• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 33
  • 2
  • 1
  • Tagged with
  • 36
  • 36
  • 15
  • 14
  • 14
  • 13
  • 10
  • 9
  • 8
  • 7
  • 7
  • 6
  • 6
  • 6
  • 5
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

O uso de análise de componentes independentes na extração de características dos sinais transitórios de faltas em linhas de transmissão de energia elétrica

Almeida, Aryfrance Rocha 01 September 2017 (has links)
ALMEIDA, A. R. O uso de análise de componentes independentes na extração de características dos sinais transitórios de faltas em linhas de transmissão de energia elétrica. 2017. 97 f. Tese (Doutorado em Engenharia Elétrica)-Centro de Tecnologia, Universidade Federal do Ceará, Fortaleza, 2017. / Submitted by Hohana Sanders (hohanasanders@hotmail.com) on 2017-10-05T11:40:13Z No. of bitstreams: 1 2017_tese_aralmeida.pdf: 10134467 bytes, checksum: 1fe4fbcbc4c1b84143957b9cc2985ba9 (MD5) / Approved for entry into archive by Marlene Sousa (mmarlene@ufc.br) on 2017-11-08T12:54:55Z (GMT) No. of bitstreams: 1 2017_tese_aralmeida.pdf: 10134467 bytes, checksum: 1fe4fbcbc4c1b84143957b9cc2985ba9 (MD5) / Made available in DSpace on 2017-11-08T12:54:55Z (GMT). No. of bitstreams: 1 2017_tese_aralmeida.pdf: 10134467 bytes, checksum: 1fe4fbcbc4c1b84143957b9cc2985ba9 (MD5) Previous issue date: 2017-09-01 / Several methods for localization and classification of faults in electric power transmission lines, using conventional techniques, computational intelligence and digital signal processing techniques have been proposed, intensively, on literature in the last three decades. These methods have improved the process of characterization of faults in various aspects. However, even the methods based on Wavelet Transform (WT), Artificial Neural Networks (ANN) and other techniques derived from smart Computing, do not have convenient and systematic way treaty faults in transmission systems whose data are contaminated by noise. Based on this evidence, this paper proposes a combination of methods using Independent Component Analysis (ICA), the Theory of the Travelling Waves (TTW) and Support Vector Machine (SVM) effective approaches to extracting characteristics of transient signals of fault even before signs considerably contaminated by noise. The approach was applied to locate and recognize faults in a transmission line 500 kV high voltage that connects the substation of President Dutra - MA to the substation of Boa Esperança - PI. The experiment was carried out for different types of faults that have occurred in different locations. The use of these methods applied to a real transmission line model has proven that the proposed methods, in combination, result in superior performance on location and classification of faults. The obtained errors are less than 1% to the location and accuracy of 100% for the classification of faults with noise. The proposed approach has shown performance best when compared to major conventional techniques, as well as when compared to techniques using Artificial Neural Networks and other computational intelligence techniques / Vários métodos para localização e classificação de faltas em linhas de transmissão energia elétrica, utilizando técnicas convencionais, inteligência computacional e técnicas de processamento digital de sinais têm sido propostas, de forma intensiva, na literatura nas tês últimas décadas. Esses métodos têm melhorado o processo de caracterização das faltas em vários aspectos. No entanto, mesmo os métodos baseados em Transformada Wavelet (TW), Redes Neurais Artificiais (RNA) e outras técnicas advindas da computação inteligente, não têm tratado de forma conveniente e sistemática as faltas em sistemas de transmissão cujos dados são contaminados por ruído. Partindo desta evidência, este trabalho propõe combinações de métodos que utilizam a Análise de Componentes Independentes (ACI), a Teoria das Ondas Viajantes (TOV) e Máquina de Vetores de Suporte (MVS) em abordagens eficientes para a extração de características dos sinais transitórios de falta mesmo diante de sinais consideravelmente contaminados por ruído. A abordagem foi aplicada para localizar e reconhecer as faltas, em uma linha de transmissão de alta tensão de 500 kV que interliga a subestação de Presidente Dutra - Ma à subestação de Boa Esperança -PI. O experimento foi realizado para diferentes tipos de faltas que ocorrem em diferentes localizações. A utilização destes métodos aplicados a um modelo real de linha de transmissão tem comprovado que os métodos propostos, de forma combinada, resultam em desempenho superior na localização e classificação de faltas. Os erros obtidos são inferiores a 1% para a localização com acurácia de 100% para a classificação de faltas com ruído. O desempenho da abordagem proposta tem apresentado melhores resultados quando comparados às principais técnicas convencionais, assim quando comparados às técnicas que utilizam Redes Neurais Artificiais e outras técnicas de inteligência computacional
12

