• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 3
  • Tagged with
  • 3
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Propuesta de metodología para la gestión de los interesados mediante la mejora continua en empresas constructoras medianas enfocadas a proyectos multifamiliares en el distrito de Santiago de Surco

Rojas Araujo, Any Ebany, Leyva Angeles, Christian Ronaldo 28 June 2019 (has links)
El presente proyecto de tesis plantea busca optimizar el proceso de gestión de interesados mediante herramienta de mejora continua para una empresa constructora mediana en el distrito de Santiago de Surco. Las empresas constructoras medianas cuentan con potencial de crecimiento económico y organización, lo cual facilitaría su adaptación y estandarización en torno a la gestión de sus interesados, también llamaos Stakeholders para ello se plantea desarrollar una metodología que integre la gestión de interesados y la mejora continua con la finalidad de lograr diferenciar la empresa constructora en relación a las demás. La metodología de investigación del presente proyecto se basa en recolección de información mediante encuestas realizadas a directores de proyectos, data de tres proyectos multifamiliares desarrollados en este distrito e información recomendada por el Project Managment Institute (PMI). Se procesó 61 encuestas realizadas a directores de proyectos multifamiliares del distrito, asimismo se obtuvo información de tres proyectos multifamiliares, de ello se pudo obtener el organigrama del proyecto, identificación de stakeholders, problemas al gestionar a los stakeholders, acciones para gestionar a los interesados, etc. Esta información será analizada mediante herramientas recomendadas por el PMI y el cuadro integrado para la gestión de stakeholders. En base al análisis de los datos obtenidos en las encuestas y los tres proyectos multifamiliares se plantea la propuesta de metodología, la cual está compuesta de 04 componentes: identificación, planificación, desarrollo – gestión y monitoreo, interactuando entre sí con la finalidad de optimizar los procesos de gestión de interesados y comunicaciones, desarrollando la mejora continua. / This thesis project seeks to optimize the stakeholder management process through a continuous improvement tool for a medium sized construction company in the district of Santiago de Surco. The medium-sized construction companies have potential for economic growth and organization, which would facilitate their adaptation and standardization around the management of their stakeholders, also called Stakeholders for this is proposed to develop a methodology that integrates the management of stakeholders and continuous improvement in order to differentiate the construction company in relation to others. The research methodology of this project is based on the collection of information through surveys of project directors, data from three multi-family projects developed in this district and information recommended by the Project Management Institute (PMI). Sixty-one surveys carried out with directors of multi-family projects in the district were processed. Information was also obtained from three multi-family projects, from which it was possible to obtain the organization chart of the project, identification of stakeholders, problems in managing the stakeholders, actions to manage the interested parties, and so on. This information will be analysed using tools recommended by the PMI and the integrated table for stakeholder management. Based on the analysis of the data obtained in the surveys and the three multi-family projects, the proposed methodology is proposed, which is composed of 04 components: identification, planning, development - management and monitoring, interacting with each other in order to optimize the management processes of stakeholders and communications, developing continuous improvement. / Tesis
2

Implementación de la curva de liberación en el last planner system para controlar el impacto del síndrome del 90 % en proyectos multifamiliares / Implementation of the release curve in the last planner® system to control the impact of the 90% syndrome in multi-family projects

Cifuentes Garay, Eduardo, Escalante Bejar, Dyvi, Pastor Jarama, Gabriela Elisa, Sánchez Barrueto, José Andrés 27 September 2021 (has links)
Las empresas constructoras del sector inmobiliario, conforme se acercan a la fecha de entrega del proyecto, enfrentan mayor dificultad para culminarlo. Esto, por lo general, sucede cuando la obra se encuentra alrededor de un 90 % de avance, y el 10 % de avance restante no se comporta de la misma manera que lo ya realizado, generándose ampliaciones de plazo. Cuando se produce esta condición, decimos que se ha generado el Síndrome del 90 %. La gran mayoría de las empresas constructoras del sector inmobiliario plantean su programación de obra en base a la Curva S, o Curva de Avance, y descuidan el control de lo que se viene liberando en la obra. Este comportamiento es el principal motivo por el cual se genera el Síndrome del 90 %, razón por la cual se realiza el presente trabajo de investigación, para diseñar una metodología que reconozca, mitigue y revierta los efectos negativos que este síndrome pueda producir. La propuesta ha sido aplicada a un proyecto multifamiliar en curso y plantea generar una curva adicional a la tradicional Curva S haciendo uso del Last Planner® System. Se trata de la Curva de Liberación, la cual recogerá la data de cómo se están produciendo las liberaciones de partidas de nuestra obra, otorgándonos información que nos permita elaborar una programación que nos aleje del Síndrome del 90 % y de los efectos negativos que éste produce, tales como la ampliación de plazos, el incremento en los costos, las penalidades por no cumplimiento y una segura afectación a la imagen comercial de la empresa. / As the building companies in the real estate sector approach the project delivery date, they face greater difficulty finishing it. This, in general, happens when the work is around 90% complete, and the remaining 10% progress does not behave in the same way as what has already been done, generating an increase in the schedule. When this condition occurs, we say that the 90% Syndrome has been generated. The vast majority of building companies in the real estate sector plan their work schedule based on the S Curve, or progress curve, and neglect to control what is being released in the work. This behavior is the main reason why the 90% Syndrome is generated, which is why this research work is carried out, to design a methodology that recognizes, mitigates and reverses the negative effects that this syndrome may produce. The proposal has been applied to an ongoing multifamily building and proposes generating an additional curve to the traditional S Curve using the Last Planner® System. This is the release curve, which will collect the data on how the releases of items of our work are taking place, providing us with information that allows us to develop a schedule that moves us away from the 90% Syndrome and the negative effects it produces, such as the schedule increase, the cost increase, penalties for non-completion and a certain impact on the commercial image of the company. / Trabajo de investigación
3

