• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Alternativa byggsystem för att minska transmissionsförlusterna på miljonprogrammets byggnader / Alternative renovation systems to reduce the transmissionlosses on buildings from 1965-1975

Andersson, Magnus, Cederholm, Anders January 2009 (has links)
The purpose with this project is to explore and verify three renovating systems for Miljonprogrammet (common expression for buildings constructed during the years 1965-1975 when over a million houses where built in Sweden) to take measure to the largely transmission losses of these buildings. Many of the buildings from this period have similar constructions and therefore the same techniques can be used to renovate several of them. This project only considers the climate scale, although there are many more factors to concern for to efficient the buildings of Miljonprogrammet. This thesis presents examples of renovations carried out using two of the three renovation systems. The essay presents a reference house of choice on which we apply the three systems and calculate the new U-values, consumption of energy and the investment costs. The new U-values the building is given is matched to the values of recommendation for passive houses. Our reference house is a two story apartment building, located in the village of Lammhult, with brick facades at the ends and plaster at the long sides. One of the long sides contains balconies. The three systems are additional insulation, prefabricated additional insulation and replacement of the facade. We consider which renovation systems are best in different conditions, also considering the treatment of the tenants. The result of the study shows that with additional insulation and prefabricated additional insulation the buildings transmission losses will be major lowered. The investment cost and payoff time for the prefabricated version is much lower. If the standard of passive house is wanted the replacement of facade technique should be used. This method requires that the tenants move out during the renovation work. The investment cost for this method is significantly higher but the payoff time is equal with the additional insulation methods payoff time     .
2

Alternativa byggsystem för att minska transmissionsförlusterna på miljonprogrammets byggnader / Alternative renovation systems to reduce the transmissionlosses on buildings from 1965-1975

Andersson, Magnus, Cederholm, Anders January 2009 (has links)
<p><p><p>The purpose with this project is to explore and verify three renovating systems for Miljonprogrammet (common expression for</p><p>buildings constructed during the years 1965-1975 when over a million houses where built in Sweden) to take measure to the</p><p>largely transmission losses of these buildings. Many of the buildings from this period have similar constructions and therefore</p><p>the same techniques can be used to renovate several of them. This project only considers the climate scale, although there</p><p>are many more factors to concern for to efficient the buildings of Miljonprogrammet.</p><p>This thesis presents examples of renovations carried out using two of the three renovation systems.</p><p>The essay presents a reference house of choice on which we apply the three systems and calculate the new U-values,</p><p>consumption of energy and the investment costs. The new U-values the building is given is matched to the values of</p><p>recommendation for passive houses. Our reference house is a two story apartment building, located in the village of</p><p>Lammhult, with brick facades at the ends and plaster at the long sides. One of the long sides contains balconies. The three</p><p>systems are additional insulation, prefabricated additional insulation and replacement of the facade. We consider which</p><p>renovation systems are best in different conditions, also considering the treatment of the tenants.</p><p>The result of the study shows that with additional insulation and prefabricated additional insulation the buildings transmission</p><p>losses will be major lowered. The investment cost and payoff time for the prefabricated version is much lower. If the standard</p><p>of passive house is wanted the replacement of facade technique should be used. This method requires that the tenants move</p><p>out during the renovation work. The investment cost for this method is significantly higher but the payoff time is equal with the</p><p>additional insulation methods payoff time</p><p> </p><p> </p><p>.</p></p></p>

Page generated in 0.0305 seconds