• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 120
  • 56
  • 27
  • 19
  • 16
  • 7
  • 7
  • 6
  • 5
  • 5
  • 4
  • 4
  • 2
  • 2
  • 2
  • Tagged with
  • 317
  • 84
  • 46
  • 44
  • 40
  • 38
  • 36
  • 31
  • 24
  • 22
  • 20
  • 20
  • 19
  • 19
  • 18
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Winning competition in air express business in Hong Kong: a case study

Leung, Pui-fong, Clara., 梁佩芳. January 1995 (has links)
published_or_final_version / Business Administration / Master / Master of Business Administration
22

Rediseño del sistema de información para el área transportado de la empresa Casino Express.

Albornoz González, Leonardo Alfredo January 2007 (has links)
No description available.
23

Increasing freeway merge capacity through on-ramp metering

Rudjanakanoknad, Jittichai. January 2005 (has links)
Thesis (Ph. D. in Engineering)--University of California, Berkeley, 2005. / Includes bibliographical references (p. 64-66). Also available online via the University of California web site (http://repositories.cdlib.org/escholarship/).
24

Feasibility study of the reversal of traffic flow on the Atlanta north freeways during peak hours

Martin, Robert Leroy 05 1900 (has links)
No description available.
25

Utah mail service before the coming of the railroad, 1869 ...

McBride, Ralph L., January 1957 (has links)
Thesis (M.A.)--Brigham Young University, Dept. of History. / Includes bibliographical references (leaves 144-146).
26

An empirical analysis of the behavior of weaving traffic in a freeway weaving section /

Yoo, Kyong-Soo January 1987 (has links)
No description available.
27

The Effects of Gap Stability on Entrance Ramp Merging

Lane, Lyn Evalyn 01 January 1975 (has links) (PDF)
This report analyzes freeway data from a moving merge control system in Tampa, Florida. The distribution of velocity at sensors in the roadway is plotted and compared to a normal distribution. The size of the gaps at each sensor are computed and compared to those at a sensor downstream. The distributions of the change in gap size are plotted for all gaps and then for gaps between the same pairs of vehicles, to determine the effects of prohibiting lane changing. The expected time of arrival of the gaps at a point downstream are computed, compared to the actual time of arrival, and distributions of the change in arrival times are plotted. Several algorithms are considered for scheduling ramp vehicles to intercept the gaps observed at a given sensor and compared to the actual time of arrival of the gaps at the merge point. The percentage of each gap available to the merging vehicle is computed and the distribution plotted for each algorithm.
28

Measurements of ground settlement and building deformations due to tunnelling

Barakat, Mohamed Ali January 1996 (has links)
No description available.
29

The design of a mapping language for STEP software systems

Bailey, Ian David January 1996 (has links)
No description available.
30

Globální optimalizace v TNT Express Worldwide CZ / Global Networks Optimization in TNT Express Worldwide spol. s r.o.

Červeňák, Marián January 2010 (has links)
Final thesis pursues problematics of optimization methods used in PUD optimization project, in TNT Express Worldwide spol. s r.o. In theoretical part, considerable part concentrates on various optimisation methods, which leads to another science branches, mainly quantitative management. Operative part focuses on critical evaluation of PUD optimization project.

Page generated in 0.0554 seconds