• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 4
  • 1
  • Tagged with
  • 5
  • 5
  • 4
  • 3
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Evaluation of flexibility in hydropower stations

Crona, Mats January 2012 (has links)
This report seeks to evaluate the flexibility in a number of Fortum’s hydropower stations. The deregulation of the Nordic electricity market has put an emphasis on revenue maximizing rather than cost minimizing and there are good indications that flexible assets will be even more valuable in the future when more wind power has been introduced into the system. Through interviews with people involved in the hydropower planning and operation process a number of factors with the potential of affecting the flexibility or causing deviations between planned and realized operation have been identified and explained. These interviews have also been used to identify main flexibility limitations in studied stations, and what potentially could be done to improve the flexibility. A data analysis has been performed where historical data from planned and realized operation and results from a model developed in Matlab has been studied. The developed linear programming model is used as a reference level of an idealized theoretical potential for flexibility. Volume weighted average prices have been used to measure and compare the flexibility of studied stations. The analysis shows that the studied stations can be divided into two groups with regards to their flexibility compared to the modeled flexibility. This result is somewhat confirmed by the interview findings. Factors related to constraints imposed by water rights seem to have the biggest single impact on the flexibility of hydropower stations. The potential for flexible operation varies with season and the planned and realized operation is closer to the modeled results during the winter. It is a general opinion within the organization that there is a potential for a more flexible utilization of many hydropower stations. Experience, resources, understanding in how to fully utilize the reservoirs, and how multiple stations in a river reach can be coordinated are keys to improving the flexibility.
2

Operation dependent costs of non-optimal hydropower production : Effects on the operational pattern of the Small Lule River

Lännevall, Joel January 2016 (has links)
In the present electrical market there is an increasing penetration of intermittent energy sources. Several studies have examined its effect on the planning of hydropower operation and the conclusion is that an increasing intermittent production is likely to result in a more variable hydropower operation, utilising a wider span of operational set points. The wear of a hydropower unit is generally at a minimum when operated close to best efficiency and increases when operating at higher or lower set points. This study introduces a method to calculate an operation dependent cost (ODC) function for an arbitrary hydropower unit or unit combination based on vibration measurements and operational data. The method is tested in a case study where an ODC is implemented in Akkats, located in the Small Lule River in order to evaluate its effect on operational pattern, profitability and balancing contribution. The results show that the implemented ODC mainly affects Akkats. For an increasing ODC, Akkats is operated closer to the best point of efficiency and the operational pattern gets less variable and the effect gets more apparent the lower the spot price. Akkats ability to follow the spot price is reduced, decreasing the earning per produced energy with a few percent­ages. Akkats balancing contribution decreases significantly more, due to a less variable operational pattern. The study compares the reduced ODC to the reduced spot income and concludes that the wear cost in Akkats has to be above 1,21 €/MWh in order to be economically feasible to include in the planning. The operational pattern for the simulated river is close to unchanged at highest price hours but during lower price hours an increasing ODC results in an increased production, due to an increasing mean flow and changed operational pattern in Akkats. More production during low prices hours results in a decreasing profitability for all plants along the river. The balancing contribution is close to unchanged in all plants except Akkats, since the production still follows the same pattern.
3

Risque et optimisation pour le management d'énergies : application à l'hydraulique / Risk and optimization for power management : application to hydropower planning

