• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 3
  • Tagged with
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Les identités territoriales à Gatineau, 15 ans après la fusion municipale

Morin, Louis-Philippe January 2017 (has links)
Avant 2002, l’Outaouais urbain était composé de cinq municipalités autonomes. Or, le gouvernement du Québec a imposé la fusion de plusieurs municipalités faisant partie d’agglomérations urbaines en adoptant le projet de loi 170. En Outaouais, les villes d’Aylmer, Buckingham, Gatineau, Hull et Masson-Angers ont été regroupées pour ne former qu’une seule entité, la Ville de Gatineau. Cette recherche a pour objectif de comprendre comment les identités territoriales des citoyens qui ont vécu ce changement ont pu être influencées par la modification de la structure du territoire sur lequel se déroule une grande partie de leurs interactions sociales au quotidien. Les réponses fournies par 152 participants d’Aylmer et de Masson par l’entremise d’une enquête par questionnaire nous ont permis de dresser un portrait intéressant du point de vue des citoyens qui habitent deux secteurs périphériques de la ville de Gatineau. Somme toute, nous avons pu constater que les citoyens qui ont connu la fusion municipale ne s’identifient pas fortement à la nouvelle ville et qu’ils demeurent ancrés à leur ancienne municipalité.
2

Projets des logements à la suite des désastres : analyse du système organisationnel et évaluation de la satisfaction des usagers dans un projet de reconstruction dans la région du Maghreb

Bouraoui, Dhouha 01 1900 (has links)
Plusieurs études ont révélé des problèmes récurrents au niveau de la performance et de la gestion des projets de reconstruction à la suite des catastrophes dans les pays en voie de développement (PEVD). Ces projets doivent faire face à des conditions de vulnérabilité des habitants, engendrées par des facteurs politiques, économiques, sociaux et culturels. Les divers participants - contraints par un accès limité à l’information - sont confrontés à travailler dans un contexte hostile ayant un niveau d’incertitude élevé. Ce niveau d’incertitude augmente les risques du projet de reconstruction, particulièrement le risque d’insatisfaction des usagers. Ce travail vise à mettre en parallèle l’analyse du système organisationnel adopté pour la conduite d’un projet de reconstruction et celle du niveau de satisfaction des usagers. Il émet l’hypothèse suivante: deux facteurs organisationnels influencent largement le niveau de satisfaction de la part des bénéficiaires d’un projet de reconstruction de logements à la suite d’un désastre en PEVD: (i) le niveau de centralisation de la prise de décisions (jumelée au manque d’information) au sein de la Multi-Organisation Temporaire (MOT); et (ii) la capacité de la structure organisationnelle de la MOT d’impliquer la participation active des usagers au niveau de la planification, de la gestion, du financement et du design du projet. Afin d’atteindre cet objectif, une recherche empirique fut menée pour analyser le cas des inondations ayant eu lieu en 2003 dans une ville dans la région du Maghreb. Le niveau de satisfaction des usagers a été déterminé grâce à des indicateurs de transfert de technologie qui se basent sur l’analyse du « Cadre Logique » - une méthode d’évaluation largement utilisée dans le domaine du développement international. Les résultats de la recherche ne visent pas à identifier une relation de cause à effet entre les deux variables étudiées (la structure organisationnelle et la satisfaction des usagers). Cependant, ils mettent en évidence certains principes du montage et de la gestion des projets qui peuvent être mis en place pour l’amélioration des pratiques de reconstruction. / Construction projects are temporary endeavors with a defined beginning and end, conducted by a temporary and multi-disciplinary team called a Temporary Multi-Organization (TMO). In the hostile environment of post-disaster reconstruction, participants of the TMO must confront high levels of uncertainty which increases project risks. The non-acceptability of project outcomes is one of the most frequent risks reported in literature (UNDRO, 1982; Barenstein, 2008; Dikmen, 2006). Acceptability is related with users’ satisfaction. However, according to the theory of bounded rationality, actors of the TMO - confronted with limited information and resources - cannot achieve an optimal solution. Instead, both project actors and end-users accept a «satisficing» [SIC] solution (Simon, 2004). This study hypothesizes that two organizational factors have an important influence on user satisfaction in post-disaster housing projects: (i) centralized decision making (coupled with lack of information); and (ii) the capacity of the structure of the Temporary Multi-Organization (TMO) to take into account the active participation of users in project planning, management, financing and design. A case study of a post-disaster housing project in the Maghreb region helps us validate this hypothesis. Building up on this hypothesis, indicators of technology transfer (as proposed by the Logical Framework Analysis) serve as a basis to assess users’ satisfaction. The research does not establish a cause-effect relationship between the two variables of the study. However, the analysis of the structure of the TMO and users’ satisfaction highlight several principles, related with the project initiation and management, that can be implemented to improve reconstruction practices in developing countries.
3

