevada aumenta a profundidade de carbonatação do concreto. Para a relação água/aglomerante de 0,80 com 0 e 20% de adição de sílica ativa, os coeficientes de aceleração obtidos foram de 31,15 e 35,49, respectivamente. / New researches has been appeared with the concern of reinforced concrete structures durability, standing out the service life prediction. These studies creates some models that establish the concrete performance when exposed to an aggressive environment. There are several ways to modeling this performance: with results obtained in previous tests; with accelerated degradation tests; or deterministic and stochastic methods. The concrete structures service life prediction using short term test data are recommended by ASTM E-632 (1996) since these are correlated with long term test results. The correlation among these tests makes possible the acceleration coefficient determination, which express how the accelerated tests represents the natural degradation phenomenon. In this sense, this work evaluate the concrete carbonation with and without silica fume exposed to natural and accelerated test, verifying the influence of silica fume tenor in this material and water – binder ratio in the carbonation. In addition to this, were determined the carbonation (kc) and acceleration coefficients (αa). The concretes studied has a 0,30; 0,35; 0,45; 0,60 and 0,80 water-binder ratio and 0; 5; 10; 15 and 20% addition tenor. The samples natural carbonation was analyzed after 7 years of CO2 exhibition from Porto Alegre city environment degradation. The accelerated carbonation data were obtained in 7, 28, 63 and 98 days of CO2 exhibition with 5% concentration, temperature of 20°C and humidity of 60%. In accelerated tests, based on statistical analysis through nonlinear estimation multiple regression, the results showed that the silica fume addition in high water-binder ratio mixtures increases the concrete carbonation depth. For water-binder ratio 0,80 with silica fume addition of 0 and 20%, the acceleration coefficients obtained were 31,15 and 35,49, respectively.
15

Contribuição ao estudo da carbonatação do concreto com adição de sílica ativa em ambiente natural e acelerado

Possan, Edna January 2004 (has links)
Devido à preocupação com a durabilidade das estruturas de concreto armado surgiram novas linhas de pesquisa destacando-se, dentre elas, a previsão de vida útil. Estes estudos deram origem a diversos modelos que tentam estabelecer o comportamento do concreto quando exposto a ambientes agressivos durante um determinado período. Existem várias maneiras de se modelar este comportamento: com base em resultados obtidos em experiências anteriores; a partir de ensaios de degradação acelerados; por métodos determinísticos e probabilísticos ou estocásticos. A estimativa de vida útil das estruturas de concreto empregando dados de ensaios acelerados é recomendada pela ASTM E-632 (1996) desde que estes sejam correlacionados com resultados de ensaios não acelerados ou naturais. A correlação entre estes ensaios possibilita a determinação dos coeficientes de aceleração, os quais expressam o número de vezes em que o ensaio acelerado representa o fenômeno de degradação natural. Dentro deste contexto o presente trabalho avalia a carbonatação do concreto com e sem adição de sílica ativa exposto a degradação natural e acelerada, verificando também a influência do teor desta adição e da relação água/aglomerante na carbonatação. Em paralelo foram determinados os coeficientes de carbonatação (kc) e de aceleração (αa). Os concretos estudados possuem relação água/aglomerante de 0,30; 0,35; 0,45; 0,60 e 0,80 e teor de adição de 0; 5; 10; 15e 20%. A carbonatação natural das amostras foi avaliada após 7 anos de exposição ao CO2, tendo como ambiente de degradação a cidade de Porto Alegre, RS. Os dados de carbonatação acelerada foram obtidos aos 7, 28, 63 e 98 dias de exposição ao CO2 com concentração de 5%, temperatura de 25°C e umidade relativa (UR) de 70%. Para o ensaio acelerado, baseado em análise estatística por meio de regressão múltipla não-linear, os resultados apontaram que a adição de sílica ativa em dosagens com relação água/aglomerante elevada aumenta a profundidade de carbonatação do concreto. Para a relação água/aglomerante de 0,80 com 0 e 20% de adição de sílica ativa, os coeficientes de aceleração obtidos foram de 31,15 e 35,49, respectivamente. / New researches has been appeared with the concern of reinforced concrete structures durability, standing out the service life prediction. These studies creates some models that establish the concrete performance when exposed to an aggressive environment. There are several ways to modeling this performance: with results obtained in previous tests; with accelerated degradation tests; or deterministic and stochastic methods. The concrete structures service life prediction using short term test data are recommended by ASTM E-632 (1996) since these are correlated with long term test results. The correlation among these tests makes possible the acceleration coefficient determination, which express how the accelerated tests represents the natural degradation phenomenon. In this sense, this work evaluate the concrete carbonation with and without silica fume exposed to natural and accelerated test, verifying the influence of silica fume tenor in this material and water – binder ratio in the carbonation. In addition to this, were determined the carbonation (kc) and acceleration coefficients (αa). The concretes studied has a 0,30; 0,35; 0,45; 0,60 and 0,80 water-binder ratio and 0; 5; 10; 15 and 20% addition tenor. The samples natural carbonation was analyzed after 7 years of CO2 exhibition from Porto Alegre city environment degradation. The accelerated carbonation data were obtained in 7, 28, 63 and 98 days of CO2 exhibition with 5% concentration, temperature of 20°C and humidity of 60%. In accelerated tests, based on statistical analysis through nonlinear estimation multiple regression, the results showed that the silica fume addition in high water-binder ratio mixtures increases the concrete carbonation depth. For water-binder ratio 0,80 with silica fume addition of 0 and 20%, the acceleration coefficients obtained were 31,15 and 35,49, respectively.
16

