• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 10
  • 4
  • Tagged with
  • 15
  • 15
  • 13
  • 13
  • 11
  • 6
  • 6
  • 4
  • 4
  • 4
  • 3
  • 3
  • 3
  • 3
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Guidelines for the training of participants in the clean community system

Caws, Guy Cubitt 11 1900 (has links)
The Clean Community System (CCS) is a method of waste management education widely used in the USA by the Keep America Beautiful organization. The CCS has been applied by the eThekwini Municipality since 1981. The training of staff and volunteers in the CCS has to date been limited and based on the American model. The aim of this study is to provide guidelines for the training of participants in the Clean Community System in the South African context. This will be achieved by a study of two community groups that have successfully applied the CCS. The results of the research will be compared with the principles of the CCS and relevant literature. The conclusions drawn from the study will provide guidelines for the training of participants in the CCS. / Further Teacher Education / M. Ed. (Didactics)
12

Investigation on road infrastructure, traffic and safety within the Port of Durban

Kunene, Oscar M. January 2013 (has links)
Submitted in fulfillment for the degree of Magister Technologiae: Engineering: Civil, Durban University of Technology, Durban, South Africa, 2013. / An increase in road traffic, poor road conditions and high numbers of road accidents are major challenges at the Port of Durban. Roads are considered as the most important transport mode at the Port of Durban. Road transport has taken almost 80% of the import and export cargo while railway transport is left with approximately 20%. It is estimated that 75 million lives in the world will be lost and 750 million people injured in road accidents in the first half of the 21th century. The Port of Durban is an important vehicle for facilitating economic growth of local, regional and national industries. For the Port to maintain global competitiveness with the current trend of globalization, it has to ensure that roads are well maintained, safe and have a smooth traffic flow with no delays. This study provides an overview of the road infrastructure within the Port of Durban in relation to road condition, safety, law enforcement and traffic. Existing and ongoing studies conducted in South Africa and abroad form part of the literature review. This study identifies factors that are affecting the condition of road infrastructure such as growth of container cargo, an increase in the dimension and weight of trucks, transport deregulation, port layout and handling equipments. Deregulation of road transport over the past years has resulted in an 80:20 split between road and rail transport putting more pressure on roads. Cost and time are the major deciding factors in the freight industry. Most customers prefer to use road transport due to the lower cost and reduced time compared to rail transport. There are eight major roads within the Port that connect the South, West and North of eThekwini Municipality namely Bayhead, Quayside, Maydon, Rick Turner, Wisely, South Coast, Bluff and Iran Roads. Asset verification and assessment of the condition of the existing eight major roads found that Quayside Road is in a better condition compared to the other roads. Maydon and South Coast Roads are low rated roads which are in a poor condition. Identification and assessment of the condition of 210 000m² of asphalt paved areas which included minor roads within the Port of Durban was also conducted. Most paved areas and roads fall under D (fair) category which is reasonable but maintenance work may be required within six months. Comparison between the condition of the eight major roads within the Port and outside the Port was investigated. The findings indicate that sections of roads outside the Port are in a better condition than sections within the Port. Traffic counts were conducted in order to determine the utilization of the existing eight major roads. Bayhead and South Coast Road are highly utilized roads. Road accident reports and death reports were analyzed on these roads. Most of the road accidents take place on South Coast Road. A questionnaire survey was conducted, targeting road users who travel on these roads within the Port. Feedback was obtained on the status of road conditions, safety and traffic within the Port of Durban. Findings of this survey revealed that most of the respondents don’t know where to report road defect/s within the Port. Approximately 37.5% of the road users felt not safe to drive on roads within the Port especially on South Coast Road. A high percentage of people (93%) witnessed accidents on these roads. Traffic signals within the Port are maintained by eThekwini Municipality and are very often non-functional. When road signs need to be repaired or replaced, it takes longer than expected. Also, there are limited parking areas around the Port resulting in trucks parking closer to the premises while waiting to collect or deliver cargo. This causes major traffic congestion, for example, on Maydon Road where most trucks park on the side of the road. Recommendations include assessment guidelines that could improve road condition, safety and traffic flow. Areas to be improved with regard to road infrastructure are also highlighted. / M
13