Estimação dos parâmetros de linha de transmissão a partir de um segmento de linha discretizado

Utida, Mariza Akiko [UNESP] 02 March 2007 (has links) (PDF)
Made available in DSpace on 2014-06-11T19:22:35Z (GMT). No. of bitstreams: 0 Previous issue date: 2007-03-02Bitstream added on 2014-06-13T19:28:10Z : No. of bitstreams: 1 utida_ma_me_ilha.pdf: 904352 bytes, checksum: 752f1ee472f9c7246beb1651b7b2e820 (MD5) / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES) / Neste trabalho é proposta uma metodologia para obter parâmetros de linha de transmissão a partir da corrente e da tensão de fase obtida em dois pontos consecutivos da linha. O cálculo dos parâmetros da linha de transmissão consiste em determinar as correntes e tensões no domínio de fase e obter a impedância e admitância no domínio de fase. Propõe-se para esse cálculo a utilização do método de decomposição modal, que desacopla uma linha polifásica de n fases em n modos. A vantagem do uso da decomposição modal está na redução da quantidade de elementos complexos da matriz de transformação. Para a solução da decomposição modal foram utilizados a matriz de transformação modal [TI], sendo obtida através do método de Newton-Raphson, e a matriz de Clarke para calcular a impedância longitudinal e admitância transversal da linha em um circuito p . Foi utilizada uma linha trifásica não transposta com plano de simetria vertical de 440 kV e freqüências compreendidas entre 10 Hz e 1 MHz. Desse modo, é feita uma comparação entre os resultados obtidos com a metodologia desenvolvida, calculados a partir das correntes e tensões de fase da linha transmissão de um circuito p utilizando a matriz de Clarke, e a metodologia clássica, que utiliza as equações de Carson e Bessel, as quais levam em consideração o efeito do solo e o efeito pelicular. / In this paper, it is proposed a methodology to obtain parameters of transmission lines from phase currents and voltages obtained in two consecutives points of the lines. The estimation of the parameters of transmissions lines aims to determine the current and voltage in phase domain, as well as, to determine the impedance and admittance in phase domain. It proposes the utilization of the modal decomposition method that decouples a n-phase line of in n modes. The advantage of using modal decomposition is the reduction of the amount of the complex elements in the transformation matrix. To obtain the solution of modal decomposition, it was used a modal transformation matrix [TI] obtained through of Newton-Raphson method and Clarke's matrix that estimates longitudinal impedance and transversal admittance of a line on a p circuit arrangement. It was used an untransposed three-phase line with a vertical symmetry plane of 440 kV and frequencies between 10 Hz and 1 MHz. It is done a comparison between the results obtained with the developed methodology estimated from current and voltage of a transmission line of a p circuit using Clarke's matrix, and calculated by classic methodology that uses Carson and Bessel equations which consider ground and skin effects.
13

Licenciamento ambiental: acompanhamento de implantação de linhas de transmissão no Estado de São Paulo / Environmental Permit: São Paulos Eletric Transmission Lines Construction Follow Up