Estudo do processo de cromatização de arames galvanizados e propostas de alternativas para retardamento da ocorrência prematura de oxidação branca

Rosa, Rogério Laydner da January 2009 (has links)
Este trabalho apresenta um estudo do processo de cromatização de arames galvanizados da Linha de Galvanização 2 da Gerdau Riograndense através do entendimento das variáveis de processo que podem ser alteradas com o intuito de proporcionar uma resistência à oxidação branca maior do que a fornecida com os parâmetros de processo utilizados atualmente. Amostras de arames foram coletadas diretamente da linha de galvanização e submetidas a ensaios acelerados de corrosão em câmaras de umidade saturada (NBR 8095 e ISO 6270-2)16 e de névoa salina (NBR 8094 e ASTM B 117)15. Com base nos resultados obtidos destes ensaios são propostas alterações nas variáveis de processo, como por exemplo, tempo de imersão no tanque de cromatizante, avaliando o aumento ou não do poder protetivo. Os resultados obtidos até agora mostraram que as configurações operacionais da Linha de Galvanização 2 não oferecem uma condição para a formação de uma camada protetora eficiente. Espera-se com este trabalho justificar junto à Empresa a necessidade de alteração de parâmetros de processo para que se consiga obter significativo aumento no poder protetivo conferido pelo cromatizante ao arame galvanizado, e assim, ter condições de disponibilizar ao mercado um produto com qualidade superior no que tange a resistência à oxidação branca. / This work presents a study about the chromatization process for galvanized steel wires in the Galvanizing Line 2 of the Gerdau Riograndense through the understanding of variables of the process that can be modified to provide a superior white corrosion resistance than the one which is provided actually. Samples of wires were collected directly from the galvanizing line and submitted to accelerated corrosion tests in the saturated humidity chamber (NBR 8095 and ISO 6270-2)16 and the salt spray chamber (NBR 8094 and ASTM B 117)15. Based in the results from this tests changes in the process variables are proposed like immersion time in the chromatizating bath to evaluate the increase or decrease of the protective action. The results obtained so far showed that the operational configurations of the Galvanizing Line 2 do not offer a good condition to create an efficient protective layer on the wire. The expectation of this work is to justify to the company that changes in the parameters process are necessaries to get a significant increasing of the protective chromatizating action on the galvanized wire and this way to have conditions to offer to costumers a product with superior quality about white corrosion resistance.
17

