• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 12
  • 4
  • 1
  • Tagged with
  • 31
  • 31
  • 12
  • 6
  • 5
  • 5
  • 4
  • 4
  • 4
  • 4
  • 3
  • 3
  • 3
  • 3
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

'Elopement' opportunities among dementia patients in nursing homes : architectural considerations

Connell, Bettye Rose 12 1900 (has links)
No description available.
22

Site selection and financing of professional sports stadiums and arenas

Igo, Andrew Lewis 12 1900 (has links)
No description available.
23

Estudo dos métodos de projeto de fábrica e sua aplicação no setor público de serviços: estudo de caso em escolas de educação infantil.

Guerreiro, Érico Daniel Ricardi 31 May 2004 (has links)
Made available in DSpace on 2016-06-02T19:52:01Z (GMT). No. of bitstreams: 1 DissEDRG.pdf: 2933228 bytes, checksum: b52a46eb90051819028742127c93e984 (MD5) Previous issue date: 2004-05-31 / This work contributes for the project and planning of children s schools, searching a project method that it makes possible to structuralize the facilities in function of the carried through productive activities. The objective is to analyze the use of the for facilities planning methods, into project of children s schools, its viability, effectiveness, necessity and particularity. This analisys objective to conceive children s schools through a scientific method that guarantees of its productive performance. Initially it is made a study of existing methods of facilities planning, its content and its applications, for election of a method that better get adapted to the project of children s schools. Also a study on the children education is carried through, service that guides the planning of the object of this study, children s schools. Beyond these, a study is become fulfilled on the inquiry of the activity of work, that will guide the practical ones of inquiry of the chosen object for this study. After the chosen method, a study of case in a school on the São Carlos City to prove the application of the method, its necessity and efficiency. One result identified was the lack of knowledge of the demand and its characteristics to it in the city, a determination of the installations on the services and a series of particularities for the application of the method in schools it was also verified that the application of the project method chosen is viable and necessary for the construction of children s schools. / Esse trabalho contribui para o projeto e o planejamento de escolas de educação infantil, buscando um método de projeto que possibilite estruturar as instalações, em função das atividades produtivas realizadas. O objetivo é analisar o emprego dos métodos para o planejamento de situações produtivas no projeto de escolas de educação infantil, sua viabilidade, eficácia, necessidade e especificidades. Essa análise visa possibilitar a concepção de escolas de educação infantil, através de um método científico, garantindo seu desempenho produtivo. Realiza-se inicialmente, um estudo dos métodos de projetos de situações produtivas existentes, seus escopos e suas aplicações, para selecionar o método que melhor se adapte ao projeto de escolas de educação infantil. Também é realizado um estudo sobre a educação infantil, serviço que norteia o planejamento das escolas de educação infantil, que é o objeto desse estudo. Além desses, realiza-se um estudo sobre a investigação da atividade de trabalho, que irá orientar as práticas de investigação do objeto escolhido para esse estudo. A partir do método escolhido, é feito um estudo de caso numa escola do Município de São Carlos para provar a aplicação do método, sua necessidade e eficiência e especificidade. Como resultado identificou-se a falta de conhecimento da demanda e suas características por parte do município, uma determinação das instalações sobre os serviços e uma série de especificidades para a aplicação do método em escolas. Verificou-se também que a aplicação do método de projeto escolhido é viável e necessária para a construção de escolas de educação infantil.
24

Climatic design guidelines for development of secondary schools in Lagos State, Nigeria

Ifekauche, Peter Amobi January 1983 (has links)
M. Arch.
25

The renovation of a church: a design that enables the First Baptist Church to extend its ministry to the Gainsboro community of Roanoke, Virginia

Haney, Michael C. January 1979 (has links)
The renovation of existing buiIdings is an alternative to new construction in urban renewal. The members of First Baptist Church of Roanoke, Virginia made the decision to utilize their existing structure after their new church facilities have been built. They believe that their building is an established landmark in the community, and that a reuse of this building would benefit the community. They feel that this building could become a vehicle to extend its ministry to the community. A workshop, with Halprin scoring, role playing, and brainstorming, was used to establish the buiIding program. The program established the foundation for the design of the renovation of the church building. A description of the workshop and results, the design process and final design are included. / Master of Architecture
26

A model for effective development of plant layouts and material handling systems : En modell för effektiv utformning av fabrikslayouter och materialhanteringssystem

Bäck, Daniel, Johansson, Peter January 2006 (has links)
In this thesis was a model developed, in order to improve deficiencies in existing literature regarding the layout problem and to give companies a comprehensible user-friendly procedure on how to design competitive production processes, plant layouts and material handling systems. The model consists of six phases that can be used sequentially in order to design, evaluate, implement and maintain effective plant layouts and material handling systems. The model can also be used to examine and optimize processes. The first four phases of the model were tested successfully in a case study at Holtab AB, a medium sized manufacturing company in Tingsryd.
27

A model for effective development of plant layouts and material handling systems : En modell för effektiv utformning av fabrikslayouter och materialhanteringssystem

Bäck, Daniel, Johansson, Peter January 2006 (has links)
<p>In this thesis was a model developed, in order to improve deficiencies in existing literature regarding the layout problem and to give companies a comprehensible user-friendly procedure on how to design competitive production processes, plant layouts and material handling systems. The model consists of six phases that can be used sequentially in order to design, evaluate, implement and maintain effective plant layouts and material handling systems. The model can also be used to examine and optimize processes. The first four phases of the model were tested successfully in a case study at Holtab AB, a medium sized manufacturing company in Tingsryd.</p>
28

Vocational training centre for the deaf

劉少偉, Lau, Siu-wai. January 1997 (has links)
published_or_final_version / Architecture / Master / Master of Architecture
29

'n Liggingsanalise van blanke openbare skole in Transvaal

Pienaar, Alphonso Theofilus 20 November 2014 (has links)
M.A. (Geography) / Please refer to full text to view abstract
30

Impact of the location of new schools on transportation infrastructure and finance

Wagner, James Bartley 19 February 2009 (has links)
Public school planning and land use planning have become increasingly separated fields over the last 35 years. This results in misaligned goals when school districts do not plan facilities that support a community's land use planning goals. The result is a disjointed growth pattern where new schools are built on the urban fringe and act as a magnet for new development that often goes against desired development patterns. Previous research on school locations and development patterns has focused on institutional barriers to cooperation and strategies to help local governments cooperate better with local land use planners. To date, there has been no significant research that attempts to quantify the relationship between school location and development patterns and the transportation infrastructure necessary to serve new development. This research shows that there is a relationship between school location and new development. Four counties in Georgia were selected as case studies and analyzed with a Geographic Information System (GIS) to determine the significance of the link between these activities. Counties were selected based on their character (urban, suburban, exurban, rural) and analyzed separately. An elementary school and high school were analyzed for each county. In addition, interviews with school facility planners were conducted to further define what institutional barriers prevent cooperation among local land use planners and school planners. It was found that there is a wide range of levels of cooperation between school planners and local planners. Some school districts had a formalized communication process with local planners, some had an ad-hoc communication process, and others had no process at all. Recommendations are made on ways to improve the cooperation between these two professional fields. This thesis also examines the link between education and transportation capital funding. Georgia lawmakers are struggling to determine what type of capital funding mechanism would be appropriate for new transportation projects, but these new projects may negatively impact educational funding, which is currently based on a sales tax.

Page generated in 0.0905 seconds