Analysis of 2009 ENR Best Projects in Texas to Determine the Impact of Project Delivery System UsedRajan, Navaneethan 2010 December 1900 (has links)
Competitive Bidding, Competitive Sealed Proposal, construction management agency, construction management at risk, Design-Build, Design-Build-Bridging, and job order contracting are seven project delivery methods that are commonly used in the state of Texas today. This paper empirically compares the cost, schedule, and change order management performance of these project delivery methods in 2009 Engineering News Record (ENR) Best Construction Projects in Texas, using the data collected from the projects representative of the population. Also information is collected on lessons learned from these projects. The thesis included development of survey instrument, getting approval from Institutional Review Board (IRB), data collection from the industry, statistical analysis and inferences. Based on the data collected, project performances were measured in terms of five identified variables and then plotted in the form of probability distribution curves to understand the characteristics of the target population. Then, the results were grouped into six categories based on project delivery methods used and compared to understand their impacts on these projects. Findings revealed predominant usage of CM at Risk PDM, and better cost and schedule performance of CM at Risk, Design-Build, and Owner customized PDM. Detailed performance metrics, results, interpretations and conclusions are presented.
|
2 |
Analysis of the Texas A&M University System's Construction Project Delivery Method Performance: CMAR and CSPNeidert, Andrew 2012 August 1900 (has links)
In recent decades, the use of construction manager-at-risk (CMAR) has surged as an innovative construction project delivery method in comparison to traditional competitive bid procurement methods. The conceptual pros and cons of the method are widely accepted throughout the construction industry; however, very little quantitative research exists validating such beliefs. The study presented in this technical paper empirically compares the performance of CMAR to that of the more traditional method of competitive sealed proposal (CSP) in the construction of higher educational facilities. In a study of 33 projects constructed by The Texas A&M University System, 19 procured using CMAR and 14 procured using CSP, observed results show a reduction in schedule growth and change order quantity when using CMAR over CSP. However, additional results show that CSP is more apt to result in decreased project and construction costs than CMAR. Business practices of The Texas A&M University System, statistical significance testing of research data, and practical applications of research findings are included.
|
3 |
Investigating the influence of procurement method selection on project performance in LibyaGhadamsi, Alaeddin January 2016 (has links)
Construction Project Procurement Methods (PMs) define the roles, relationships and responsibilities of project team members and the sequence of the activities required to construct or provide a facility. A number of different PMs have evolved over the years, but each is characterised by a different set of features upon which the criteria for selecting the most appropriate method to procure a given project must be based, if successful project performance (PP) is to be ensured. The use of procurement method selection criteria (PMSC) to inform clients’ decision on suitable PMs to adopt remains a recommended good practice in the construction industry. However, project clients in the Libya Construction Industry (LCI), continue to face great challenges when it comes to selecting the most appropriate PM for its projects. The general practice in this industry is largely dominated by a culture of clients’ reliance on their familiarity and experience with a particular method to inform their PM choice, with no consideration of the plethora of other PMs and use of rational approaches to aid in this decision-making. This procurement issue has long been recognised as a major contributory factor to the frequent time and cost overruns often experienced by projects in the LCI. Although the selection of an appropriate PM to procure any given project is known to result in success PP and (and vice versa), very little is known about the nature of this relationship from literature. Having persistently suffered a great deal of project failures over the years, the LCI stands to benefit from detailed knowledge and understanding of how exactly PM choice do actually influence PP. Stimulated by the dearth of this information, this thesis reports on a research investigation into this relationship with the aim of developing a model to explain the criteria functions in contributing to PP and their implications to PM selection practice in Libya. The methodological approach adopted for this research was the mixed method, i.e., using a combination of both quantitative and qualitative approaches. Following a critical review of the extant relevant literature, a number of relevant hypotheses were first formulated, together with a conceptual framework, to establish the theoretical basis underpinning this research, namely the relationship between the selection of PMs (based on PMSC) and PP. The primary data collection stage involved an initial field questionnaire survey aimed at identifying and confirming the key areas of the research inquiry that needs focusing on. This was followed by a semi-structured questionnaire and interview surveys. With the aid of SPSS and Excel, the collected data were analysed, followed by the development of a mathematical model (based on regression) that demonstrate the influence of PMSC on PP. Finally, the model was validated by expert interviews to test for its validity and reliability. The key findings of the research include the identification of DBB and DB selection criteria that contributes to PP. The distinct contribution to knowledge arising from this research includes the development of a regression model to demonstrate this relationship between PMSC and PP. The benefit of these outputs lies not only in the ability of LCI’s clients to make PM selection decisions much faster by virtue of the need for them to only focus on the criteria with significant influence on PP, they are also able to work out, in quantitative terms, the PP outcomes to be expected for each of the method being considered. This latter information would enable clients to compare the PP outcome values expected from their decisions to select DBB and DB, and then be able to conclude which of these two options represents a better procurement strategy for any given project at hand.
