• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Gestão do projeto e sua interface com o canteiro de obras sob a ótica da preparação da execução de obras (PEO) / Design management and its interactions with the construction field under the perspective of the construction preparation and execution (PEO)

Arrotéia, Aline Valverde 26 September 2013 (has links)
Submitted by Jaqueline Silva (jtas29@gmail.com) on 2014-10-06T20:56:54Z No. of bitstreams: 3 Dissertação - Aline Valverde Arrotéia - 2013 (1).pdf: 19845597 bytes, checksum: a0771de1e645df07c152873e59f534e2 (MD5) Dissertação - Aline Valverde Arrotéia - 2013 (2).pdf: 17441990 bytes, checksum: b1f22aee78d803aedac8b5d5827fa31b (MD5) license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5) / Approved for entry into archive by Jaqueline Silva (jtas29@gmail.com) on 2014-10-06T20:57:05Z (GMT) No. of bitstreams: 3 Dissertação - Aline Valverde Arrotéia - 2013 (1).pdf: 19845597 bytes, checksum: a0771de1e645df07c152873e59f534e2 (MD5) Dissertação - Aline Valverde Arrotéia - 2013 (2).pdf: 17441990 bytes, checksum: b1f22aee78d803aedac8b5d5827fa31b (MD5) license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5) / Made available in DSpace on 2014-10-06T20:57:05Z (GMT). No. of bitstreams: 3 Dissertação - Aline Valverde Arrotéia - 2013 (1).pdf: 19845597 bytes, checksum: a0771de1e645df07c152873e59f534e2 (MD5) Dissertação - Aline Valverde Arrotéia - 2013 (2).pdf: 17441990 bytes, checksum: b1f22aee78d803aedac8b5d5827fa31b (MD5) license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5) Previous issue date: 2013-09-26 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior - CAPES / During the last twenty years the construction field in Brazil has evolved significantly in response to its market growing and competitiveness. However this evolving path has faced many obstacles such as cultural barriers and the lack of efforts to achieve quality at the Brazilian construction site. As one of the causes of this facts the lack of integration between construction and the designing process generates waste, pathologies, work redone and improvised changes originated by incompatible projects which were taken by incapacitated personnel at an inconvenient moment. At the same time, the great amount of information generated on the designing or construction phases is lost due to the lack of an effective coordination of these activities. From this scenario Souza (2001), has developed two management methods in her doctorate thesis named Preparation for the Execution of Buildings (known as PEO) and the Pro-active Coordination (known as CPA), these methods are based on the application of the processes adopted by the French construction industry on Brazilian construction sites. These methodologies aim to establish the integration of the project phases by a set of actions and activities implemented by a system of meetings where the main objective is to discuss the projects and the planning of the construction site seeking to obtain a better quality and better outcome on the productive process. These methodologies aim to bring expressive improvements on the productivity, as well as on the lowering of waste, on the settlement of goals, on planning actions in accordance with all the agents involved and mainly on the reduction of costs allied to higher quality standards. Thus is an objective of this research to implement the Preparation on the Execution of Buildings (PEO) seeking to understand the management of the designing process and its interface with the construction site. The methodology applied on the development of the analysis is classified as qualitative and it will be carried by the practical application of the research and the evaluation of its results. Thus, the study was divided into two stages, one of them intended for a pilot study of PEO in Company A, and the other to the implementation of PEO on the company B. This way, the method was developed from a system meetings entitled structured in three different stages: the release of PEO; the development of PEO and the completion of the intensive phase of PEO, which were performed over a period from two to three months. The data analysis was structured upon five main aspects which were evaluated during the implementation of the method on the studied companies. These aspects were: the actions taken during the PEO phase, the development of the actions and the participation of the agents; the internal structure of the companies analyzed; The management and design coordination and the contract form of the contractors, architects and engineers. The results obtained demonstrated the PEO method's effectiveness and viability while a booster on the improvement of project management. Therefore, it can be concluded that the PEO is feasible to be applied in building construction companies, since this method can contribute to the integration of the design phases and construction, as well as to the improvement of the communication between the agents involved in the building construction field. / Nos últimos 20 anos, o setor da construção civil no Brasil evoluiu significativamente em resposta ao crescimento da competitividade no mercado. Entretanto, nesse processo de evolução ainda têm sido encontradas barreiras culturais e organizacionais, e, sobretudo, dificuldades nos esforços à qualidade nos canteiros de obras brasileiros. Aliada a este quadro, a falta de integração entre as atividades de construir e projetar provoca uma série de desperdícios, patologias, retrabalhos e alterações improvisadas decorrentes de projetos não compatibilizados, ora por ausência de detalhes nos projetos, ora por decisões tomadas por pessoas não capacitadas em momentos inadequados. A partir dessa realidade, Souza (2001) desenvolveu dois métodos de gestão nomeados Preparação da Execução de Obras (PEO) e Coordenação Pró-Ativa (CPA) em sua tese de doutoramento, por meio da transposição desses métodos adotados na gestão da interface projeto-execução de obras na França para a realidade dos canteiros de obras brasileiros. Esses métodos visam à integração das etapas de projeto e obra a partir de um conjunto de ações e atividades realizadas por meio de reuniões sistematizadas voltadas à discussão do projeto, ao planejamento e à organização do futuro canteiro de obras, a fim de obter melhor qualidade e desempenho no processo produtivo. Dessa forma, este trabalho tem como objetivo geral implementar o método da preparação da execução de obras (PEO) a fim de avaliar a interface entre a gestão do processo de projeto e a execução do canteiro de obras. A metodologia adotada para o desenvolvimento deste trabalho é classificada como qualitativa, a qual foi realizada por meio de uma pesquisa-ação, e dividida em duas etapas diferentes, sendo uma destinada ao estudo piloto da PEO na empresa A, e a outra à implementação da PEO na empresa B. Deste modo, a aplicação do método foi desenvolvida a partir de um sistema de reuniões em três fases intituladas: lançamento da PEO; desenvolvimento da PEO e finalização da fase intensiva de PEO, as quais foram realizadas em um período entre dois e três meses. A análise de dados foi estruturada a partir de cinco aspectos principais, os quais foram avaliados durante a aplicação do método nas empresas estudadas, sendo eles: quanto às ações desenvolvidas na fase de PEO, quanto ao desenvolvimento das reuniões e a participação dos agentes; quanto à estrutura organizacional e departamental das empresas; quanto à gestão e a coordenação de projetos; e quanto ao formato de contratação dos projetistas e subempreiteiros. Os resultados obtidos com a realização deste trabalho comprovaram a eficácia do método da PEO e a sua viabilidade enquanto potencializador na melhoria da gestão da interface projeto-execução de obras. Portanto, pode-se concluir que a PEO é viável de ser aplicada em empresas de construção e incorporação de edifícios, uma vez que este método pode contribuir para a integração das etapas de projeto e execução, bem como na melhoria da comunicação e na interação entre os agentes envolvidos na produção de edifícios.

Page generated in 0.1354 seconds