• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 3
  • Tagged with
  • 3
  • 3
  • 3
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Dirección de proyecto con aplicación de la Guía del PMBOK®, en un proyecto de construcción de puente

Serpa Chávez, Rocky Gustavo, Tineo Ramos, Carlos Antonio 01 October 2015 (has links)
El principal problema encontrado en la actualidad a nivel nacional en el rubro de construcción, es la carencia en la aplicación de una metodología que guíe de manera correcta a los directores de proyecto para hacer una buena gestión. Para atender esta necesidad se recurrió al desarrollo de un modelo práctico de gestión de proyecto adaptado al tipo de contrato con el estado peruano, ayudado de la Guía del PMBOK. Este modelo, materia de la presente tesis, servirá para guiarse de una experiencia real del desarrollo de un proyecto de construcción, desde su fase inicial de evaluación del caso de negocio hasta la fase de cierre de proyecto. Para la presente tesis se definió elegir un proyecto real denominado “Construcción del Puente Yanamonte Km 115” de longitud 20m, ubicado en la Provincia de La Mar del departamento de Ayacucho. El puente es financiado por el estado peruano a través de Provias Nacional del Ministerio de Transportes y Comunicaciones MTC. La guía del PMBOK – Quinta Edición 2013 al ser una guía de buenas prácticas con procesos estandarizados, brinda pautas permitiendo su aplicación a cualquier tipo de proyecto favoreciendo a las organizaciones en cuanto al desarrollo de una mejor gestión de proyectos. En principio la tesis explicará todo lo relacionado al caso de negocio en la fase inicial de evaluación del proyecto. Se estudiará la estructura organizacional actual de la empresa, se analizará los indicadores económicos financieros del entorno del mercado donde se desarrolla la oportunidad del negocio, se evaluará las alternativas estratégicas, se diagnosticará las ventajas competitivas, se diseñará una estrategia para el logro de los objetivos, concluyéndose con la aprobación de la viabilidad del proyecto que resulte rentable para decidir apostar. En el desarrollo del plan para la dirección del proyecto, aplicado a la Construcción del Puente Yanamonte Km 115, se recurrirá a la Guía del PMBOK – Quinta Edición 2013, a fin de utilizar todas las herramientas y técnicas adecuadas, y recomendadas para la elaboración de los documentos de salida de cada proceso. Se aplicará los 47 procesos en las diferentes 10 áreas de conocimiento, en todas las etapas desde: inicio, planificación, ejecución, seguimiento y control, y cierre del proyecto. Los principales entregables en esta fase son las líneas bases de costo, tiempo y alcance. En conclusión, el presente trabajo podrá ser utilizado por Directores de Proyecto, como una modelo guía, desarrollado y basado en las buenas prácticas de la Guía del PMBOK en sus proyectos futuros. / Tesis
2

Aplicación de la guía del PMBOK® en el desarrollo de nuevos productos farmacéuticos en un área de investigación y desarrollo

