Spelling suggestions: "subject:"feasibility studies."" "subject:"easibility studies.""
21 |
A recourse-based solution approach to the design of fuel cell aeropropulsion systemsChoi, Taeyun Paul. January 2008 (has links)
Thesis (Ph. D.)--Aerospace Engineering, Georgia Institute of Technology, 2008. / Committee Chair: Mavris, Dimitri; Committee Member: German, Brian; Committee Member: Haynes, Comas; Committee Member: Masson, Philippe; Committee Member: Soban, Danielle.
|
22 |
A feasibility study of a domestic airport-ferry link : a Delphi evaluation /Tsui, Chun-fai, Joseph. January 1994 (has links)
Thesis (M.A.)--University of Hong Kong, 1994.
|
23 |
A feasibility study of a domestic airport-ferry link a Delphi evaluation /Tsui, Chun-fai, Joseph. January 1994 (has links)
Thesis (M.A.)--University of Hong Kong, 1994. / Also available in print.
|
24 |
Perioperative immunonutrition in head and neck cancer : a feasibility study /McCarthy, Mary Agnes Smith. January 2006 (has links)
Thesis (Ph. D.)--University of Washington, 2006. / Vita. Includes bibliographical references (p. 125-137).
|
25 |
Otimizacao da etapa de armazenamento de rejeitos radioativosDELLAMANO, JOSE C. 09 October 2014 (has links)
Made available in DSpace on 2014-10-09T12:49:31Z (GMT). No. of bitstreams: 0 / Made available in DSpace on 2014-10-09T14:02:16Z (GMT). No. of bitstreams: 1
10380.pdf: 7268074 bytes, checksum: fcb1abf468040268c71659acc3619d8d (MD5) / Tese (Doutoramento) / IPEN/T / Intituto de Pesquisas Energeticas e Nucleares, IPEN/CNEN-SP
|
26 |
Estudo de aplicacao da tecnologia 'fieldbus' nos sistemas de controle e seguranca de uma planta de radioesterilazacaoKARAM JUNIOR, DIB 09 October 2014 (has links)
Made available in DSpace on 2014-10-09T12:45:05Z (GMT). No. of bitstreams: 0 / Made available in DSpace on 2014-10-09T14:07:13Z (GMT). No. of bitstreams: 1
07018.pdf: 10762605 bytes, checksum: dde87e5021d3a02a17d6484ba32c8e9d (MD5) / Dissertacao (Mestrado) / IPEN/D / Instituto de Pesquisas Energeticas e Nucleares - IPEN/CNEN-SP
|
27 |
Analise da viabilidade tecnico-economico-ambiental da operacao do sistema elevatorio Tiete-Billings no suprimento de agua e eletricidade na regiao metropolitana de Sao Paulo / Analysis of technical feasibility, economic and environmental operation of the lift system Tietê-Billings in the supply of water and electricity in the metropolitan region of São PauloMARTINS, LUIZ 09 October 2014 (has links)
Made available in DSpace on 2014-10-09T12:27:34Z (GMT). No. of bitstreams: 0 / Made available in DSpace on 2014-10-09T14:06:56Z (GMT). No. of bitstreams: 0 / Dissertacao (Mestrado) / IPEN/D / Instituto de Pesquisas Energeticas e Nucleares - IPEN-CNEN/SP
|
28 |
Otimizacao da etapa de armazenamento de rejeitos radioativosDELLAMANO, JOSE C. 09 October 2014 (has links)
Made available in DSpace on 2014-10-09T12:49:31Z (GMT). No. of bitstreams: 0 / Made available in DSpace on 2014-10-09T14:02:16Z (GMT). No. of bitstreams: 1
10380.pdf: 7268074 bytes, checksum: fcb1abf468040268c71659acc3619d8d (MD5) / Tese (Doutoramento) / IPEN/T / Intituto de Pesquisas Energeticas e Nucleares, IPEN/CNEN-SP
|
29 |
Estudo de aplicacao da tecnologia 'fieldbus' nos sistemas de controle e seguranca de uma planta de radioesterilazacaoKARAM JUNIOR, DIB 09 October 2014 (has links)
Made available in DSpace on 2014-10-09T12:45:05Z (GMT). No. of bitstreams: 0 / Made available in DSpace on 2014-10-09T14:07:13Z (GMT). No. of bitstreams: 1
07018.pdf: 10762605 bytes, checksum: dde87e5021d3a02a17d6484ba32c8e9d (MD5) / Dissertacao (Mestrado) / IPEN/D / Instituto de Pesquisas Energeticas e Nucleares - IPEN/CNEN-SP