Sugawara, Tania Regina Sano 21 June 2016 (has links)
O licenciamento ambiental de linhas de transmissão no Estado de São Paulo é conduzido pela Companhia Ambiental do Estado de São Paulo (CETESB), com uso dos princípios da Avaliação de Impacto Ambiental (AIA). Na fase de planejamento dos projetos de Linhas de Transmissão (LTs), isto é, etapa de obtenção da Licença Ambiental Prévia, são estimados os impactos ambientais da implantação e operação do empreendimento, bem como as medidas mitigadoras ou minimizadoras destes impactos. Nas fases de instalação e operação de LTs ocorre a intervenção ambiental de fato. São implementadas e acompanhadas as medidas propostas pela AIA. O acompanhamento ambiental de empreendimentos licenciados com AIA é feito com base nas exigências expressas nas licenças emitidas e uso de vistorias técnicas. Dentre as exigências expressas nas licenças ambientais de LTs, destacam-se a elaboração de relatórios de acompanhamento das obras. Tais relatórios são elaborados pelo empreendedor responsável pela LT ou consultoria contratada pelo mesmo. Este projeto propõe um procedimento para acompanhamento ambiental de linhas de transmissão em licenciamento na CETESB, composto por Termo de Referência do Acompanhamento Ambiental das Obras de Linha de Transmissão e checklist para uso dos empreendedores e suas consultorias responsáveis pela elaboração dos relatórios de acompanhamento das obras e da operação e manutenção das linhas de transmissão. / Environmental permit for eletric transmission lines in the State of São Paulo is conducted by Companhia Ambiental do Estado de São Paulo (CETESB), using the principles of Environmental Impact Assessment (EIA). In the planning phase of the transmission lines projects, meaning, the phase of Preliminary Environmental Permit analisys, the environmental impacts of the implementation and operation of the aactivity are estimated, as well as mitigation our minimization measures. At the phases of installation and operation of transmission lines, occurs the environmental intervention itself. The minimization and mitigation measures estimated on the EIA are implemented and monitored. EIA follow up is based on the requirements expressed in the permits and technical inspections. Among the requirements set out in the environmental permits of transmission lines, highlight the construction environmental follow up reports. These reports are managed by the company responsible for the transmission line or consultant hired by it. This project proposes a procedure for environmental follow up of transmission lines in CETESBs permit process, composed by a Guideline for Transmission Line Construction Environmental Follow Up and a checklist meant to be applied by the company and their consultants responsible for that activity. The outcome expected are monitoring reports with standardized format and efficient information for the analysis of the technical team responsible for the CETESB permiting process. The construction of the proposed products was based on the literature review, documentary review and field observation and in a second stage, the development of pilot products, tests, interviews and construction of the final version.
14

Estudo de vibrações eólicas em linhas de transmissão de energia elétrica de alta tensão / Study of eolian vibrations in high-voltage overhead transmission lines

SANTOS, Alexandre Sá dos 30 October 2008 (has links)
Submitted by Cleide Dantas (cleidedantas@ufpa.br) on 2014-04-10T12:50:22Z No. of bitstreams: 2 license_rdf: 23898 bytes, checksum: e363e809996cf46ada20da1accfcd9c7 (MD5) Dissertacao_EstudoVibracoesEolicas.pdf: 3239444 bytes, checksum: 373f6051e1f209b0e5176fe28e1a0b38 (MD5) / Approved for entry into archive by Ana Rosa Silva (arosa@ufpa.br) on 2014-06-23T01:19:32Z (GMT) No. of bitstreams: 2 license_rdf: 23898 bytes, checksum: e363e809996cf46ada20da1accfcd9c7 (MD5) Dissertacao_EstudoVibracoesEolicas.pdf: 3239444 bytes, checksum: 373f6051e1f209b0e5176fe28e1a0b38 (MD5) / Made available in DSpace on 2014-06-23T01:19:32Z (GMT). No. of bitstreams: 2 license_rdf: 23898 bytes, checksum: e363e809996cf46ada20da1accfcd9c7 (MD5) Dissertacao_EstudoVibracoesEolicas.pdf: 3239444 bytes, checksum: 373f6051e1f209b0e5176fe28e1a0b38 (MD5) Previous issue date: 2008 / O crescente aumento da demanda de energia elétrica tem forçado o avanço tecnológico dos equipamentos responsáveis pelo transporte desta energia fazendo com que estes trabalhem sob tensões cada vez maiores, principalmente por razões econômicas. Mas este fato implica diretamente no incremento do diâmetro do condutor, o que acarreta elevação de seus custos, bem como das estruturas que devem suportá-lo. Para atender a esta necessidade sem aumentar o custo de projeto da linha de transmissão, surgiu a idéia de utilizar mais de um condutor por fase, montados paralelamente entre si a pequenas distâncias, o que é conseguido através da inserção de espaçadores montados a intervalos regulares ao longo dos vãos das linhas. Por outro lado, problemas mecânicos de ordem operacional das linhas podem ocorrer, como, por exemplo, a ruptura total ou parcial dos cabos e/ou espaçadores, proveniente de excitações dinâmicas devidas ao vento. Assim, este trabalho consiste no estudo do comportamento dinâmico de feixe de cabos de linhas aéreas de transmissão, através de um modelo de elementos finitos. O modelo reproduz o acoplamento dos cabos aos espaçadoresamortecedores da linha de transmissão e às estruturas de ancoragem, considerando o efeito de não-linearidade geométrica, decorrente dos grandes deslocamentos dos cabos, bem como a continuidade da linha, ou seja, os vãos adjacentes, que são representados por rigidez equivalente no modelo. O carregamento de vento é modelado através de um processo não deterministico a partir de suas propriedades estatísticas, tal que fica subdividido em duas partes: uma parte média, analisada de forma estática; e uma parte variável, analisada de forma dinâmica. Os resultados obtidos ao longo desse estudo mostram que a parcela variável do carregamento leva a uma resposta dinâmica do modelo que pode ser determinante no seu comportamento. Assim, o procedimento tradicional de assumir o carregamento do vento como uma excitação estática pode levar, em alguns casos a conseqüências desastrosas. / The increasing demand for electrical energy has stimulated the technological advance of the equipment associated to its transport, generating a situation in which one has to operate under ever increasing nominal voltages, mainly due to economical reasons. This fact has a direct implication on the diameter of the conductors, elevating their cost, as well as that of the supporting structures. In order to overcome this problem, without cost elevation of the electrical transmission line project, the idea is to use more than one conductor per phase, in a parallel assembly with small distances between cables, which can be achieved through the insertion of spacers at regular intervals between the supporting towers. However, operational mechanical problems may arise such as, for example, total or partial rupture of cables and/or spacers due to dynamical wind excitations. Thus, this work investigates the dynamical behavior of a bundle of cables of electrical transmission lines, using a finite element model, which reproduces the coupling between cables and the transmission lines’ spacers-dampers and the fixing structures, considering non-linear geometrical effects due to huge cable displacements, and line continuity, i.e., the adjacent vain, which is taken into account by the model as an equivalent stiffness. Wind load is modeled through a non-deterministic process, from its statistical properties, such that two parts are considered: an average load, statistically analyzed, and a variable load, analyzed as a transient. Results show that the variable load part conduces to a dynamic response of the model, which could represent a dominant behavior. Therefore, the traditional methodology of assuming wind load as a static excitation could lead, in some cases, to disastrous consequences.
15

