• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 3
  • Tagged with
  • 3
  • 3
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

La gestión de comunicaciones según el PMBOK y su cuantificación aplicada a un proyecto

Galván Oyague, Andrea Del Pilar January 2015 (has links)
La presente tesis es una propuesta en base a hechos teóricos. La Guía del PMBOK no está completa en el área de comunicaciones, el PMBOK se alimenta de información y se renueva cada cierto tiempo de acuerdo a las lecciones aprendidas de diferentes proyectos. La Gestión de Comunicaciones según el PMBOK no cuantifica y en la práctica es un área de gestión que muchas veces no es tomada en cuenta para planificar, controlar y ejecutar los proyectos. Es por ello que se evaluaron las comunicaciones en un proyecto para poder cuantificar las consecuencias de esta gestión, aportando una herramienta que puede ser aplicada en los proyectos de construcción.
2

Propuesta de metodología para la gestión de los interesados mediante la mejora continua en empresas constructoras medianas enfocadas a proyectos multifamiliares en el distrito de Santiago de Surco

Rojas Araujo, Any Ebany, Leyva Angeles, Christian Ronaldo 28 June 2019 (has links)
El presente proyecto de tesis plantea busca optimizar el proceso de gestión de interesados mediante herramienta de mejora continua para una empresa constructora mediana en el distrito de Santiago de Surco. Las empresas constructoras medianas cuentan con potencial de crecimiento económico y organización, lo cual facilitaría su adaptación y estandarización en torno a la gestión de sus interesados, también llamaos Stakeholders para ello se plantea desarrollar una metodología que integre la gestión de interesados y la mejora continua con la finalidad de lograr diferenciar la empresa constructora en relación a las demás. La metodología de investigación del presente proyecto se basa en recolección de información mediante encuestas realizadas a directores de proyectos, data de tres proyectos multifamiliares desarrollados en este distrito e información recomendada por el Project Managment Institute (PMI). Se procesó 61 encuestas realizadas a directores de proyectos multifamiliares del distrito, asimismo se obtuvo información de tres proyectos multifamiliares, de ello se pudo obtener el organigrama del proyecto, identificación de stakeholders, problemas al gestionar a los stakeholders, acciones para gestionar a los interesados, etc. Esta información será analizada mediante herramientas recomendadas por el PMI y el cuadro integrado para la gestión de stakeholders. En base al análisis de los datos obtenidos en las encuestas y los tres proyectos multifamiliares se plantea la propuesta de metodología, la cual está compuesta de 04 componentes: identificación, planificación, desarrollo – gestión y monitoreo, interactuando entre sí con la finalidad de optimizar los procesos de gestión de interesados y comunicaciones, desarrollando la mejora continua. / This thesis project seeks to optimize the stakeholder management process through a continuous improvement tool for a medium sized construction company in the district of Santiago de Surco. The medium-sized construction companies have potential for economic growth and organization, which would facilitate their adaptation and standardization around the management of their stakeholders, also called Stakeholders for this is proposed to develop a methodology that integrates the management of stakeholders and continuous improvement in order to differentiate the construction company in relation to others. The research methodology of this project is based on the collection of information through surveys of project directors, data from three multi-family projects developed in this district and information recommended by the Project Management Institute (PMI). Sixty-one surveys carried out with directors of multi-family projects in the district were processed. Information was also obtained from three multi-family projects, from which it was possible to obtain the organization chart of the project, identification of stakeholders, problems in managing the stakeholders, actions to manage the interested parties, and so on. This information will be analysed using tools recommended by the PMI and the integrated table for stakeholder management. Based on the analysis of the data obtained in the surveys and the three multi-family projects, the proposed methodology is proposed, which is composed of 04 components: identification, planning, development - management and monitoring, interacting with each other in order to optimize the management processes of stakeholders and communications, developing continuous improvement. / Tesis
3

Modelo de gestión integrado de la Metodología BIM con la gestión de interesados, comunicaciones y recursos de la guía del PMBOK® en la elaboración de expedientes técnicos para proyectos de inversión pública para edificaciones / Integrated management model of the BIM Methodology with the management of stakeholders, communications and resources of the PMBOK® guide in the preparation of technical files for public investment projects for buildings

Fuentes Casas, Pedro Fernando, Leiva Castillo, Martin Manuel, Pinedo Valdez, William 05 February 2021 (has links)
El presente documento tiene como finalidad desarrollar una propuesta de modelo que integre la metodología Building Information Modeling (BIM) con los procesos de gestión de interesados, de comunicaciones y recursos de la Guía del PMBOK® sexta edición para la elaboración de expedientes técnicos en proyectos de inversión pública en edificaciones. Se identificaron las principales causas que originan la paralización de obras públicas en el país, para ello se recopiló información del Ministerio de Economía y Finanzas (MEF) y de la Contraloría General de la República. Se revisó la metodología BIM, así como las áreas de gestión de interesados, de comunicaciones y de recursos de la Guía del PMBOK® sexta edición. De la misma forma se realizó un análisis de las herramientas y técnicas idóneas para la gestión de interesados, de comunicaciones, de recursos y de la aplicación de la metodología BIM. El nuevo modelo integrado contribuirá a mejorar los tiempos en la elaboración de los expedientes técnicos a partir del trabajo colaborativo que promueve la metodología BIM, además de una integración con los procesos de gestión de interesados, de comunicaciones y de recursos. Adicionalmente, permitirá que las Pequeñas Empresas (PyME) puedan cumplir con la normatividad BIM propuesta por el Estado peruano. / This document aims at developing a model that encompasses Building Information Modeling (BIM) methodology with PMBOK® stakeholders, communications and resources management processes for the preparation of technical files in construction public investment projects. The main causes for the interruption of public works in Peru were identified after gathering data from the Ministry of Economy and Finances (MEF) and the Comptroller’s Office. The BIM methodology was reviewed as well as stakeholders, communications and resources management from the Guide for Project Management PMBOK®. Furthermore, an analysis was carried out of the appropriate tools and techniques for stakeholders, communications, resources management and the application of the BIM methodology. The new integrated model will contribute to improve timelines in the preparation of technical files based on collaborative work using BIM methodology as well as an integration of stakeholders, communications and resources management processes. Additionally, it will allow Micro and Small Enterprises (SMEs) to meet the BIM requirements proposed by the Peruvian Government. / Trabajo de investigación

Page generated in 0.1418 seconds