|
30 |
Analise da viabilidade tecnico-economico-ambiental da operacao do sistema elevatorio Tiete-Billings no suprimento de agua e eletricidade na regiao metropolitana de Sao Paulo / Analysis of technical feasibility, economic and environmental operation of the lift system Tietê-Billings in the supply of water and electricity in the metropolitan region of São PauloMARTINS, LUIZ 09 October 2014 (has links)
Made available in DSpace on 2014-10-09T12:27:34Z (GMT). No. of bitstreams: 0 / Made available in DSpace on 2014-10-09T14:06:56Z (GMT). No. of bitstreams: 0 / O presente estudo analisa a água da bacia do alto Tietê, tanto como insumo na forma de água potável produzido em oito Estações de Tratamento de Água (ETA), quanto insumo na forma de energia hidráulica, ou ainda, como água residuária gerada por diferentes atividades de origem antrópica. O maior problema desta bacia é a água residuária que é lançada nos rio Tietê e Pinheiros devido ao déficit de 32,41 m3/s (2008) no tratamento de esgoto da Região Metropolitana de São Paulo (RMSP) o qual produz uma carga poluidora de 920 mil kg de DBO/dia. As águas urbanas que passam pelo canal do rio Pinheiros no período de cheias e de seca têm o mesmo destino que é o reservatório Billings. No entanto, os atos institucionais que permitem a operação de bombeamento da água para o reservatório são distintos. O primeiro caso ocorre pela ação de controle de cheia da RMSP e está apoiada na Resolução Conjunta de Secretarias de Estado de São Paulo (SEE- SMASRHSO em 13/03/96) que permite o bombeamento das águas nas seguintes situações de emergência: (1) previsão de vazão do rio Tietê no ponto de sua confluência com o rio Pinheiros, acima de 160 m3/s. (2) sobrelevação superior a 30 cm de nível d´água na confluência com o rio Pinheiros. No segundo caso, a Empresa Metropolitana de Águas e Energia (EMAE) propôs o Projeto Flotação à Secretaria de Estado do Meio Ambiente (SMA, 2004) para tratar 10 m3/s de águas originárias do canal de Pinheiros (set/2007 a set/2008) por meio da tecnologia de Flotação em Fluxo. Usando-se como base em informações do Plano de Tratamento de Esgoto para a grande São Paulo (SANEGRAN) e dados da operação do protótipo de flotação do Sistema Pinheiros-Billings (Projeto QAPB), concluiu-se que o impacto ambiental causado no reservatório Billings pela carga de poluentes (massa por segundo) bombeada após a flotação da água do rio Pinheiros foi sempre menor do que aquela observada na operação controle de cheias. O tratamento por flotação apresentou remoção de 91% para o fósforo total, 90% para o E.coli, 53% para a matéria orgânica e 14% para o nitrogênio amoniacal. Observou-se um aumento de 34% para o oxigênio e uma diminuição de 46% na turbidez. A análise da viabilidade técnica da operação do Sistema Elevatório Tietê-Billings realizada pelo Método AHP-Analitic Hierarchy Process, demonstrou que 65,62% da água que entra no reservatório Billings pode ser utilizada para gerar energia elétrica, enquanto que 34,38% desta água pode ser utilizada no abastecimento da RMSP. O estudo da viabilidade econômica comparou o custo do processo flotação com o custo de aporte de água proveniente de outros mananciais e demonstrou que o custo da operação de flotação das águas do rio Pinheiros para servir ao abastecimento da RMSP é economicamente viável. / Dissertacao (Mestrado) / IPEN/D / Instituto de Pesquisas Energeticas e Nucleares - IPEN-CNEN/SP
|
Page generated in 0.0675 seconds