Modelos paramétricos simples e causais para cabos de cobre apropriados para caracterização de enlaces em sistemas G.fast

NUNES, Diogo Lobato Acatauassú 12 December 2014 (has links)
Submitted by Edisangela Bastos (edisangela@ufpa.br) on 2015-05-19T21:56:01Z No. of bitstreams: 2 license_rdf: 22974 bytes, checksum: 99c771d9f0b9c46790009b9874d49253 (MD5) Tese_ModelosParametricosSimples.pdf: 3699932 bytes, checksum: c395418394ea95397d4d13feb967eeab (MD5) / Approved for entry into archive by Ana Rosa Silva (arosa@ufpa.br) on 2015-05-20T14:24:11Z (GMT) No. of bitstreams: 2 license_rdf: 22974 bytes, checksum: 99c771d9f0b9c46790009b9874d49253 (MD5) Tese_ModelosParametricosSimples.pdf: 3699932 bytes, checksum: c395418394ea95397d4d13feb967eeab (MD5) / Made available in DSpace on 2015-05-20T14:24:11Z (GMT). No. of bitstreams: 2 license_rdf: 22974 bytes, checksum: 99c771d9f0b9c46790009b9874d49253 (MD5) Tese_ModelosParametricosSimples.pdf: 3699932 bytes, checksum: c395418394ea95397d4d13feb967eeab (MD5) Previous issue date: 2014 / CNPq - Conselho Nacional de Desenvolvimento Científico e Tecnológico / O G.fast é um novo padrão da União Internacional de Telecomunicações que almeja atingir 1 Gb/s sobre enlaces de cobre curtos, utilizando freqüências de até 212 MHz. Essa nova tecnologia requer modelos paramétricos precisos de cabo para fins de projeto, simulação e testes de avaliação de desempenho. A maioria dos modelos de cabo de cobre foram desenvolvidos focando o espectro VDSL - isto é, freqüências de até 30 MHz - e adotam suposições que são violadas quando a faixa de freqüência é estendida para freqüências G.fast. Esta tese apresenta novos modelos de cabo simples e causais capazes de caracterizar com precisão enlaces de cobre compostos por segmentos individuais ou múltiplos, tanto no domínio do tempo quanto no domínio da freqüência. Resultados utilizando as topologias de referência do padrão G.fast mostram que, além de serem precisos, os novos modelos são atrativos devido ao baixo custo computacional e fórmulas fechadas para ajuste de seus parâmetros junto a dados medidos. / The G.fast is a new standard from the International Telecommunication Union that targets 1 Gb/s over short copper loops, using frequencies up to 212 MHz. This new technology requires accurate parametric cable models for simulation, design and performance evaluation tests. Most existing copper cable models were designed for the VDSL spectra - i.e., frequencies up to 30 MHz - and adopt assumptions that are violated when the frequency range is extended to G.fast frequencies. This thesis presents new simple and causal cable models that are able to accurately characterize copper loops composed by single or multiple segments, in both frequency and time domains. Results using G.fast topologies show that, besides being accurate, the new models are attractive due to their low computational cost and closed-form expressions for fitting their parameters to measurement data.
16

