• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 41
  • 3
  • 2
  • 2
  • 1
  • 1
  • Tagged with
  • 50
  • 50
  • 50
  • 39
  • 35
  • 24
  • 21
  • 14
  • 12
  • 12
  • 12
  • 9
  • 9
  • 8
  • 8
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Projekt výstavby fotovoltaickej elektrárne / Project of the construction photovoltaic power plant

Mačugová, Radana January 2010 (has links)
The objective of this thesis is to analyze and evaluate the profitability of photovoltaic power plant construction project. The introductory part deals with general characteristics of solar energy and its utilization, with the Slovakian and the European legislation in connection with use of renewable energy resources. The practical part deals with solar energy from the perspective of private firm. One particular company is considering about the implementation of photovoltaic power plant. This section begins with the presentation of the private company and evaluation of its preconditions for this planned construction. The thesis also describes planned implementation of the project, namely its preparation, possibilities of obtaining funds, necessary communication with the public agencies, selection of technology and the construction itself. At the end is project evaluated from the point of profitability by selected indicators.
2

Vybudování a provoz fotovoltaické elektrárny / Installation and operation of photovoltaic power plant

MERTLÍKOVÁ, Petra January 2012 (has links)
In my dissertation I describe the photovoltaic power plant on the roof a family house, the conditions of connection to the electricity network, the electricity consumption and I state in detail the technical specifications of this solution. Moreover, I give details of price quotation plus estimated quantity of produced electric power. Besides, I pay attention to the investment efficiency. Main part of the dissertation is devoted to the analysis of produced electric power for the period from 1.1.2010 till 31.12.2010 for each quater of the year seperately. The above mentioned study implies that the photovoltaic power plant meets in so far all requirements and the investment should be returned in approximately 9 years. The aim of the dissertation is to judge the photovoltaic power plant with respect to its installation, operation and return on investment.
3

Hodnocení investičního projektu - výstavba fotovoltaické elektrárny / Investment evaluation - Building of photovoltaic power plant

Kosinová, Michaela January 2008 (has links)
The thesis deals with the following question: 1. What are the renewable resources? 2. Types of renewable resource. 3. European Union approach to renewable resources: targets 4. Czech Republic approach to renewable resources: targets 5. Investment evaluation: Photovoltaic power plant.
4

Manažerský model investičního projektu fotovoltaické elektrárny pro mezinárodní praxi / The Managerial model of an investment project of a PV Plant for international corporate profession

Skopal, Pavel January 2010 (has links)
The implementation of photovoltaic power plants is the result of the collaboration between developers, investors, financing institutions, municipalities and general contractors. Investors make informed decisions based on expert evaluations of financial and nonfinancial criteria of projects. The investor provides equity capital for the project and the bank provides a loan usually in the amount of 70-80% of the total investment cost. The investor looks for the optimal solution for his investment and for the preparation and implementation of the project. To achieve this the investor needs to have a very good understanding of the country specifics where the project is located. During the construction works, outside bodies are part of the undertaking, especially law firms, expert technical supervisors and risk managers. The completed project is then valued using industry-standard methods and it becomes part of the investor's portfolio. New knowledge acquired during the development process is managed and applied to other projects.
5

Studie proveditelnosti / Feasibility study

Hybrant, Tomáš January 2013 (has links)
This feasibility study examines the return on investment in the construction of photovoltaic power plant for family house following a legislation change in 2014.
6

Energetické zásobování areálu Technická 2 / Energy supply of the complex Technicka 2

Buráň, Petr January 2017 (has links)
The theme of this master thesis is „Energy supply to the site Technická 2“. This thesis is divided into several parts. First we will get in touch with concept of combined heat and power and also with principle of photovoltaic electricity production. We will continue with description of site before and after reconstruction. Then we will follow with analyze the effect of reconstruction on energy consumption. In the end we will make some suggestions for using the local source of heat and electricity in Faculty of mechanical engineering, Brno university of technology. All suggestions will be analyzed from energy and economic point of view.
7

Hodnocení fotovoltaické elektrárny ve firemním areálu / Evaluation of photovoltaic power system in the company area

Novák, Petr January 2020 (has links)
The diploma thesis is focused on the evaluation of a photovoltaic power plant in the company premises. The first chapters briefly discuss the theory of electricity generation using photovoltaic panels. It describes the principle of operation of photovoltaic panels, history, production, etc. In the practical part of the thesis we focus on the evaluation of the company's photovoltaic power plant when comparing real data with simulations.
8

Možnosti likvidace a recyklace fotovoltaických panelů v ČR / Aspects of the disposal and recykling of photovoltaic panels in CR

Papírek, Jan January 2020 (has links)
This diploma thesis is focused on the assessment of the possibilities of disposal of photovoltaic panels installed in the Czech Republic. In addition to the basic theory of photovoltaic cells and panels, the theoretical parts describe legislation, subsidies in the field of photovoltaics and the development of photovoltaics in the Czech Republic. As part of recycling, their methods, work with the collective system, as well as the impact on the environment are analyzed. In the experimental part, using the data of the installed capacity and the average weights of the panels, various projections of the disposal of the panels over time are made, which take into account factors such as the life of the power plant or the capacity of the recycling line. Furthermore, according to the available literature, an analysis of the revenue from the sale of recycled materials contained in panels installed in our territory is performed. Subsequently, the needs of future implementers of proven estimates of labor and logical demands were assessed. Finally, an economic evaluation of the fundamental aspects of the FRELP recycling process was performed and the net prices of different recycling directions were determined.
9

Model pro krátkodobou predikci výroby elektrické energie z fotovoltaických zdrojů / Model for short-term forecasting of photovoltaic energy production

Kotlorz, Lukáš January 2017 (has links)
Nowadays, electricity production from photovoltaics power plants is becoming important increasingly. In order to set production to other power plants, it is necessary to predict the generation of electricity from these sources. The thesis is mainly devoted to models for short-term prediction, which is based on weather forecast. The models were designated by beta regression and linear regression with transformed explanatory variable. One part of thesis is devoted to Clear sky model, which is used to estimated the maximum possible production at given hour. 1
10

Řízení fondu alternativních aktiv / Management of the fund of alternative assets

Sobotka, Jan January 2014 (has links)
This thesis deals with the management of the fund of alternative investments with an emphasis on photovoltaic projects in the Czech Republic. The main objective is to evaluate whether, after numerous legislative changes, these projects continue to be an attractive investment alternative. The impact of legislative changes on the economy and efficiency of the projects were analyzed for fictitious projects using static and dynamic methods of investment evaluation. The analysis showed that if there was knowledge of the additional cost burden resulting from changes in legislation, then none of the evaluated projects would have been implemented. In general, changes have had the most significant impact on projects that initially appeared to be most effective. In terms of size, restrictions affected mainly smaller projects. Overall, there was a relative alignment of return. For projects with higher levels of debt, an additional cost burden could be liquidational. Then the portfolio of alternative investment fund was created, which consists of assets of two alternative projects evaluated before. This led to evaluation, whether, despite charged fees but a lower tax rate, the investment through the fund is more favorable compared to an own special purpose company. Due to the small size of the fund the hypothesis of fund being more effective mean of administration, was not confirmed.

Page generated in 0.034 seconds