• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 11
  • Tagged with
  • 11
  • 11
  • 11
  • 11
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • 3
  • 3
  • 3
  • 3
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Business consulting – Mantenimiento e Ingeniería Industrial S.R.L

Aguilar Alvarez, Erick Eduardo, Diaz Diaz, Javier Wilson, Guevara León, Cicely Lilibeth, Muñoz Avellaneda, Julio César 22 July 2022 (has links)
MAININ es una empresa que presta servicios de mantenimiento electromecánicos en plantas concentradoras y la ejecución de proyectos civiles con más ocho años de experiencia y operación en el sector privado – energía y minas, donde ha logrado posicionarse como empresa competitiva al brindar servicios de calidad excediendo las expectativas de sus clientes. Ahora bien, del diagnóstico y análisis realizado por el equipo consultor, se ha logrado identificar que el principal problema que enfrenta MAININ es la “insuficiente diversificación de la cartera de clientes y expansión de servicios”; como consecuencia, de la alta prioridad de MAININ a los contratos con Minera Chinalco, con un 88.35% de sus ingresos ($ 42,770,267.79) y con un 74% de los contratos celebrados (77 contratos); así mismo, la carencia de un equipo especializado en Oficina Técnica, la falta de formación continua, la poca diferenciación de los servicios y la escasa experiencia en servicios de consultoría y ejecución de obras, la cuales son generadores del bajo nivel de competitividad de MAININ, pues de un total de 197 invitaciones a licitaciones, solo 30 fueron adjudicadas (15.2%), 47 fueron desestimadas para participar (23.9%) y 120 fueron no adjudicadas (60.9%). Teniendo en cuenta el problema principal y las causas generadoras del mismo, se recomienda la implementación de las siguientes alternativas de solución: a) contrato de consorcio y b) implementación de la PMO a través de la capacitación y entrenamiento del equipo actual de Oficina Técnica. La implementación deberá realizarse en simultaneo, a fin de obtener un beneficio tanto a corto como largo plazo; por lo que, la inversión inicial es de S/ 2,076,000 con un PayBack de 11 meses y 28 días, esperando obtener un VAN de S/ 3,512,379.14 y una TIR de 102%, con lo cual se concluye que la propuesta de solución es viable. / MAININ SRL is a company that provides electromechanical maintenance services in concentrator plants and the execution of civil projects with more than eight years of experience and operation in the private sector - energy and mines, where it has managed to position itself as a competitive company by providing quality services exceeding the expectations of its customers. However, from the diagnosis and analysis carried out by the consulting team, it has been possible to identify that the main problem facing MAININ is the "insufficient diversification of the client portfolio and expansion of services"; as a consequence, of the high priority of MAININ to the contracts with Minera Chinalco, with 88.35% of its income ($42,770,267.79) and with 74% of the executed contracts (77 contracts); Likewise, the lack of a specialized team in the Technical Office, the lack of continuous training, the little differentiation of services and the limited experience in consulting services and execution of works, which are generators of the low level of competitiveness of MAININ, because of a total of 197 invitations to tender, only 30 were awarded (15.2%), 47 were rejected to participate (23.9%) and 120 were not awarded (60.9%). Taking into account the main problem and its generating causes, the implementation of the following solution alternatives is recommended: a) consortium contract and b) implementation of the PMO through the training of the current Technical Office team. The implementation must be carried out simultaneously, in order to obtain a benefit both in the short and long term; therefore, the initial investment is S/ 2,076,000 with a PayBack of 11 months and 28 days, expecting to obtain a NPV of S/ 3,512,379.14 and an IRR of 102%, with which it is concluded that the proposal is viable.

Page generated in 0.1401 seconds