• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 20
  • 10
  • 9
  • 2
  • 1
  • 1
  • Tagged with
  • 48
  • 48
  • 21
  • 14
  • 8
  • 8
  • 8
  • 7
  • 7
  • 7
  • 7
  • 6
  • 6
  • 6
  • 5
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
41

Zdravotně technické a plynovodní instalace v tělocvičně / The Sanitation installations and gas installations in a gym

Křoustek, Jiří January 2013 (has links)
The thesis deals with the topic of the Sanitation installations and gas installations in a gym. The core element of the theoretical part is the water saving while using the economical fixture in the building. The following point is the financial estimation. The thesis also deals with various options of solving the scheduled specialisation. Here, the two ways of proportioning and two ways of mixing the hot water for taking a shower are described in detail. The project part is trying to solve the sanitary technical and gas pipeline in a gym in the chosen version.
42

Zdravotně technické instalace a plynovod v penzionu pro seniory / Sanitary installations and gas pipeline in the pension for seniors

Polách, Petr Unknown Date (has links)
This diploma thesis deals with the design of sanitary and gas installations in a boarding house for seniors and their connection to existing utilities. For the whole object there will be designed operating water supply with the use of rainwater. The diploma thesis also includes the design of a sewage pumping station, grease trap, light liquid separator, infiltration equipment and rainwater tank. The theoretical part is focused on the issues of gray water and rainwater and subsequent use as operating water. Computational part and project part solves sewerage distribution, water supply and gas pipeline in the specified object. It is a partially basement object with five floors. The object includes a surgery, a cafe and a shopping place.
43

Media as a Battlefield: The Competition between Nabucco and the South Stream

Zabrovskaya, Ekaterina S. 09 August 2012 (has links)
No description available.
44

Zdravotně technické instalace v polyfunkčním domě / Sanitation installation in a multifunctional building

Vaněrka, Zdenek January 2014 (has links)
The diploma thesis deals with the problems of sanitation installation in a multifunctional building in Kunstat. The theoretical part focuses on the analysis of the topic, with emphasis on the water demand. The experimental part focuses on drinking water consumption in real objects. The thesis also focuses on possible solutions given specialization. The project solves the sanitation installation of the multifunctional building in the selected variant. It is a multi-storey building where are a guesthouse for short-term accommodation, café, public toilets, commercial space and a fitness center.
45

Zdravotně technické a plynovodní instalace kryté plovárny / Sanitation installation and gas installation in a indoor pool

Hrbáček, Miroslav January 2014 (has links)
The Master‘s thesis addresses sanitation installation and gas installation in the indoor swimming pool in Litomyšl. The theoretical part focuses on the use of greywater and rainwater as service water. The thesis includes the design of several variants with their assessment. The project for construction is also part ofthe thesis.
46

Zdravotně technické instalace v nemocnici / Sanitation installation in the hospital

Peřinová, Jitka January 2022 (has links)
The task of this diploma thesis is to prepare the design of sanitary and gas pipeline installations in the assigned hospital building. The building has one underground and four above-ground floors. On the underground floor there are technical premises including a boiler room, hygienic facilities of staff and rooms for storage and cleaning. On the first floor there are ambulances of various kinds. Patient rooms are located over the second and third floors. Each room has its own built-in bathroom. There are also doctor's examination rooms and daily room of staff. On the fourth floor there is an ICU. In the theoretical part I deal with the legionella bacterium. I explain what causes this bacterium, what are the conditions for its reproduction, where it occurs and what measures will prevent its multiplication in water pipes. In the next part, I compare two possible variants of the solution of the design of water pipe routes with the subsequent selection of a more suitable option. The calculation part contains all the calculations used to design sewerage, water supply and gas pipeline, including their connection to utilities.
47

Wissensgestütztes Beobachtungs- und Evaluierungssystem der Landnutzung / Bewertung des Erhaltungszustandes des Ökosystems im Einflussbereich einer Gaspipeline in Bolivien / Knowledge-Based Monitoring and Evaluation System of Land Use / Assessing the Ecosystem Conservation Status in the Influence Area of a Gas Pipeline in Bolivia

Gorrín Manzuli, Arnélida 07 November 2005 (has links)
No description available.
48

Řešení dopravy v centru Havlíčkova Brodu / Traffic situation in the city centre of Havlíčkův Brod and its solution

Tobek, Miroslav January 2013 (has links)
The aim of this diploma thesis is the solution of the traffic situation in the city center of Havlíčkův Brod. Mainly the ground road number II/150 adjustment, which consist in the modification of the two-way traffic to one-way traffic organization in the streets Dolní, Žižkova and Na Ostrově by using the analogy of a roundabout layout, is solved within this thesis. All mentioned modifications simplify the traffic situation, improve the orientation and increase the security and the traffic flow mainly in relation to pedestrians and cyclists. Another part of this thesis is focused on revitalization of the public spaces in front of the community center called Ostrov and junction of existing cycle tracks situated on the both banks of the Sázava river. In relation to this topic the adjustment of rainwater sewerage system, low-voltage above ground network, public lighting, communication electric cables, fire brigade signal lights and low-pressure gas pipeline is also solved.

Page generated in 0.0495 seconds