Influência de sistemas meteorológicos de grande escala sobre a distribuição de raios na Amazônia Oriental, com aplicação no setor elétrico

SANTOS, Alex de Assis Santos dos January 2010 (has links)
Submitted by Edisangela Bastos (edisangela@ufpa.br) on 2015-08-10T17:05:33Z No. of bitstreams: 2 license_rdf: 22974 bytes, checksum: 99c771d9f0b9c46790009b9874d49253 (MD5) Dissertacao_InfluenciaSistemasMeteorologicos.pdf: 2592577 bytes, checksum: b8aa11439bcd02781bf7d7a0d5acf2c8 (MD5) / Approved for entry into archive by Ana Rosa Silva (arosa@ufpa.br) on 2015-08-17T12:32:55Z (GMT) No. of bitstreams: 2 license_rdf: 22974 bytes, checksum: 99c771d9f0b9c46790009b9874d49253 (MD5) Dissertacao_InfluenciaSistemasMeteorologicos.pdf: 2592577 bytes, checksum: b8aa11439bcd02781bf7d7a0d5acf2c8 (MD5) / Made available in DSpace on 2015-08-17T12:32:55Z (GMT). No. of bitstreams: 2 license_rdf: 22974 bytes, checksum: 99c771d9f0b9c46790009b9874d49253 (MD5) Dissertacao_InfluenciaSistemasMeteorologicos.pdf: 2592577 bytes, checksum: b8aa11439bcd02781bf7d7a0d5acf2c8 (MD5) Previous issue date: 2010 / REDE CELPA - Centrais Elétricas do Pará / Foi feito um estudo da associação entre a densidade de ocorrência de raios com condições meteorológicas no leste da região Amazônica entre os anos de 2006 a 2008. A região estudada foi limitada por uma grade geográfica entre as latitudes 0º a -10º e longitudes -53º a -43º. Foram desenvolvidos métodos computacionais de processamento estatístico e geração de mapas de ocorrências de raios para diferentes intervalos de tempo. Esses métodos foram aplicados para determinar os pontos de altas ocorrências de raios ao longo de linhas de transmissão de energia elétrica, a fim de oferecer subsídios para a proteção e operação dos sistemas elétricos da região. Foram utilizados dados da rede de detecção de raios do SIPAM para redimensionar a detecção do sistema de alcance intercontinental STARNET, e subsequentemente, foram obtidos mapas de densidade de raios mais uniformes e realistas. Esses mapas foram interpretados em períodos semanais e sazonais, considerando as observações simultâneas de chuva, vento, radiação de onda longa e a presença de sistemas meteorológicos de grande escala. Zona de Convergência Intertropical e Zona de Convergência do Atlântico Sul (ZCIT, ZCAS) definidos pela convergência de ventos e anomalias negativas de Radiação de Ondas Longas ( ROL). Os resultados mostraram boa correspondência entre as áreas de convecção e a intensa ocorrência de raios. Nas regiões de mais alta atividade elétrica atmosférica, foi observada ocorrência de convergência dos ventos e anomalias negativas de ROL, para situações de presença de ZCAS e ZCIT sobre a região. A atividade de raios também coincidiu, com algumas exceções, com áreas de maior precipitação em períodos semanais. Foi observado também que, durante um trimestre seco, os segmentos de linhas de transmissão de Mojú-Tailândia e Jacundá-Marabá apresentaram maior incidência de raios. O pico da densidade de raios chegou a 18 raios/km2/trimestre em alguns locais. Durante o trimestre chuvoso, a densidade geral de raios foi 86% maior e apresentou distribuição espacial mais uniforme quando comparada com um trimestre seco. Este estudo mostrou não somente como as características meteorológicas influenciaram na distribuição e quantidade raios, mas também que a elevada atividade de descargas elétricas na região deve ser uma preocupação importante para os sistemas de distribuição de energia elétrica e outras atividades humanas na Amazônia Oriental. / A study was made of the relationship between lightning occurrence density distribution and their associated meteorological conditions over an area in eastern Amazon region. In order to do that, special programs were developed to statistically process lightning data, as well as, to generate lightning occurrence density maps on a geographical grid, for different time intervals. Using these methods an application analysis was performed to determine “spots” of high lightning frequency of occurrences along electric power transmission lines, in order to offer subsidies for the protection and operation of these electric systems in the region. Lightning data from the Amazonian Protection System (SIPAM) lightning detection network were used to upgrade the detection efficiency of the intercontinental STARNET system, and obtain more uniform and realistic lightning density maps over the limits of 0º to -10º of latitude and -53º to -43º of longitude. These maps were interpreted at weekly and seasonal periods, considering the simultaneous observations of rainfall, wind, long wave radiation (LWR) and the presence of large scale, the Intertropical Convergence Zone and South Atlantic Convergence Zone (ITCZ, SACZ) meteorological systems, acting over the area of study. The results showed good correlation among the areas of intense convection, determined by the convergence of winds and negative LWR anomalies and high lightning activity both for ITCZ and SACZ configuration over the area. Lightning activity also coincided, with a few exceptions, with the areas of higher weekly precipitation. It was observed also that during a dry trimester the transmission lines segment of Mojú-Tailândia and Jacundá-Marabá presented significantly higher incidence of lightning over them. During a rainy quarter the lightning density of currences was, overall, 86% higher and more evenly distributed than during the equivalent drier period, over the area considered. Density maxima of lightning occurrences reached values of 18 events/km2/trimester, at some spot areas. This study showed not only the meteorological characteristics of some lightning producing systems but also the elevated regional lightning activity, which should be an important concern to the electric power distribution systems and other human activities in eastern Amazonia.
17