Avaliação de desempenho de recapeamentos asfálticos com camada intemediária de geotêxtil submetidos à solicitação por simulador de tráfego / Performance evaluation of asphalt overlays containing intermediate layer of geotextile submitted to traffic simulator

Fiorin, Marcelo Menezes January 2009 (has links)
Esta dissertação apresenta os resultados e análises do monitoramento de um recapeamento asfáltico executado com camada intermediária de geotêxtil. A pista experimental vem sendo solicitada desde 1999, em uma pesquisa que se encontra na sua terceira fase, atingindo 1.103.885 ciclos de carga de 100 kN aplicados. Nessa última fase de estudo o tráfego foi aplicado entre Setembro de 2008 e Fevereiro de 2009, totalizando 121.685 ciclos de carga de eixo de 100 kN. A pista foi dividida em três regiões, sendo empregado em duas delas geotêxteis impregnados com asfalto. Durante o período de estudo foram monitorados parâmetros de resposta estrutural, através de medidas de deflexões e bacias defletométricas, parâmetros de comportamento, através de medidas de deformações permanentes e mapeamento de trincas, e por fim parâmetros ambientais, através das medidas de temperatura do ar e precipitações. Foram também aplicados modelos de previsão de desempenho para o caso de reflexões de trincas. O monitoramento do trincamento na pista mostrou que as regiões com geotêxtil tiveram melhor desempenho quando comparadas à região sem camada intermediária. O comprimento de trincas no final do estudo foi de 764 cm na região sem camada intermediária, 328 cm na região com geotêxtil G150 e 554 cm na região com geotêxtil G150 TF. Foram extraídos corpos de prova da pista, sobre algumas trincas, de modo a se visualizar o modo de desenvolvimento do trincamento, e também para buscar se identificar onde ocorreu trincamento por reflexão. Não foi possível extrair CPs de todas as trincas face a proximidade das mesmas e das dimensões da sonda rotativa, porém do material retirado observou-se ocorrência de trincamento por reflexão, trincamento por fadiga e também trincamento conhecido como top-down cracking (TDC). Os resultados evidenciam que a inclusão de geotêxteis como camada de absorção de tensões aumenta significativamente a vida de recapeamentos asfálticos executados sobre pavimentos trincados. / This dissertation presents the results of the monitoring and analysis of an overlay executed with intermediate geotextile layer. The experimental track has been requested since 1999, in a research that is in its third phase, reaching 1.103.885 cycles of 100 kN axle load applied. In this last phase of the study, the traffic was applied between September 2008 and February 2009, totaling 121.685 cycles of 100 kN axle load. The track is divided into three regions, two of them uses geotextiles impregnated with asphalt. During the study period were monitored parameters of structural response, by means of deflections and basins, parameters of behavior, by means of permanent deformation and mapping of cracks, and finally environmental parameters, through the measures of air temperature and rainfall. Models were also applied to predict the performance of the overlay. The monitoring of cracking showed that regions with geotextile had improved performance when compared to the region without intermediate layer. The length of cracks at the end of the study was 764 cm in the region without intermediate layer, 328 cm in the region with geotextile G150 and 554 cm in the region with geotextile G150 TF. Samples were extracted from the track to see how the cracking was developed and also to identify where there was reflective cracking. On the material removed was observed occurrence of reflective cracking, fatigue cracking and also top-down cracking (TDC). The results show that geotextiles increases the life of concrete asphaltic overlays.
18

Avaliação de desempenho de recapeamentos asfálticos com camada intemediária de geotêxtil submetidos à solicitação por simulador de tráfego / Performance evaluation of asphalt overlays containing intermediate layer of geotextile submitted to traffic simulator

