Vliv optimalizace uspořádání montážních pracovišť na ekonomické, logistické a procesní parametry výrobního systému ve firmě Automotive Lighting / Optimal layout of assembly workplaces and its effect on economical, logistic and procedural parameters of the manufacturing systems at an Automotive Lighting companyProcházka, Jan January 2013 (has links)
The master thesis deals with layout optimizing of pre-assembly workplaces in company Automotive Lighting Jihlava. Identification of actual status and analysis of defects was provided. Based of this investigation two versions of future ordering were compared. One of them was chosen by multi-criterion evaluation and detail plan was plotted. Ergonomic analysis by software simulation and economic balance were done too.
|
2 |
Investigating the barriers to increase Levels of Automation. : A case study in pre-assembly of tap changer assembly line.MEHTA, ADVAIT, Subramanian, Mahalingam January 2019 (has links)
The overarching goal of this thesis is to investigate and explore the barriers that a company would face while increasing the Levels of Automation (LoA), in the preassembly production unit. To achieve the primary goal of investigating the barriers this study takes a threefold approach. Firstly, the current LoA was measured for the preassembly workstations. This measurement was conducted by incorporating an existing methodology adapted from the literature review known as DYNAMO++ methodology. This method is incorporated such that, the current LoA of the preassembly workstations could be measured and analysed. The current LoA of the preassembly workstations are analysed to investigate the potential workstations where LoA could be increased, in line with the company’s triggers for implementing automation. For this, experiences of the personnel’s belonging to the operational level of preassembly workstations were incorporated, to find the scope of improvements for increasing the LoA. Additionally, the company’s triggers for implementing automation was investigated from the managerial level. The research questions were answered by adapting an explorative, single case study method. Additionally, four types of data collection techniques were used, such as – interviews, focus groups, observations, and document analysis. Subsequently, source triangulation was adapted to analyse the data collected; to develop a comprehensive understanding of the barriers identified., Finally, the barriers faced by the company to increase LoA are identified by considering the implications that the improvement opportunities would impose upon the production systems environment. The identified barriers were then categorised further based on factors that exist internal as well as external to the production systems environment. The barriers identified in this study highlights various factors that the management must consider beforehand while initiating automation decisions in future automation projects in the preassembly area. Regardless of the barriers faced by the company, there are more opportunities to improve manufacturing processes through automation technologies. This thesis contributes to the knowledge of the factors that restrain the implementation of automation technologies and how companies could deal with it.
|
3 |
Offshore Wind Turbine Transportation & Installation Analyses Planning Optimal Marine Operations for Offshore Wind ProjectsUraz, Emre January 2011 (has links)
Transportation and installation of offshore wind turbines (Tower, Nacelle and Rotor) is a complete process conducted over several phases, usually in sequence. There are several factors that can turn this process into a challenge. These factors can either be due to offshore site conditions or the technical limitations of the installation vessels. Each project has its own characteristic parameters and requires a unique optimum solution. This paper identifies the dynamics of the installation process and analyzes the effects of each phase on the progression of events.The challenges in wind turbine installations due to offshore environment were investigated, the effects of each were explained and their significances were stressed. Special installation vessels were examined and their technical specifications were analyzed in terms of working conditions, dimensions, service performances, and crane capacities as well as projecting future design trends. Several offshore wind farm projects were analyzed; their installation methods were specified, and compared to each other to determine advantages and disadvantages of different pre-assembly concepts. The durations of the sub-phases of the process were defined in terms of different variables such as site conditions and individual vessel performance. These definitions were used for making time estimations, and conducting further analyses regarding the effects of different site specific parameters on the overall project duration.In conclusion, this study considered the main operation parameters in an offshore wind turbine installation context: the benefits and drawbacks of different pre-assembly methods were researched and evaluated resulting in new knowledge and a productive contribution for optimizing “the offshore turbine transportation and installation process”, based on actual time usage.
|
4 |
Materialstyrningens påverkan på platsutnyttjande och transporter / The impact of material management on space utilization and transportsGustafsson, Viktor, Olsson, Gustav January 2024 (has links)
The purpose of this study was to enhance the understanding of how a production company can improve the transportation and storage of materials that are to be used shortly at the assemblylines, and to provide recommendations for improvements. The empirical section of the study was conducted through interviews and observations. Problems were identified and improvements were suggested. By implementing these improvements suggestions, the company can increase efficiency and reduce transportation needs and gain more free space within the work area. This will enable the company to achieve quicker setups to get a demand- based production, which can strengthen the companies competitiveness in the market.
|