• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Planejamento operacional para execução dos sistemas prediais hidráulicos, sanitários e de gás combustível / Planning for implementation of operating systems hydraulic building, fuel gas and sanitary

Matos, Adriano Oliveira 30 June 2011 (has links)
Made available in DSpace on 2016-06-02T20:09:14Z (GMT). No. of bitstreams: 1 3951.pdf: 4065471 bytes, checksum: 6bca7e3049841545a8e51fd8370f8cca (MD5) Previous issue date: 2011-06-30 / Financiadora de Estudos e Projetos / In an increasingly competitive civil construction market affected by the ever greater shortage of skilled construction labor, the correct calculation of work team size based on labor productivity data that are feasible and representative of each construction company is an important strategy for overcoming today s challenges. Construction work includes hydraulic and sanitary sewer systems and piped cooking gas installations for buildings, due to the fact that work team size is often calculated empirically. Thus, the objective of this work is to propose a method to calculate the size of teams for the execution of these systems, based on goals of labor productivity and operational planning for the execution of these services, by allocating the members of the teams to the jobs programmed within the timetable foreseen in the work schedule. The proposed method is divided into three main stages: (a) diagnosis of current labor productivity; (b) calculation of work team size and planning at operational level, involving programming of the activities of each work team over the period stipulated for the execution of the work; and (c) control of productivity according to the established goals. The method was applied at a construction site, specifically during the execution of the cold water supply systems and the sanitary sewer systems located in the wet environments of two multistorey residential towers. The method produced satisfactory results, improving labor productivity in the execution of the cold water supply systems by 20.1% and in that of the sanitary sewer systems by 27.7%. / Num mercado de construção civil cada vez mais competitivo e potencializado com o crescente aumento da escassez de mão de obra qualificada para a execução dos serviços, o correto dimensionamento das equipes de execução destes com base em dados de produtividade da mão de obra factíveis e representativos de cada empresa construtora torna-se uma estratégia importante na superação destes desafios impostos atualmente. Dentre os serviços de construção, merecem destaques aqueles relacionados aos sistemas prediais hidráulicos, sanitários e de gás combustível pelo fato de, muitas vezes, as equipes de trabalho serem dimensionadas de forma empírica. Assim, este trabalho tem como objetivo a proposição de um método para o planejamento operacional da execução destes serviços com base no estabelecimento de metas de produtividade da mão de obra e da programação das atividades das equipes dentro dos prazos previstos de acordo com o cronograma da obra. O método proposto é dividido em três etapas principais: (a) diagnóstico da produtividade da mão de obra vigente; (b) dimensionamento das equipes de execução e planejamento ao nível operacional contendo a programação das atividades de cada equipe ao longo do prazo estipulado para execução dos serviços e (c) controle da produtividade em função das metas estabelecidas. O método foi aplicado em um canteiro de obras, especificamente na execução dos ramais de água fria e na execução dos ramais de esgoto sanitário localizados nos ambientes molháveis de duas torres de edifício residencial de múltiplos pavimento. Os resultados obtidos com a aplicação do método nestes dois serviços foram satisfatórios, ocasionando uma melhoria da produtividade da mão de obra (RUP cumulativa) na execução destes serviços na ordem de 20,1% e 27,7%, respectivamente.

Page generated in 0.1263 seconds