Fiorin, Marcelo Menezes January 2009 (has links)
Esta dissertação apresenta os resultados e análises do monitoramento de um recapeamento asfáltico executado com camada intermediária de geotêxtil. A pista experimental vem sendo solicitada desde 1999, em uma pesquisa que se encontra na sua terceira fase, atingindo 1.103.885 ciclos de carga de 100 kN aplicados. Nessa última fase de estudo o tráfego foi aplicado entre Setembro de 2008 e Fevereiro de 2009, totalizando 121.685 ciclos de carga de eixo de 100 kN. A pista foi dividida em três regiões, sendo empregado em duas delas geotêxteis impregnados com asfalto. Durante o período de estudo foram monitorados parâmetros de resposta estrutural, através de medidas de deflexões e bacias defletométricas, parâmetros de comportamento, através de medidas de deformações permanentes e mapeamento de trincas, e por fim parâmetros ambientais, através das medidas de temperatura do ar e precipitações. Foram também aplicados modelos de previsão de desempenho para o caso de reflexões de trincas. O monitoramento do trincamento na pista mostrou que as regiões com geotêxtil tiveram melhor desempenho quando comparadas à região sem camada intermediária. O comprimento de trincas no final do estudo foi de 764 cm na região sem camada intermediária, 328 cm na região com geotêxtil G150 e 554 cm na região com geotêxtil G150 TF. Foram extraídos corpos de prova da pista, sobre algumas trincas, de modo a se visualizar o modo de desenvolvimento do trincamento, e também para buscar se identificar onde ocorreu trincamento por reflexão. Não foi possível extrair CPs de todas as trincas face a proximidade das mesmas e das dimensões da sonda rotativa, porém do material retirado observou-se ocorrência de trincamento por reflexão, trincamento por fadiga e também trincamento conhecido como top-down cracking (TDC). Os resultados evidenciam que a inclusão de geotêxteis como camada de absorção de tensões aumenta significativamente a vida de recapeamentos asfálticos executados sobre pavimentos trincados. / This dissertation presents the results of the monitoring and analysis of an overlay executed with intermediate geotextile layer. The experimental track has been requested since 1999, in a research that is in its third phase, reaching 1.103.885 cycles of 100 kN axle load applied. In this last phase of the study, the traffic was applied between September 2008 and February 2009, totaling 121.685 cycles of 100 kN axle load. The track is divided into three regions, two of them uses geotextiles impregnated with asphalt. During the study period were monitored parameters of structural response, by means of deflections and basins, parameters of behavior, by means of permanent deformation and mapping of cracks, and finally environmental parameters, through the measures of air temperature and rainfall. Models were also applied to predict the performance of the overlay. The monitoring of cracking showed that regions with geotextile had improved performance when compared to the region without intermediate layer. The length of cracks at the end of the study was 764 cm in the region without intermediate layer, 328 cm in the region with geotextile G150 and 554 cm in the region with geotextile G150 TF. Samples were extracted from the track to see how the cracking was developed and also to identify where there was reflective cracking. On the material removed was observed occurrence of reflective cracking, fatigue cracking and also top-down cracking (TDC). The results show that geotextiles increases the life of concrete asphaltic overlays.
19

Estudo do processo de cromatização de arames galvanizados e propostas de alternativas para retardamento da ocorrência prematura de oxidação branca