A Comparison between RS+TCM and LDPC FEC schemes for the G.fast standard

TAKEDA, Marcos Yuichi 01 February 2016 (has links)
Submitted by camilla martins (camillasmmartins@gmail.com) on 2017-03-28T14:12:26Z No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertacao_ComparacaoRS+TCMLDPC.pdf: 893867 bytes, checksum: 0e75a129249af6c11b8245bcb9bf9e5b (MD5) / Approved for entry into archive by Edisangela Bastos (edisangela@ufpa.br) on 2017-03-28T14:47:19Z (GMT) No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertacao_ComparacaoRS+TCMLDPC.pdf: 893867 bytes, checksum: 0e75a129249af6c11b8245bcb9bf9e5b (MD5) / Made available in DSpace on 2017-03-28T14:47:19Z (GMT). No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertacao_ComparacaoRS+TCMLDPC.pdf: 893867 bytes, checksum: 0e75a129249af6c11b8245bcb9bf9e5b (MD5) Previous issue date: 2016-02-01 / CNPq - Conselho Nacional de Desenvolvimento Científico e Tecnológico / A necessidade de velocidades de conexão a internet cada vez maiores motivou a criação de um novo padrão, G.fast, para DSL (linha digital do assinante), de modo a prover performance semelhante a fibra usando par trançado de fios de cobre. Esta dissertação foca em dois prévios candidatos a esquemas de correção de erro, sendo eles codigos Reed-Solomon com modulaçao codificada em treliça (TCM), de padrões DSL anteriores, e códigos de verificação de paridade de baixa densidade (LDPC), do padrão G.hn para redes residenciais. O objetivo principal é comparar os dois esquemas, de modo a avaliar qual deles tem melhor performance, considerando métricas como poder de correção de erro e custo computacional. Embora o código selecionado para o G.fast já tenha sido RS+TCM, acredita-se que esta decisão foi tendenciosa, já que é sabido que códigos mais recentes como LDPC possuem maior poder correção. / The need for increasing internet connection speeds motivated the creation of a new standard, G.fast, for digital subscriber lines (DSL), in order to provide fiber-like performance using short twisted pair copper wires. This dissertation focuses in the two former candidate codes for the forward error correction (FEC) scheme, namely Reed-Solomon (RS) with trellis-coded modulation (TCM), from previous DSL standards, and low density parity check (LDPC) codes, from the G.hn standard for home networking. The main objective is to compare both schemes, in order to evaluate which of them performs better, considering metrics such as error correction performance and computational cost. Even though the selected code for G.fast was RS with TCM, it is believed that this choice was biased, as a more recent iterative code like LDPC is known to have a better error correction performance.
18

