Spelling suggestions: "subject:"dew building"" "subject:"cew building""
251 |
Energeticky efektivní řadový rodinný dům / Energy efficient terraced houseKrál, Jakub January 2015 (has links)
The aim of my diploma thesis is a design of a new energy efficient terraced house in the gap site. Building has two dwelling unit of category 4+kitchenette and 6+ kitchenette. Building has a cellar, two floors and an attic. The cellar structures and horizontal structures are made of reinforced concrete. Sand-lime bricks are used for masonry. The building is covered with gabled roof with timber roof truss. In this building there are used rainwater and renewable energy in a form of electrical energy made by photovoltaic panels.
|
252 |
Polyfunkční dům / Multifunctional BuildingPoledňák, Jiří January 2015 (has links)
This diploma thesis deals with construction of new mixed-used building in Kuřim at Blanenská street. The relevant estate lies on bulding plot number 2994/27. There aren’t existing buildings. When the proposition for the bulding was being drafted, an extra focus was placed on use of public zone of building. The proposed capacity of bulding consists of 10 living units, with its own internal parking places and basement cells. The mixed-used building has five live floors, there are one underground floor and four above-ground floors. The underground floor is used as parking zone and there are basement cells. The first above-ground floor is used for comercial purposes as a shopping center for public, with its own parking zone. Other above-ground floors are used for living purposes. Living area and public area are separated.
|
253 |
Bytový dům / Block of flatsČerná, Hana January 2015 (has links)
Abstract This diploma thesis deals with the design documentation of a block of flats. The block of flats is supposed to be situated in South Moravia, Znojmo district, in Olbramovice village, cadastral area no. 709930 – Olbramovice u Moravskeho Krumlova. The building is designed as a brick building with a contact thermal insulation system. Vertical constructions are designed from the Porotherm structural system. Horizontal constructions are designed as reinforced concrete structure. Foundation structures are designed from concrete. The object is roofed with a warm flat roof. The object has four floors. On the ground floor is technical hinterland and also one flat is designed to be barrier-free. The other floors are individual flats. There are ten flats in the building. Five flats have their own loggia and two flats have terrace. The building is newly built and it has a L-shaped plan.
|
254 |
Polyfunkční dům / Multifunctional BuildingČerný, Karel January 2015 (has links)
This diploma thesis deals with construction of new mixed-used building in Brno at Terezy Novákové street. The relevant estate lies on building plot number 49, which is purposed as building ground. There are existing buidings at relevant estate which will be removed. When the proposition for the building was being drafted, an extra focus was placed on use of public zone of building. The proposed capacity of building consists of 21 living units with its own internal and external parking places. The mixed-used building has five floors, there are one underground floor and four above-ground floors. There are parking zone and technical background of the building in the undergound floor. The first above-ground floor is used for commercial purposes with its own parking zone. Others above-ground floors are used for living purposses. Living area and public area are separated.
|
255 |
Bytový dům / Living houseBouček, Václav January 2015 (has links)
The aim of my master’s thesis is a project of a new apartment building at a level of the documentation for the structure realization. The thesis contains text, drawings and calculation part. The house is designed as a detached house. Residential house is situated in flat terrain. The building is full basement with four above-ground floor. The house has 16 housing units. The construction system is a combined brick. The structural system of the basement part is made up of permanent shuttering. The floors are of brick blocks HELUZ. In the middle of the building is constructed elevator. The ceiling structure is made of prefabricated prestressed panels Spiroll. The roof consists of single-layer flat roof. The thesis also includes thermal and technical expertise and the calculation of the foundation structure.
|
256 |
Viladům v Humpolci - stavebně technologický projekt / Villahouse in Humpolci - building and technological projectBřezina, Vojtěch January 2016 (has links)
The work includes construction of a residential building technological project Villahouse Humpolec. Residential building has five floors with ten housing units. In the first above ground is a garage and workshop with separate entrance. The author discusses the main technological stages of construction, which are processed in the following sections of this paper.
|
257 |
Novostavba technického zázemí DIAMO ve Stráži pod Ralskem - příprava realizace stavby / New building of technical hinterland in Starz pod Ralskem, preparation of realization constructionJůnová, Lucie January 2016 (has links)
The master’s thesis is focused on the construction of new building of technical hinterland DIAMO in Straz pod Ralskem. It is a two-storey building. The building is designed brick with prefab pressed reinforced concrete panels, roofed a flat roof. The work includes technical report, technological regulation for ventilated facade, design a construction site installations, time schedule, control and test plan, itemized budget, fire and safety solutions.
|
258 |
Bytový dům - Brno / Apartment building - BrnoZukal, Zdeněk January 2016 (has links)
The subject of the diploma thesis is to elaborate the design documentation of an apartment house with restaurant. The building is designed in the village of Lipůvka, South-Moravian region, on plot No.: 544/1 and 545/1 – cadastral region Lipůvka. The bulit-up area is 443,3 m2. There are four floors. There is restaurant, one housing unit (for persons with reduced mobility) and utility room in first above-ground floor. Second, third and fourth above-ground floor is for housing. Each of these three floors has three apartments – two apartments 3+k, one apartment 3+1. Entrance to every apartment is from main staircase. The building is based on the foundation walls of concrete C20/25, all vertical walls are from Porotherm System. Celings are composed of ceramic-conrete beams POT, ceramic insertion Miako and concrete. The staircase is monolithic reinforced concrete. The building is without basement, roofed by a warm flat roof.
|
259 |
Planetárium / PlanetariumChytil, Lukáš January 2016 (has links)
This diploma thesis focuses on a project of new building of Planetarium in Prostějov in Olomouc district. The project is in accordance eith official assignment and with contemporary Czech standards and legislation. Building is placed to biggest park of Prostějov, next to the centre of city on an empty plot owned by city. Object should serve to the people as a cultural centre. The building plan is irregullarly-sharped with maximum dimensions 47,6 x 26,6 m and has three floors. On the first floor is galery, literature store and cafe and on the second floor is projection room and observatory. Structural systém is skelet and walls from reiforced concrete. Foundations of the building are made of concrete strip foundation and reiforced concrete square footings and strip foundations. Ceilings are made of reiforced concrete panels. There are roofs made by steel cupolas. Unsound walls are made of porous fittings. All external walls and cupolas are insulated with mineral wool. Doors and windows have aluminium frame and triple glazing, inner doors are wooden. As result there’s structurally, operationally and aesthetically functional complex, that will be benefit for the city and its citizens, especially for their cultural life.
|
260 |
Bytový dům / Residential BuildingEgermaier, Václav January 2017 (has links)
This thesis summarizes my work on a new apartment building in Slovany, neighbourhood in Pilsen. My primary responsibility was to develop documentation for the project´s design and implementation. The building consists of four floors above ground, an underground floor and a flat roof. The building´s L-shaped plan, rebound 4th floor above ground and balconies lighten the mass of the building. The structural system of the building combined reinforced concrete system of the underground floor, column system of the 1st up to the 3rd floor above ground and wall system of the 4th floor above ground. The building is designed for six residential units with cellars, two garages, a relaxation room and a gym. The thesis includes the preparatory and study reports, architectural and construction solutions, and fire-safety building and construction site equipment solutions.
|
Page generated in 0.0798 seconds