• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 110
  • 14
  • 12
  • 11
  • 4
  • 3
  • 2
  • 1
  • 1
  • 1
  • Tagged with
  • 163
  • 163
  • 93
  • 92
  • 50
  • 42
  • 36
  • 35
  • 35
  • 32
  • 29
  • 27
  • 26
  • 22
  • 21
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
131

Administrativní centrum / Office Centre

Robotka, David January 2018 (has links)
This diploma thesis deals with design of steel structure with composite steel-concrete floor structure of a office building.The building is located in Moravský Krumlov. The Office buidling consist of multi-storey building and an entrance atrium. The total ground plan's dimensions are 52,8m x 48,0m. The multi-storey building has 8 floor. The maximum heigh of the building is 25,32m above ground. The project is designed in two options. For winning variant is including check and it is performed a drawings with design and check assembly details and anchorage.
132

Hala pro kovovýrobu s administrativní budovou / Hall for Metal Production with Administrative Building

Kaňok, Vojtěch January 2019 (has links)
This diploma thesis deals with the design of a metalworking shed with its adjacent administrative center. Both objects are statically independent. The buildings are located in the town of Bučovice. The dimensions of the shed are 54,78x72,58 m. There is an overhead crane situated in the middle wing. The shed‘s height is +11,62 m. The administrative building has L-shaped plan. Its dimensions are 27,62x8,13 m (the wider part is 15,63 m). The design of the administrative object has two variants. Both variants have composite steel-concrete ceiling structure. The heights of the objects are +11,20 m (A variant) and +18,20 m (B variant). For the A variant, drawings were also drawn up with the design and assessment of structural details and anchoring.
133

Sídlo firmy Dlabaja a.s. / Corporate headquarters Dlabaja a.s.

Dlabaja, Adam January 2019 (has links)
The project documentation, processed in the framework of the diploma thesis, solves the new building of the administrative building of the building company in the village Lukov u Moravských Budějovic. The building is made of traditional brick technology therm tl. 50 cm, without insulation, ceilings are reinforced concrete, flat roof, vegetation. Vegetation is also part of the facade of the building, which at the same time serves as a root cleaner. The philosophy of the whole design is to create a high-quality working environment for building company employees, a pleasant environment for customers and to best solve the environmental footprint of the building. The building is designed as a modern office building, with space for leisure activities of staff and their visits, taking into account the responsible approach to the development industrial site and the surrounding nature. The building efficiently manages potable, rain and wastewater, the envelope of the building, and the individual structures are designed to make the entire building as energy-consuming as possible, and do not pump irreparably by nature its natural resources in a larger quantity than necessary.
134

Vybrané části stavebně technologického projektu administrativní budovy s halou v Brně / Selected Parts of Construction Technology Project of an Office Building with a Hall in Brno

Bakyta, Marián January 2020 (has links)
This diploma thesis deals with selected parts of the construction technology project of an office building with a hall in Brno. The thesis contains a technical report, the coordination situation of the construction, the time and financial plan, the study of the main technological stages, the project of site equipment, the design of the main building machines and mechanisms, the time schedule, the budget, the technology prescription of flat single-roof, the quality control and test plan, the assessment of lifting mechanism selection and the design of rainwater capture for further use.
135

Stavebně technologický projekt přípravy a realizace administrativní budovy firmy TREFAL, spol. s r.o. / Construction project for Implementation of Administrative Building of TREFAL, spol. s r.o.

Bočková, Andrea January 2020 (has links)
The aim of this thesis is the development project of the firm TREFAL, Spol. s.r.o. The object SOO2 - Administrative building - that is a constituent of the area of TREFAL, Spol. s.r.o. is discussed topic of this thesis. The main focus is the construction development of the monolithic supporting construction objects. The thesis further depicts and investigates accompanying and overall technical report, an implementation study of the main technological stages, situational designs, a solution of the broader traffic relations including a proposal for the supplementation of the construction development, BOZP plan, budget and timeline, a proposal for the new local communication and following textual and design documentation according to the thesis assignments.
136