The impact of amalgamation on human resources practice in eThekwini municipality

Madondo, Siphiwe E. January 2008 (has links)
Thesis (M.B.A.: Business Studies Unit)-Durban University of Technology, 2008. xi, 96 leaves / The amalgamation of municipalities came into effect as a legislative requirement brought about a number of challenges for the local government. One such major challenge relates to the impact that these amalgamations will have on human resource practices of the various municipalities. Literature study reveals that during any merger or amalgamation, less attention is paid to the human element of a merger until the merger is almost complete. This lack of attention impacts negatively on the merger results. Like other municipalities, Ethekwini Municipality is a product of this legislative requirement. It was formed as a result of the amalgamation of different municipal entities that had different human resource practices. The problem facing eThekwini Municipality is the misalignment of human resources policies and their effect on the working environment. This study looks at the impact of this amalgamation on the human resources practices of the eThekwini Municipality. The sub-objectives of the study are: to ascertain employees’ perceptions of amalgamation; to determine whether employees believe that the human resources’ matters are handled in a manner that will bring about stability and equity in the workplace; and to establish whether different perceptions exist between employees of the former Durban Metro Central and those of the erstwhile entities. / M
14

The impact of amalgamation on human resources practice in eThekwini municipality

Madondo, Siphiwe E. January 2008 (has links)
Thesis (M.B.A.: Business Studies Unit)-Durban University of Technology, 2008. xi, 96 leaves / The amalgamation of municipalities came into effect as a legislative requirement brought about a number of challenges for the local government. One such major challenge relates to the impact that these amalgamations will have on human resource practices of the various municipalities. Literature study reveals that during any merger or amalgamation, less attention is paid to the human element of a merger until the merger is almost complete. This lack of attention impacts negatively on the merger results. Like other municipalities, Ethekwini Municipality is a product of this legislative requirement. It was formed as a result of the amalgamation of different municipal entities that had different human resource practices. The problem facing eThekwini Municipality is the misalignment of human resources policies and their effect on the working environment. This study looks at the impact of this amalgamation on the human resources practices of the eThekwini Municipality. The sub-objectives of the study are: to ascertain employees’ perceptions of amalgamation; to determine whether employees believe that the human resources’ matters are handled in a manner that will bring about stability and equity in the workplace; and to establish whether different perceptions exist between employees of the former Durban Metro Central and those of the erstwhile entities.
15

An assessment of the sustainability of urban fringe developments in eThekwini Municipality : a case study of Cato Ridge.

Rakubu, Khomotjo Winnie January 2013 (has links)
Across the globe, both developed and developing countries strive to continuously increase economic growth. Many strategies have been developed to guide these countries towards achieving growth and development in a sustainable manner. For many of these countries, cites have become the hubs with regards to the various socio-economic activities taking place within countries. This has in turn subjected cities to tremendous growth. The increased growth of cities has been characterized by radial expansion, wherein development spreads out from the city center to the fringes. The radial expansion of cities has not always been under control or properly managed by government or the private sector as well as the relevant role playing stakeholders. Many socio-economic and environmental challenges have been associated with the rapid urban development that spreads into urban fringes. This dissertation focuses on assessing the sustainability of urban fringes and their developments. It presents a conceptual framework that tackles multiple urban fringe challenges and their various causes as well as the possible solutions thereof. It also focuses on empirically assessing the sustainability of the Cato Ridge urban fringe development in eThekwini Municipality, KwaZulu-Natal Province. The study discovers that the challenges of urban fringe development are economic, social and environmental. It concludes with recommendations for addressing policies of urban fringe developments in order to ensure sustainability. / M.T.R.P. University of KwaZulu-Natal, Durban 2013.

Page generated in 0.0451 seconds