Alais, Jean-Christophe 16 December 2013 (has links)
L'hydraulique est la principale énergie renouvelable produite en France. Elle apporte une réserve d'énergie et une flexibilité intéressantes dans un contexte d'augmentation de la part des énergies intermittentes dans la production. Sa gestion soulève des problèmes difficiles dus au nombre des barrages, aux incertitudes sur les apports d'eau et sur les prix, ainsi qu'aux usages multiples de l'eau. Cette thèse CIFRE, effectuée en partenariat avec Electricité de France, aborde deux questions de gestion hydraulique formulées comme des problèmes d'optimisation dynamique stochastique. Elles sont traitées dans deux grandes parties.Dans la première partie, nous considérons la gestion de la production hydroélectrique d'un barrage soumise à une contrainte dite de cote touristique. Cette contrainte vise à assurer une hauteur de remplissage du réservoir suffisamment élevée durant l'été avec un niveau de probabilité donné. Nous proposons différentes modélisations originales de ce problème et nous développons les algorithmes de résolution correspondants. Nous présentons des résultats numériques qui éclairent différentes facettes du problème utiles pour les gestionnaires du barrage.Dans la seconde partie, nous nous penchons sur la gestion d'une cascade de barrages. Nous présentons une méthode de résolution approchée par décomposition-coordination, l'algorithme Dual Approximate Dynamic Programming (DADP). Nousmontrons comment décomposer, barrage par barrage, le problème de la cascade en sous-problèmes obtenus en dualisant la contrainte de couplage spatial ``déversé supérieur = apport inférieur''. Sur un cas à trois barrages, nous sommes en mesure de comparer les résultats de DADP à la solution exacte (obtenue par programmation dynamique), obtenant desgains à quelques pourcents de l'optimum avec des temps de calcul intéressants. Les conclusions auxquelles nous sommes parvenu offrent des perspectives encourageantes pour l'optimisation stochastique de systèmes de grande taille / Hydropower is the main renewable energy produced in France. It brings both an energy reserve and a flexibility, of great interest in a contextof penetration of intermittent sources in the production of electricity. Its management raises difficulties stemming from the number of dams, from uncertainties in water inflows and prices and from multiple uses of water. This Phd thesis has been realized in partnership with Electricité de France and addresses two hydropower management issues, modeled as stochastic dynamic optimization problems. The manuscript is divided in two parts. In the first part, we consider the management of a hydroelectric dam subject to a so-called tourist constraint. This constraint assures the respect of a given minimum dam stock level in Summer months with a prescribed probability level. We propose different original modelings and we provide corresponding numerical algorithms. We present numerical results that highlight the problem under various angles useful for dam managers. In the second part, we focus on the management of a cascade of dams. We present the approximate decomposition-coordination algorithm called Dual Approximate Dynamic Programming (DADP). We show how to decompose an original (large scale) problem into smaller subproblems by dualizing the spatial coupling constraints. On a three dams instance, we are able to compare the results of DADP with the exact solution (obtained by dynamic programming); we obtain approximate gains that are only at a few percents of the optimum, with interesting running times. The conclusions we arrived at offer encouraging perspectives for the stochastic optimization of large scale problems
4

Optimal Production Planning for Small-Scale Hydropower

Towle, Anna-Linnea January 2018 (has links)
As more and more renewable energy sources like wind and solar power are added to the electricgrid, reliable sources of power like hydropower become more important. Hydropower isabundant in Scandinavia, and helps to maintain a stable and reliable grid with added irregularitiesfrom wind and solar power, as well as more fluctuations in demand. Aside from the reliabilityaspect of hydropower, power producers want to maximize their profit from sold electricity. InSweden, power is bid to the spot market at Nord Pool every day, and a final spot price is decidedwithin the electricity market. There is a different electricity price each hour of the day, so it ismore profitable to generate power during some hours than others.There are many other factors that can change when it is most profitable for a hydropower plant tooperate, like how much local inflow of water there is. Hydropower production is an ideal case forusing optimisation models, and they are widely used throughout industry already. Though theoptimisation calculations are done by a computer, there is a lot of manual work from the spottraders that goes into specifying the inputs to the model, such as local inflow, price forecasts, andperhaps most importantly, market strategy. Due to the large amount of work that needs to be donefor each hydropower plant, many of the smaller power plants are not optimised at all, but are leftto run on an automatic control that typically tries to maintain a constant water level. In Fortum,this is called, VNR, or vattennivåreglering (water level regulation).The purpose of this thesis is to develop an optimisation algorithm for a small hydropower plant,using Fortum owned and operated Båthusströmmen as a test case. An optimisation model is builtin Fortum’s current modelling system and is tested for 2016. In addition, a mathematical model isalso built and tested using GAMS. It is found that by optimising the plant instead of running it onVNR, an increase of about 15-16% in profit could be seen for the year 2016. This is a significantimprovement, and is a strong motivator to being optimising the small hydropower plants.Since the main reason many small hydropower plants are not optimised is because it takes toomuch of employees time, a second phase of this thesis was conducted in conjunction with twoother students, Jenny Möller and Johan Wiklund. The focus of this portion was to develop acentralized controller to automatically optimise the production schedule and communicate withthe central database. This would completely remove the workload from the spot traders, as wellas increase the overall profit of the plant. This thesis describes the results from both the Fortummodel and the GAMS model, as well as the mathematical formulation of the GAMS model. Thebasic structure of the automatic controller is also presented, and more can be read in the thesis byMöller and Wiklund (Möller & Wiklund, 2018). / Tillförlitliga energikällor som vattenkraft blir allt viktigare vart eftersom elkraftsystemet utökasmed fler förnybara energikällor som vindkraft och solenergi. I Norden finns det rikligt medvattenkraft, vilket bidrar till att upprätthålla ett stabilt och pålitligt elnät även med ökadeoregelbundenheter från vindkraft och solkraft samt större variationer i efterfrågan. Bortsett frånvattenkraftens tillförlitlighetsaspekter vill kraftproducenter maximera sin vinst från såld el. ISverige läggs dagligen bud på effektvolym till spotmarknaden Nord Pool och ett slutgiltigtmarknadspris bestäms därefter av elmarknaden. Varje timme under dygnet motsvarar ett enskiltelpris, därmed är det mer lönsamt att generera effekt under de timmar där priset är som högst.Det finns många andra faktorer som påverkar när det är mest lönsamt för ett vattenkraftverk attproducera el, exempelvis hur stort det lokala inflödet av vatten är. Vattenkraftproduktion är idealtför tillämpning av optimeringsmodeller, vilka är vanligt förekommande inom verksamhetsområdet.Även om optimeringsberäkningarna utförs av en dator innebär optimeringen mycket manuelltarbete för Fortums elhandlare som specificerar indata till modellen. Exempel på indata är lokaltinflöde, prisprognoser och kanske viktigast av allt marknadsstrategi. På grund av den storamängden arbete som fordras för varje vattenkraftverk, optimeras inte produktionen för många avde småskaliga kraftverken utan de regleras automatiskt med mål att upprätthålla en konstantvattennivå. Denna typ av reglering kallas vattennivåreglering, VNR.Syftet med examensarbetet var att utveckla en optimeringsalgoritm för ett småskaligtvattenkraftverk, där Fortumägda vattenkraftverket Båthusströmmen används som testobjekt. Enoptimeringsmodell utvecklades i Fortums befintliga system och testades för 2016. Dessutom haren matematisk modell utvecklats och testades med GAMS. Det konstaterades att genom attoptimera produktionen från vattenkraftverket istället för att reglera den via VNR kan envinstökning med cirka 15-16 % för noteras år 2016. Detta är en väsentlig förbättring och är ettstarkt argument för att optimera produktionen från småskaliga vattenkraftverk.Eftersom den främsta orsaken till att många småskaliga vattenkraftverk inte optimeras är denutökade arbetsbelastningen det skulle innebära för de anställda, genomfördes en andra fas iexamensarbetet i samverkan med två andra studenter, Jenny Möller och Johan Wiklund. Fokus fördenna del var att utveckla en centraliserad styrenhet för att automatiskt optimera produktionsplaneroch kommunicera med det befintliga centrala systemet. Detta innebär att utökad arbetsbelastningenfrån elhandlarna undviks, samt öka vattenkraftverkets totala vinst. Denna rapport beskriverresultaten från både Fortum-modellen och GAMS-modellen, liksom den matematiskaformuleringen av GAMS-modellen. Även grundstrukturen för det självreglerandeoptimeringsverktyget presenteras, mer kan läsas i rapporten av Möller och Wiklund (Möller &Wiklund, 2018).Nyckelord: Optimering, vattenkraftplanering, självreglerande, automatisk styrning, optimalplanering
5

