• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • 1
  • Tagged with
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Ökad detaljeringsgrad i ByggnadsInformationsModellen : BIM-laboration om virtuell uppregling av gipsväggar som ett sätt att spara resurser / Increased level of detail in the Building Information Model : BIM-laboration on virtually constructed framing for drywalls as a means to save resources

Berggren, Oscar, Lundgren, Emil January 2012 (has links)
Målet med examensarbetet är att svara på frågan: "Är det resurssparande att öka detaljeringsgraden i BIM-modellen genom virtuellt uppreglade gipsväggar?" Rapporten behandlar en BIM-laboration som genomförts i samarbete med NCC i projektet Signalfabriken i Sundbyberg. Med programmet Lindab Revit Tools (LRT) reglades gipsväggar upp virtuellt och adderades till projektets byggnadsinformationsmodell (BIM). Materialet kvalitetssäkrades vid samgranskningsmöten och användes för att generera A3-handlingar för test i produktion. Testet och handlingen diskuterades med representanter från olika delar av byggprocessen och en reviderad handling utvecklades samt godkändes. Laborationen upprepades med syftet att effektivisera processen och erfarenheterna från detta ledde till att frågeställningen fick följande svar: Ja, om endast komplicerade områden modelleras. Ja, för hela modellen om programvaran utvecklas.Nej, om LRT används för att virtuellt regla upp alla gipsväggar i projektet. Förutom dessa svar innehåller rapporten ett förslag på A3-handling som optimerats för användning i produktion. En lista på rekommenderade förändringar i programvaran. En beskrivning av hela processen för ett område där resursåtgången angetts i tid. Denna rapport riktar sig till läsare med byggingenjörsexamen eller motsvarande kunskapsnivå. / This report aims to answer the question: "Can an increased level of detail in the Building Information Model by virtually constructed framing for drywalls save resources?" The report concerns a BIM laboration conducted in collaboration with NCC in the project Signalfabriken in Sundbyberg. Lindab Revit Tools (LRT) was used to virtually construct framing for drywalls that was added to the building information model of the project. The virtual material was subject to clash detection analysis and then used to generate A3-sheets for use in the production line. The result of this test and the quality of the sheet was discussed by representatives from different parts of the construction process. A revised sheet was formed from this discussion and then approved by NCC. The process was repeated to find the most efficient process and the experiences from this led to these answers for the original question: Yes, when only complex areas are modeledYes, if all areas are modeled and LRT is improvedNo, if LRT is used to virtually construct all dry walls in the project Besides these answers the report includes: a suggestion for a sheet optimized for use in the production line, a list of improvements for LRT and a description of the process in full for a curtain area together with the details of how much time resources were spent. This report is directed towards construction engineers and readers with equivalent level of knowledge.
2

Vícepodlažní montovaná konstrukce / Multi-storey precast structure

Polák, Marek January 2016 (has links)
The final thesis is focused on reworking hospital pavilion from cast-in-place structure to precast concrete frame. Calculation of internal forces is made by software system SCIA Engineer. Main load-bearing elements are inner beam, outside beam and all columns in axis 2-C. This thesis contains assembly report, structural design, calculations and drawings of the designed parts, joint details, assembly material drawing and hand calculation.

Page generated in 0.0966 seconds