Propuesta de adaptación de la gestión colaborativa NEC-3 para mejorar la comunicación e integración de stakeholders en proyectos multifamiliares en Lima / Proposal for adaptation of NEC collaborative management to improve communication and integration of stakeholders in multi-family building projects in Lima

Mamani Zevallos, Jair Oscar 18 January 2022 (has links)
Tras el éxito del Proyecto de los Juegos Panamericanos en el Perú, se dio a conocer ante la sociedad los mecanismos adoptados, por la organización, para lograr los objetivos propuestos en el proyecto. Los Contratos NEC utilizados para el proyecto de los Juegos Panamericanos es un aporte innovador para el sector construcción en nuestro país, se basa principalmente en metodologías colaborativas que enfocan todas sus directrices en el éxito del proyecto y el bienestar de todos los involucrados. El presente proyecto de tesis busca la adaptación de las formas, mecanismos y metodologías de la Gestión Colaborativa NEC en proyectos tradicionales de construcción que se realizan en el Perú, enfocándose principalmente en viviendas multifamiliares en la ciudad de Lima. La investigación plantea resolver la problemática de falta de comunicación e integración de los Stakeholders en proyectos Multifamiliares en Lima. Por ello, a partir de una encuesta de Juicio de expertos que están involucrados en gestión colaborativa de proyectos de construcción se pudo validar la problemática y obtener información valiosa para la investigación. Asimismo, se analizó el proyecto del Complejo Andrés Avelino Cáceres que se realizó dentro del proyecto especial Juegos Panamericanos bajo la metodología NEC, y en base a ello se obtuvo un análisis de riesgos, aplicación de la Junta de Solución de Disputas (DAB) y la gestión de involucrados. Todo ello, se realizó con la finalidad de obtener datos más precisos sobre la gestión colaborativa NEC. Además, en base a los procedimientos anteriores se plantea una propuesta para la gestión de Stakeholders, riesgos y el uso del DAB. Enfocándose principalmente en la integración y comunicación de los Stakeholders en las etapas de Inicio, Planificación, Ejecución y Control del Proyecto. Finalmente se proponen flujogramas para el correcto desarrollo de la gestión de Stakeholders para las diferentes etapas del ciclo de vida del proyecto y herramientas para adoptar esta metodología como: sesiones ICE, un formato para las visitas a obra por parte del DAB, control y mejora continua de la gestión colaborativa. / After the success of the Pan American Games Project in Peru, the mechanisms adopted by the organization to achieve the objectives proposed in the project were made known to society. The NEC Contracts used for the Pan American Games project is an innovative contribution to the construction sector in our country, it is based on collaborative methodologies that focus all its guidelines on the success of the project and the well-being of all involved. This thesis project seeks the adaptation of the forms, mechanisms and methodologies of NEC Collaborative Management in common projects carried out in Peru, focusing mainly on multi-family projects in the city of Lima. The research aims to solve the problem of lack of communication and integration of Stakeholders in Multifamily projects in Lima. For this reason, a survey of experts who are involved in collaborative management of construction projects was able to validate the problem and obtain valuable information for the investigation. Likewise, the project of the Andrés Avelino Cáceres Complex that was carried out within the Pan American Games project under the NEC methodology was analyzed, and based on this, a risk analysis was obtained, using the Dispute Resolution Board (DAB) and the management of involved. All this was done in order to obtain more precise data on NEC collaborative management. Based on the above procedures, a proposal is made for the management of Stakeholders, risks and the use of DAB. Focusing mainly on the integration and communication of those Involved in the Start, Planning, Execution and Control stages of the Project. Flowcharts of stakeholder management development are proposed for these stages and tools to adopt this methodology such as: ICE sessions, a format for site visits by DAB, control and improvement of collaborative management. / Tesis

Page generated in 0.0986 seconds