Short-term regulating capacity and operational patterns of The Lule River with large wind power penetration

Lönnberg, Joakim January 2014 (has links)
The growing share of installed wind power in the Swedish electricity system has caused concerns whether the available regulating power will be sufficient. Several studies have examined the need of regulating power using both statistical and modelling approaches. However, there is a risk that some aspects of the short-term regulation of hydropower might have been missed. By using one of Vattenfall’s hydropower planning tools, the short-term operation of The Lule River has been simulated with an increasing penetration of wind power. The tool includes detailed models of reservoirs, generating units including efficiency curves and start/stop costs. By introducing a day-by-day simulation with a seven-day window price forecast, updated with a new wind forecast for each iteration, a 21-days scenario has been simulated. Transmission limits are disregarded and the thermal production is reduced with the average wind production. To quantify and compare the regulation capacity, the regulation factor is introduced. It reflects the ability to utilise high-price hours and considering that the need of regulating power for the short-term perspective is reflected in the price it will also reflect the regulation capacity. It is shown that the regulating factor is correlated to the discharge factor,whichis the relation between the maximum discharge to the average statistical discharge for a plant. A high discharge factor provides the flexibility to utilise the fluctuations in price. The discharge factor is adapted to the plants placement in the reach, accounting for both reservoirs located upstream and downstream, especially for The Lule River which has been designed to regulate for the fluctuations in the load. The flexibility required by the rest of the Nordic rivers is quantified for future studies. It is concluded that The Lule River is able to meet some of the fluctuations of wind power production due to the overcapacity ininstalled power. The production can, at the expense of decreased efficiency of the generating units, alter the production to suit a more fluctuating price.It is important to emphasise that The Lule River alone cannot balance a large penetration of wind power. To fully take into account the effects of a large penetration of wind power the study must be expanded to include more scenarios. The study should include different types of hydrological prerequisites and the seasonal variations in power production as well as additional rivers.

Page generated in 0.1084 seconds