Projets des logements à la suite des désastres : analyse du système organisationnel et évaluation de la satisfaction des usagers dans un projet de reconstruction dans la région du Maghreb

Bouraoui, Dhouha 01 1900 (has links)
Plusieurs études ont révélé des problèmes récurrents au niveau de la performance et de la gestion des projets de reconstruction à la suite des catastrophes dans les pays en voie de développement (PEVD). Ces projets doivent faire face à des conditions de vulnérabilité des habitants, engendrées par des facteurs politiques, économiques, sociaux et culturels. Les divers participants - contraints par un accès limité à l’information - sont confrontés à travailler dans un contexte hostile ayant un niveau d’incertitude élevé. Ce niveau d’incertitude augmente les risques du projet de reconstruction, particulièrement le risque d’insatisfaction des usagers. Ce travail vise à mettre en parallèle l’analyse du système organisationnel adopté pour la conduite d’un projet de reconstruction et celle du niveau de satisfaction des usagers. Il émet l’hypothèse suivante: deux facteurs organisationnels influencent largement le niveau de satisfaction de la part des bénéficiaires d’un projet de reconstruction de logements à la suite d’un désastre en PEVD: (i) le niveau de centralisation de la prise de décisions (jumelée au manque d’information) au sein de la Multi-Organisation Temporaire (MOT); et (ii) la capacité de la structure organisationnelle de la MOT d’impliquer la participation active des usagers au niveau de la planification, de la gestion, du financement et du design du projet. Afin d’atteindre cet objectif, une recherche empirique fut menée pour analyser le cas des inondations ayant eu lieu en 2003 dans une ville dans la région du Maghreb. Le niveau de satisfaction des usagers a été déterminé grâce à des indicateurs de transfert de technologie qui se basent sur l’analyse du « Cadre Logique » - une méthode d’évaluation largement utilisée dans le domaine du développement international. Les résultats de la recherche ne visent pas à identifier une relation de cause à effet entre les deux variables étudiées (la structure organisationnelle et la satisfaction des usagers). Cependant, ils mettent en évidence certains principes du montage et de la gestion des projets qui peuvent être mis en place pour l’amélioration des pratiques de reconstruction. / Construction projects are temporary endeavors with a defined beginning and end, conducted by a temporary and multi-disciplinary team called a Temporary Multi-Organization (TMO). In the hostile environment of post-disaster reconstruction, participants of the TMO must confront high levels of uncertainty which increases project risks. The non-acceptability of project outcomes is one of the most frequent risks reported in literature (UNDRO, 1982; Barenstein, 2008; Dikmen, 2006). Acceptability is related with users’ satisfaction. However, according to the theory of bounded rationality, actors of the TMO - confronted with limited information and resources - cannot achieve an optimal solution. Instead, both project actors and end-users accept a «satisficing» [SIC] solution (Simon, 2004). This study hypothesizes that two organizational factors have an important influence on user satisfaction in post-disaster housing projects: (i) centralized decision making (coupled with lack of information); and (ii) the capacity of the structure of the Temporary Multi-Organization (TMO) to take into account the active participation of users in project planning, management, financing and design. A case study of a post-disaster housing project in the Maghreb region helps us validate this hypothesis. Building up on this hypothesis, indicators of technology transfer (as proposed by the Logical Framework Analysis) serve as a basis to assess users’ satisfaction. The research does not establish a cause-effect relationship between the two variables of the study. However, the analysis of the structure of the TMO and users’ satisfaction highlight several principles, related with the project initiation and management, that can be implemented to improve reconstruction practices in developing countries.

Page generated in 0.1303 seconds