Stavebně technologický projekt výrobní haly v Bystřici nad Pernštejnem / Construction-technological project of the production hall in Bystřice nad Pernštejnem

Fňukal, Radek January 2020 (has links)
This diploma thesis is dealing with a construction-technological project of a production hall in Bystřice nad Pernštejnem. The main subject of the thesis is a technological report, a realization study of the main technological phases, a coordination situation of the construction with broader relations to transport routes, a project of the office building site equipment, a suggested list of the main construction vehicles, a time plan for the main building objects, technological prescriptions for a prefabricated skeleton and bored piles and documents related to this.
137

Administrativní budova / Office building

Janková, Denisa Anna January 2020 (has links)
This master thesis elaborates the project documentation for the construction of an office building in Krnov city, located in the Moravian-Silesian region. The office building has four utility above-ground floors and one underground floors serving as underground garages. There is a cafe, stationery, showrooms and office space with sanitary facilities. The construction system is designed as a monolithic reinforced concrete skeleton. Vertical infill constructions are made of brick technology from Porotherm ceramic blocks. The ceiling structures are made of filigree panels with hidden steel girders, which are embedded with concrete layer. The basement and the basic structure of the house is designed as a white tub. The building is covered with vegetation roof. The design emphasized increased comfort in use and the overall modern concept of an office building. Overall, the building is designed to the required values for a near zero energy building.
138

Facelift EDU / Facelift PDU

Růžičková, Tereza January 2020 (has links)
The theme of the diploma thesis is the solution of the pre-plant zone of the Dukovany nuclear power station. Creating a vision of how this space could develop further in the next 50 years and how it could work in a transitional phase during the construction of a new nuclear power plant unit. The subject of the thesis is the elaboration of an architectural study, which is based on an urban study. Urban study was processed within the framework of the pre-diploma thesis and solved mainly the overall problems of this area, the new transport connection, and the functional division of the whole area. The area was divided into three functional units, namely the transport zone, the administrative zone and the sports and education zone. At present, there are a lot of small structurally and functionally unsuitable buildings in this area. The diploma thesis deals with the design of new buildings with a clear functional use in the administrative zone, in the area in front of the main gatehouse. A new representative square was created, and three buildings are designed around it. The dominant feature of the whole area was a high-rise office building near the gatehouse. In front of the office building, towards the main road, the service building I was designed, which contains business and healthcare services. On the other side of the square was located the service building II, where there are technical services, such as workshops, warehouses and metrology. The last building solved within the diploma thesis is the building of sports and locker rooms of suppliers, which is designed behind the square near the greenery. New building copies mass of the only preserved building in this area, namely the building of the information centre. The designed building has a fitness centre and locker rooms of external workers of the power plant.
139

Administrativní budova / Office Building

Světlík, Adam Unknown Date (has links)
The subject of diploma thesis is the elaboration of project documentation of an office building in the northern part of the city of Brno-Medlánky. The office building is designed as a four-storey, without basement. The roofs are flat, and the facade is designed as a glazed curtain wall. The operation of the office building is divided into an administrative part, a commercial part and a cafe. The individual operations do not intersect. Next to the building is a parking lot for customers and employees. The structural system of the building is RC frame with reinforced concrete walls. The internal walls are made of aerated concrete and acoustic lime-sand blocks. The partitions are precast plasterboard. The ceilings are cast-in-place reinforced concrete slabs. The floors are heavy floating with hot water underfloor heating. Most of the flat roofs are green. The drawing part was processed in Revit and AutoCAD.
140

Administrativní budova Brno-Bystrc / Office building Brno-Bystrc

Dokulil, Martin January 2014 (has links)
The master´s thesis deals with a project documentation of a office building with fitness center in Brno-Bystrc. The object is designed as a detached building with four floors and with one basement. Floor plan of the building is regular, staffed by sloping terrain. In basement is situated underground garage and technical rooms of building. In the first floor is fitness center and garage for a customers. In other floors are office spaces for private company. Above the roof is a engine rooms of ventilation. The structural system is reinforced concrete skeleton, facade is designed as a curtain walling. The object is covered with a flat roof.

Page generated in 0.0564 seconds