Modelização de eléctrodos de terra em sistemas eléctricos de energia

Teixeira, Fernando Jorge Teiga January 2000 (has links)
Dissertação apresentada para obtenção do grau de Mestre em Engenharia Electrotécnica e de Computadores, na Faculdade de Engenharia da Universidade do Porto, sob a orientação do Professor Doutor António Carlos Sepúlveda Machado e Moura
19

Licenciamento ambiental: acompanhamento de implantação de linhas de transmissão no Estado de São Paulo / Environmental Permit: São Paulos Eletric Transmission Lines Construction Follow Up

Tania Regina Sano Sugawara 21 June 2016 (has links)
O licenciamento ambiental de linhas de transmissão no Estado de São Paulo é conduzido pela Companhia Ambiental do Estado de São Paulo (CETESB), com uso dos princípios da Avaliação de Impacto Ambiental (AIA). Na fase de planejamento dos projetos de Linhas de Transmissão (LTs), isto é, etapa de obtenção da Licença Ambiental Prévia, são estimados os impactos ambientais da implantação e operação do empreendimento, bem como as medidas mitigadoras ou minimizadoras destes impactos. Nas fases de instalação e operação de LTs ocorre a intervenção ambiental de fato. São implementadas e acompanhadas as medidas propostas pela AIA. O acompanhamento ambiental de empreendimentos licenciados com AIA é feito com base nas exigências expressas nas licenças emitidas e uso de vistorias técnicas. Dentre as exigências expressas nas licenças ambientais de LTs, destacam-se a elaboração de relatórios de acompanhamento das obras. Tais relatórios são elaborados pelo empreendedor responsável pela LT ou consultoria contratada pelo mesmo. Este projeto propõe um procedimento para acompanhamento ambiental de linhas de transmissão em licenciamento na CETESB, composto por Termo de Referência do Acompanhamento Ambiental das Obras de Linha de Transmissão e checklist para uso dos empreendedores e suas consultorias responsáveis pela elaboração dos relatórios de acompanhamento das obras e da operação e manutenção das linhas de transmissão. / Environmental permit for eletric transmission lines in the State of São Paulo is conducted by Companhia Ambiental do Estado de São Paulo (CETESB), using the principles of Environmental Impact Assessment (EIA). In the planning phase of the transmission lines projects, meaning, the phase of Preliminary Environmental Permit analisys, the environmental impacts of the implementation and operation of the aactivity are estimated, as well as mitigation our minimization measures. At the phases of installation and operation of transmission lines, occurs the environmental intervention itself. The minimization and mitigation measures estimated on the EIA are implemented and monitored. EIA follow up is based on the requirements expressed in the permits and technical inspections. Among the requirements set out in the environmental permits of transmission lines, highlight the construction environmental follow up reports. These reports are managed by the company responsible for the transmission line or consultant hired by it. This project proposes a procedure for environmental follow up of transmission lines in CETESBs permit process, composed by a Guideline for Transmission Line Construction Environmental Follow Up and a checklist meant to be applied by the company and their consultants responsible for that activity. The outcome expected are monitoring reports with standardized format and efficient information for the analysis of the technical team responsible for the CETESB permiting process. The construction of the proposed products was based on the literature review, documentary review and field observation and in a second stage, the development of pilot products, tests, interviews and construction of the final version.
20

Análise da dinâmica dos investidores nos leilões de transmissão de energia elétrica no Brasil entre 1999 e 2017 / Analysis of the dynamics of investors in the auctions of electric power transmission in Brazil between 1999 and 2017