Rosa, Rogério Laydner da January 2009 (has links)
Este trabalho apresenta um estudo do processo de cromatização de arames galvanizados da Linha de Galvanização 2 da Gerdau Riograndense através do entendimento das variáveis de processo que podem ser alteradas com o intuito de proporcionar uma resistência à oxidação branca maior do que a fornecida com os parâmetros de processo utilizados atualmente. Amostras de arames foram coletadas diretamente da linha de galvanização e submetidas a ensaios acelerados de corrosão em câmaras de umidade saturada (NBR 8095 e ISO 6270-2)16 e de névoa salina (NBR 8094 e ASTM B 117)15. Com base nos resultados obtidos destes ensaios são propostas alterações nas variáveis de processo, como por exemplo, tempo de imersão no tanque de cromatizante, avaliando o aumento ou não do poder protetivo. Os resultados obtidos até agora mostraram que as configurações operacionais da Linha de Galvanização 2 não oferecem uma condição para a formação de uma camada protetora eficiente. Espera-se com este trabalho justificar junto à Empresa a necessidade de alteração de parâmetros de processo para que se consiga obter significativo aumento no poder protetivo conferido pelo cromatizante ao arame galvanizado, e assim, ter condições de disponibilizar ao mercado um produto com qualidade superior no que tange a resistência à oxidação branca. / This work presents a study about the chromatization process for galvanized steel wires in the Galvanizing Line 2 of the Gerdau Riograndense through the understanding of variables of the process that can be modified to provide a superior white corrosion resistance than the one which is provided actually. Samples of wires were collected directly from the galvanizing line and submitted to accelerated corrosion tests in the saturated humidity chamber (NBR 8095 and ISO 6270-2)16 and the salt spray chamber (NBR 8094 and ASTM B 117)15. Based in the results from this tests changes in the process variables are proposed like immersion time in the chromatizating bath to evaluate the increase or decrease of the protective action. The results obtained so far showed that the operational configurations of the Galvanizing Line 2 do not offer a good condition to create an efficient protective layer on the wire. The expectation of this work is to justify to the company that changes in the parameters process are necessaries to get a significant increasing of the protective chromatizating action on the galvanized wire and this way to have conditions to offer to costumers a product with superior quality about white corrosion resistance.
20

Estudo do processo de cromatização de arames galvanizados e propostas de alternativas para retardamento da ocorrência prematura de oxidação branca

Rosa, Rogério Laydner da January 2009 (has links)
Este trabalho apresenta um estudo do processo de cromatização de arames galvanizados da Linha de Galvanização 2 da Gerdau Riograndense através do entendimento das variáveis de processo que podem ser alteradas com o intuito de proporcionar uma resistência à oxidação branca maior do que a fornecida com os parâmetros de processo utilizados atualmente. Amostras de arames foram coletadas diretamente da linha de galvanização e submetidas a ensaios acelerados de corrosão em câmaras de umidade saturada (NBR 8095 e ISO 6270-2)16 e de névoa salina (NBR 8094 e ASTM B 117)15. Com base nos resultados obtidos destes ensaios são propostas alterações nas variáveis de processo, como por exemplo, tempo de imersão no tanque de cromatizante, avaliando o aumento ou não do poder protetivo. Os resultados obtidos até agora mostraram que as configurações operacionais da Linha de Galvanização 2 não oferecem uma condição para a formação de uma camada protetora eficiente. Espera-se com este trabalho justificar junto à Empresa a necessidade de alteração de parâmetros de processo para que se consiga obter significativo aumento no poder protetivo conferido pelo cromatizante ao arame galvanizado, e assim, ter condições de disponibilizar ao mercado um produto com qualidade superior no que tange a resistência à oxidação branca. / This work presents a study about the chromatization process for galvanized steel wires in the Galvanizing Line 2 of the Gerdau Riograndense through the understanding of variables of the process that can be modified to provide a superior white corrosion resistance than the one which is provided actually. Samples of wires were collected directly from the galvanizing line and submitted to accelerated corrosion tests in the saturated humidity chamber (NBR 8095 and ISO 6270-2)16 and the salt spray chamber (NBR 8094 and ASTM B 117)15. Based in the results from this tests changes in the process variables are proposed like immersion time in the chromatizating bath to evaluate the increase or decrease of the protective action. The results obtained so far showed that the operational configurations of the Galvanizing Line 2 do not offer a good condition to create an efficient protective layer on the wire. The expectation of this work is to justify to the company that changes in the parameters process are necessaries to get a significant increasing of the protective chromatizating action on the galvanized wire and this way to have conditions to offer to costumers a product with superior quality about white corrosion resistance.

Page generated in 0.2875 seconds