Spelling suggestions: "subject:"bplanning byenvironment"" "subject:"bplanning 3denvironment""
1 |
The impact of outsourcing on the planning environment and planning method of a company which manufactures high complex productsKoschitzki, Fabian, Öller, Dietmar, Santel, Hauke-Christoph January 2007 (has links)
<p>Today outsourcing is a widely-used method for companies to face the problem of a more and</p><p>more competitive business world. Especially offshore outsourcing to a distant country, where</p><p>the labour costs are comparatively low, is quite popular in the media. Nevertheless, a lot of</p><p>companies fail in accomplishing the high gains they hoped for. One reason for this is the</p><p>miscalculation of the effects of outsourcing on the company which leads to a wrong</p><p>behaviour of the management during the outsourcing process. Hence, a better</p><p>understanding of the impact of outsourcing is crucial for the success of a company. To</p><p>improve this, one way is to analyse the planning environment and the resulting planning</p><p>method of a company before and after outsourcing.</p>
|
2 |
The impact of outsourcing on the planning environment and planning method of a company which manufactures high complex productsKoschitzki, Fabian, Öller, Dietmar, Santel, Hauke-Christoph January 2007 (has links)
Today outsourcing is a widely-used method for companies to face the problem of a more and more competitive business world. Especially offshore outsourcing to a distant country, where the labour costs are comparatively low, is quite popular in the media. Nevertheless, a lot of companies fail in accomplishing the high gains they hoped for. One reason for this is the miscalculation of the effects of outsourcing on the company which leads to a wrong behaviour of the management during the outsourcing process. Hence, a better understanding of the impact of outsourcing is crucial for the success of a company. To improve this, one way is to analyse the planning environment and the resulting planning method of a company before and after outsourcing.
|
3 |
Análise dos impactos ambientais relacionados às perdas de água em rede de distribuição: estudo de caso em Olinda/PESOUZA, Deyvison Luiz Andrade de 29 August 2016 (has links)
Submitted by Rafael Santana (rafael.silvasantana@ufpe.br) on 2017-04-19T17:18:49Z
No. of bitstreams: 2
license_rdf: 1232 bytes, checksum: 66e71c371cc565284e70f40736c94386 (MD5)
Dissertação - Deyvison Luiz Andrade de Souza.pdf: 1797490 bytes, checksum: dd69b095d85d38d5a66e8608dc2e5d6c (MD5) / Made available in DSpace on 2017-04-19T17:18:49Z (GMT). No. of bitstreams: 2
license_rdf: 1232 bytes, checksum: 66e71c371cc565284e70f40736c94386 (MD5)
Dissertação - Deyvison Luiz Andrade de Souza.pdf: 1797490 bytes, checksum: dd69b095d85d38d5a66e8608dc2e5d6c (MD5)
Previous issue date: 2016-08-29 / O sistema responsável por fornecer água tratada na cidade de Olinda/PE é o sistema Botafogo.
Iniciado em 1986, o sistema utiliza captação de mananciais hídricos subterrâneos e
superficiais para produzir aproximadamente 17% do volume distribuído de água na Região
Metropolitana do Recife. Devido à falta de manutenção e estrutura antiga do sistema
Botafogo, há uma grande perda de volume de água, gerando problemas como falta de água
para a população, perdas financeiras para a Companhia Pernambucana de Saneamento e,
principalmente, impactos negativos ao meio ambiente. O presente trabalho aborda os
principais impactos ambientais ocasionados por perdas de água em rede de distribuição, no
período de novembro de 2014 a outubro de 2015 e propõe a aplicação de uma metodologia de
estruturação de problemas, SSM (Soft Systems Methodology) para apontar possíveis ações de
redução dos impactos ambientais analisados. Os dados de índices de perdas por distribuição
utilizados neste trabalho foram disponibilizados pela Companhia Pernambucana de
Saneamento. / The responsible system for providing treated water in the city of Olinda / PE is the Botafogo
system. Started in 1986, the system uses capture of underground and surface water sources to
produce approximately 17% of the distributed water volume in the Metropolitan Region of
Recife. Due to lack of maintenance and former Botafogo system structure, there is a large loss
of water volume, causing problems such as lack of water for the population, financial losses
for the Pernambuco Sanitation Company (Compesa) and mainly negative impacts to the
environment. This work addresses the main environmental impacts caused by loss of water
distribution network in the period from November 2014 to October 2015 and proposes to
apply a problem-structuring methodology, SSM (Soft Systems Methodology) to identify
possible actions of reduction of environmental impacts analyzed. Rates of data loss by
distribution used in this study were provided by the Pernambuco Sanitation Company
(COMPESA).
|
4 |
Územní plánování jako nástroj ochrany životního prostředí / Land-use planning as a tool for environmental protectionTichá, Anděla January 2011 (has links)
My thesis deals with town and country planning as a tool for environmental protection. It is necessary to take into consideration the environment impacts by procurement and issuing the planning documents and to make available tools to protect the environment in this process. The second chapter defines the term town and country planning and describes its objectives and tasks. I described the history of legislation and focused on the principles of the current legislation. The last part of this chapter considers with the powers in town and country planning activities. The third chapter contains the characteristics of individual tools of town and country planning and process of procurement and issuing of these documents. It includes the planning materials, the spatial development policy as a statewide conception, spatial development principles issued on regional level, local plan as a basic instrument determining conception of municipality development and protection of its values and the regulatory plan. I also described individual kinds of planning permissions and planning provisions. The fourth chapter deals with the review of these documents. Fifth, sixth and sevenths chapter I rate as the main part of my thesis. It considers with the connections between the town and country planning process and the...
|
Page generated in 0.1165 seconds