• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • 1
  • 1
  • Tagged with
  • 3
  • 3
  • 3
  • 3
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Integrated Project Delivery – Achieving Relational Contracting through Traditional Project Management Methods

Wang, Jilei 22 September 2008 (has links)
No description available.
2

Integrerade arbetsmetoder med Virtual Design and Construction / Integrated working methods with Virtual Design and Construction

Ahlbäck, Moa January 2018 (has links)
Virtual Design and Construction (VDC) introducerades tidigt på 2000-talet för att främja ett arbete med datorbaserade modeller samt involvering av produktionsplanering i designfasen. VDC är ett koncept som idag har anammats inom många bygg- och konsultföretag för att utveckla arbetet med Building Information Model (BIM), innovationer och samverkan inom byggprojekt. Konceptet VDC förändras ständigt och omdefinieras av enskilda individer och företag. Det här resulterar i att det råder en begreppsförvirring hur VDC ska definieras och hur arbete med VDC ska genomföras. Vidare tenderar många byggprojekt att vara fragmenterade med projektmedlemmar som främst fokuserar på sitt eget teknikområde. För att minska fragmentering mellan projektmedlemmar kan integrerade arbetsmetoder tillämpas. Syftet med examensarbetet är därför dels att undersöka innebörden av VDC som koncept och även hur VDC kan stimulera integrerade arbetsmetoder. Ämnet utforskas kvalitativt med vetenskaplig litteratur och intervjustudie. Den vetenskapliga litteraturen definierar konceptuellt VDC och två integrerade arbetsmetoder Integrated Concurrent Engineering (ICE) och Integrated Project Delivery (IPD). Varvid intervjustudien inkluderar respondenter från byggsektorn vars reflektioner om det studerade ämnet presenteras. Studien är geografiskt avgränsad till Sverige.  I resultatet påvisas den rådande tvetydigheten huruvida VDC definieras. För att undvika begreppsförvirring kan det vara behövligt med en gemensam definition av VDC i byggbranschen och även nationella riktlinjer vilka beskriver hur arbete med VDC ska utföras. Vidare kan VDC stimulera ett integrerat arbetssätt genom en ökad samhörighet inom byggprojekt med bland annat gemensamma formuleringar av projektmål och gemensam problemlösning mellan projektmedlemmar. / Virtual Design and Construction (VDC) was introduced early in the 21st century in order to encourage work with computer based models and construction planning in the design phase. VDC is a concept that has been embraced by several construction and consulting companies in order to develop their work with Building Information Model (BIM), innovations and cooperation within construction projects. VDC is a concept that keeps evolving and is being redefined by individuals and companies. This has contributed to a conceptual confusion within the construction sector about the definition of VDC. Furthermore, construction projects tend to be fragmented with project members that are working in silos and primarily focusing on their own discipline. In order to decrease the fragmentation within construction projects integrated working methods can be applied. Therefor the purpose of this master thesis is to explore the concept VDC and how it can stimulate integrated working methods.  The study is examined using qualitative methods based on scientific literature and an interview study. The scientific literature is defining VDC conceptually and two integrated working methods Integrated Concurrent Engineering (ICE) and Integrated Project Delivery (IPD). Furthermore, the interview study includes respondents from the construction industry whose reflections and thoughts about the subject are being presented. The study is geographically limited to Sweden.  The result shows the current ambiguity of how VDC is defined. In order to avoid a conceptual confusion a common definition should be formulated with national guidelines that describe how work with VDC should be conducted. Furthermore, VDC can stimulate an integrated approach through increased cohesion within construction projects, including common objectives within the project and joint problem solving between project members.
3

Case-based Study and Analysis of Integrated Project Delivery (IPD) Approach and Trust-Building Attributes

Pishdad-Bozorgi, Pardis 06 August 2012 (has links)
The goal of this Ph.D. research is to explore the IPD contractual strategies, to highlight the elements that distinguish IPD from a traditional delivery approach, to analyze how trust-based relationships are established and promoted, and to demonstrate if/how trust and IPD contractual principles correlate. The result of this research will promote the understanding of the industry on the strategies that promote trust and integration through real world case studies. The significance of the subject becomes more evident when reflecting on the current industry's crisis: productivity loss, fragmented delivery process, and lack of trust and collaboration. Through a literature review a Project Delivery and Contracting Strategies (PDCS) framework, an IPD traits framework, and a trust-Building framework are developed. The frameworks are used as the organizational tools to structure and inquire relevant information on the two IPD projects. An expert panel is assembled to discuss the frameworks and the findings of literature analysis and to seek the industry's insight on the units of analysis for contract, and the units of measure for trust. The units of analysis for contract are elements, such as strategies for risks/rewards sharing, liability considerations, decision making authority, and governance. The units of measure for trust are the individuals' perception, and the trust-building attributes as outlined in table 4-1. Two IPD projects were selected and their contract agreements were studied. A questionnaire including both open-ended questions and multiple choice questions was developed based on the information collected through: 1. the IPD agreements in each case study, 2. the literature-based frameworks on trust and project delivery contracting strategies. Accordingly, two IPD case studies are developed following the analysis of their IPD agreements and the individual one-on-one interviews with their key IPD players. The trust-building framework presented in this work includes a series of techniques that the contracting parties can follow when establishing their contractual and managerial strategies and also when interacting with each other. / Ph. D.

Page generated in 0.0931 seconds