Soto Vicente, Edson Ivan January 2015 (has links)
La presente tesis está basada en la utilización de los conceptos y metodologías de la guía del Project Management Institute (PMI), denominada Guía de los Fundamentos para la Dirección de Proyectos (Guía del PMBOK®, Cuarta Edición), para aplicarlos en el desarrollo de nuevos productos farmacéuticos en el área de investigación y desarrollo de una industria farmacéutica nacional. Esta guía contiene nueve áreas de conocimiento, entre las cuales aplicaremos, la Gestión del Alcance, Gestión de la Integración, Gestión del Tiempo, Gestión de la Calidad, Gestión de Recursos Humanos, Gestión de Riesgos, Gestión de la Comunicación y Gestión de Costos. Se diseñará y ejecutará el proyecto denominado “Desarrollo de un jarabe de hierro polimaltosado” donde se aplicará la guía del PMBOK, cuarta edición (2008). Este proyecto abarcará desde la aprobación de la “Solicitud de desarrollo”, seguido de la ejecución de las tareas planeadas en la gestión del alcance, hasta la entrega del expediente hacia el ente regulador (DIGEMID). Se estima en base al planeamiento un presupuesto de $ 37 510,00 y un tiempo de ejecución de 416 días. Al finalizar el proyecto, se demuestra que los conceptos, metodologías, herramientas y lineamientos manejados según la guía del PMBOK han sido de mucha utilidad al momento de planificar, ejecutar y controlar el desarrollo del proyecto, los cuales conllevan hacia el ahorro de tiempo, dinero y presupuesto. Se sugirie aplicarlo en el diseño de proyectos para nuevos productos en la industria farmacéutica. / --- This thesis is based on the use of concepts and methodologies of the guide from the Project Management Institute (PMI), called Project Management Body of Knowledge (PMBOK Guide, Fourth Edition), to apply them in the development of new pharmaceutical products in the Research and Development area of a national pharmaceutical industry. This guide contains nine knowledge areas of which we are going to apply: Scope Management, Integration Management, Time Management, Quality Management, Human Resource Management, Risk Management, Communications Management and Cost Management. A project called "Development of Iron Polimaltose Syrup" will be designed and implemented using the PMBOK guide, fourth edition (2008). This project will cover since the approval of the "Request of Development", followed by the execution of the tasks planned in the scope management, until the file is transmitted to the regulatory entity (DIGEMID). Based on planning, it is estimated a budget of $ 37 510.00 and a running time of 416 days. At project completion, it is shown that the concepts, methodologies, tools and guidelines handled according to the PMBOK guide have been very useful when planning, implementing and monitoring the project, which leads to saving time, money and budget. It is suggested to apply it in the project designs for new products in the pharmaceutical industry. Key words: guide of PMBOK, development, new products, research and development, drugs. / Tesis
3

Aplicación de los lineamientos del PMBOK en la gestión de proyecto Centro Comercial Sur Sector Cuatro, San Juan de Miraflores – Lima

Angulo Félix, Roberto Raúl, Ludeña Martínez, Melisa Marlene January 2015 (has links)
El estudio, de tipo correlacional, se realizó al proyecto Centro Comercial Sur Sector Cuatro, de la empresa JE Construcciones SA; ubicada en la ciudad de Lima y parte de aplicar los lineamientos de la guía del PMBOK en la gestión del tiempo, costo y calidad; analizando y evaluando, la problemática generada en la obra durante la etapa de ejecución del periodo 15-03-15 al 15-05-15, hito importante en el proyecto. El análisis parte de dos escenarios: “Primer escenario”, representa el avance real en obra y “Segundo escenario”, representa el avance con el cronograma propuesto, calculándose el valor ganado del primer escenario que fue de S./115,342,840.09 y del segundo escenario que fue de S./153,008,434.03; que refleja la ejecución de obra sin retrasos y pérdidas económicas respecto al tiempo. La gestión de los costos, analiza las valorizaciones quincenales en la curva S para ambos escenarios, obteniéndose los indicadores que determinan el desempeño global de la obra. Para el primer escenario, la estimación a la conclusión (EAC) es S/. 216, 393,289.13 respecto al costo directo (BAC). La gestión de la calidad, implicó la aplicación del diagrama de Ishikawa y el diagrama de Pareto, evaluándose el impacto en el tiempo por los reprocesos del periodo en estudio, denotando una duración total de 76 días y el costo de S. / 86,067.90 que representa el 1.11% del periodo en estudio, conllevando a proponer el plan de calidad, protocolos para mejorar la calidad en los procesos. The study, of type correlational, was realized to the project “Centro Comercial Sur” sector four, of the company JE Constructions SA; located in the city of Lima and part of applying the alignments of guide of the PMBOK in the management of the time, cost and quality; analyzing and evaluating, the problematics generated in the work during the stage of execution of the period 15-03-15 to 15-05-15, important event in the project. The analysis departs from two scenarios: "The First scene", represents the real advance in work and "The Second scene", represents the advance with the proposed chronogram, there being calculated the earned value of the first scene that was S./115,342,840.09 and the second scene that was S./153,008,434.03; that reflects the execution of work without delays and economic losses with regard to the time. The management costs, analyzes the fortnightly valuations in the S curve for both scenarios, obtaining the indicators that determine the overall performance of the work. For the first scenario, the estimate at completion (EAC) is S /. 216, 393,289.13 regarding the direct cost (BAC). The quality management, involved the application of Ishikawa diagram and Pareto chart, evaluating the impact in time to rework the study period, implying a total duration of 76 days and the cost of S / 86,067.90 representing 1.11% of the study period, leading to propose the quality plan, protocols to improve process quality.

Page generated in 0.058 seconds