Cazzaro, Pablo Martins 13 December 2017 (has links)
O segmento de transmissão de energia elétrica é parte fundamental na composição de qualquer sistema elétrico de potência, e tem como principal função o transporte da energia elétrica dos polos geradores até os centros consumidores. Neste contexto, o objetivo principal desta dissertação é analisar a participação dos agentes investidores do mercado de transmissão de energia elétrica no Brasil, observando o perfil daqueles que venceram os leilões de transmissão, sob o aspecto de sua governança no tocante à natureza do capital público ou privado, nacional ou estrangeiro. Como questão central, indaga-se como vem se dando a dinâmica do mercado de transmissão de energia elétrica no país, através da análise dos vencedores dos certames de concessão do serviço público de transmissão. A pesquisa aborda ainda elementos que resgatam a importância técnica e econômica da transmissão, sua evolução histórica e as regras de concessão então vigentes no país, além de realizar um levantamento dos leilões de transmissão entre os anos de 1999 a agosto 2017. Visando a reestruturar o setor elétrico brasileiro a partir da década de 1990, um modelo então formulado possibilitou a expansão do sistema de transmissão por meio de concorrências na exploração de concessões públicas do serviço de transporte de energia elétrica. Tal modelo finalmente permitiu que companhias de capital privado, nacional ou estrangeiro, pudessem participar dessa expansão. Entre dezembro de 1999 e agosto de 2017 ocorreram 45 certames, nos quais culminou em uma expansão significativa da malha de transmissão no país, que passou de 66,9 mil km, antes dos referidos leilões, para mais 134,7 mil km, até o ano de 2016. Das centenas de investidores que arremataram os lotes disponibilizados, verificou-se que 89% deles eram de natureza privada e 11%, de natureza pública. Ainda, através da pesquisa realizada, constatou-se que 60% dos lotes negociados foram arrematados por investidores não-consorciados, mesmo diante das vantagens da formação de consórcios na criação de grupos considerados mais robustos financeira e tecnicamente. Os resultados desta investigação também revelaram que os grupos estrangeiros privados não-consorciados foram os que mais se destacaram, obtendo 25,2% das vitórias nos certames, e agregando 24,4% do total das linhas ofertadas em termos de extensão. Ademais, esses grupos estrangeiros privados não-consorciados mostraram-se mais competitivos, com lances que representaram deságios médios de 30,7%, arrematando projetos com potencial de rendimento anual de R$ 2,8 bilhões. Entretanto, por meio da investigação realizada, ainda se constatou que os investidores nacionais públicos não-consorciados continuaram muito influentes, pois: (i) deram lances com deságios também significativos, da ordem de 27,1% na média do período analisado; e (ii) alguns desses investidores nacionais públicos foram os vencedores mais frequentes, seja na forma não-consorciada ou consorciada, como foi o caso da Chesf, com 34 lotes arrematados, seguida de Furnas, com 26 lotes negociados. / The segment of electric power transmission is a fundamental part of any electric power system, and its main function is to transport the electric power from the generating poles to the consumer centers. In this context, the main objective of this dissertation was to analyze the participation of the investors of the electricity transmission market in Brazil, observing the profile change of those who won the transmission auctions, among which were public, private, national and foreign agents. This dissertation targeted to answer the following central question: how was the market dynamic of the electric power transmission in the country taking into consideration the change in the profile of the agents who won the auctions? The research also explored the technical and economic importance of transmission, its historical evolution, the currently rules for concession in the country, as well as the characteristics of transmission auctions conducted between 1999 and August 2017. In order to restructure the Brazilian electric sector from the 1990s onwards, a model was formulated to made possible to expand the transmission system by competitive bidding in the exploration of public concessions for the electric energy transmission service. That model finally allowed domestic and foreign private equity companies to participate in this expansion. Between December 1999 and August 2017, there were 45 auctions and hundreds of lots were put to dispute. Consequently, there was a significant expansion of the transmission network in the country, from 66.9 thousand km before the auctions to a further 134.7 thousand km, until the year 2016. Of the hundreds of investors who purchased the lots available, 89% were private and 11% public. Also, through the research, it was found that 60% of the lots traded were sold by non-consortium investors, even considering the advantages of consortium to create groups financially and technically robust. The results of this investigation also revealed that the not consorted foreign private groups were the most outstanding, obtaining 25.2% of the victories in the auctions, and, adding 24.4% of the total of the offered lines in terms of extension. Furthermore, these foreign private groups were more competitive with bids that represented average discounts of 30.7%, earning projects with potential annual income of R $ 2.8 billion. However, the research also verified that not consorted national public investors are still very influential: (i) they made bids with significant discount, of the order of 27.1% in the average of the analyzed period; and (ii) some of these national public investors were the most frequent winners, either in the non-consortium or consortium form, as was the case of Chesf, with 34 lots acquired, followed by Furnas, with 26 lots traded.

Page generated in 0.0961 seconds