|
4 |
An Investigation of Project Delivery Methods Relating to Repetitive Commercial ConstructionPatterson, Donald A. 10 July 2014 (has links) (PDF)
The Design/Bid/Build (DBB) delivery method has historically been the most popular and the most effective means of determining the least cost for building a project based upon a set of construction documents. In recent years, however, other project delivery methods, including but limited to Construction Manager/General Contractor (CM/GC) and Design/Build (DB), have slowly taken a share of the construction market away from the DBB delivery method. The choice of delivery method that will produce the best value for an owner in the measurements of efficiency in quality, cost, and timeliness depends upon the type of project and the business culture of the project owner. A unique opportunity for a comparative study was presented by the Meetinghouse Facilities Department (MFD) of the Church of Jesus Christ of Latter-day Saints. The MFD completed over 200 repetitive meetinghouse projects in the U.S. over a five-year period (1999-2003), contracting approximately two-thirds of the projects using a CM/GC delivery method with an attached partnering agreement. The remaining meetinghouses were contracted using a DBB delivery method. A comprehensive comparison was conducted measuring all of the efficiencies created by the selection of delivery method, including short- and long-term costs, direct and indirect costs, construction cycle time, and quality assessment scores. After identifying and then adjusting for several confounding variables in the historical data, the statistical analysis provided evidence that the CM/GC delivery method proved to be the best value for the MFD by producing a total cost savings of over 5.5 percent on the meetinghouse projects when compared to the DBB meetinghouse projects. Construction cycle time was 20% shorter on the CM/GC meetinghouse projects and quality assessment (QA) scores were consistently higher. In regards to a 10-year life cycle repair costs, the CM/GC delivery method produced a higher quality meetinghouse, reducing repair costs by 34% when compared to the DBB meetinghouse projects.
|
5 |
Supervisión y control de obras de edificación bajo los enfoques de Lean Construction y del PMI / Supervision and control of works in building construction under the Lean Construction and PMI approachesCary Teves, Walter Melvin 17 November 2018 (has links)
El propósito de esta investigación consistió en la realización de una propuesta para la implementación de un sistema de gestión para la apropiada supervisión y control de obras de edificación con base en el trabajo colaborativo. El caso de estudio se basó en la construcción de un hotel en el departamento de Cusco. Para ello fue necesario establecer lineamientos para el desarrollo de la propuesta, luego se describió la metodología de gestión y control utilizado por la supervisión de obra. Se realizó la definición de herramientas de gestión y técnicas de control más convenientes para este propósito.
Esta investigación se fundamenta en que la mayor parte de proyectos de edificación son ejecutados descuidando el tiempo, costo, alcance y calidad establecidos; debido a procedimientos inadecuados de supervisión y control. Por otro lado, las controversias y relaciones adversas que se producen entre la supervisión de obra, constructor y cliente, son aspectos que pueden causar impactos significativos en las variables mencionadas.
Esta propuesta permite que la supervisión de obra pueda efectuar la entrega integrada del proyecto mediante el trabajo colaborativo, utilizando la metodología del Valor Ganado para una adecuada gestión, y aplicando la técnica del Last Planner para el apropiado control y monitoreo del cronograma y de las actividades en ejecución. Finalmente, se concluye que la aplicación de las herramientas y metodologías expuestas, posibilitan a la supervisión de obra gestionar y controlar apropiadamente el alcance, el cronograma, los costos y la correcta ejecución de todos los trabajos que se realizan en obra. / The purpose of this investigation was to make a proposal for the implementation of a management system for the proper supervision and control of works in building construction based on collaborative work. The case study focuses on the construction of a hotel located in the Cusco department. This required the establishment of guidelines for the development of the proposal, and then it was described the management and control methodology used by the site supervisors. The most convenient management tools and control techniques for this purpose were defined.
This research is based on the fact that the majority of building projects are executed neglecting the established time, cost, scope and quality due to inadequate supervision and control procedures. On the other hand, controversies and adverse relationships that occur between supervisors, constructor and owner are aspects that can cause significant impacts on the variables mentioned above.
This proposal allows the site supervisors to carry out the integrated project delivery through collaborative work, using the Earned Value Methodology for proper management, and applying the Last Planner technique for proper control and monitoring of the progress of the production activities and protect the stipulated deadline in the project's general schedule. Finally, it is concluded that the application of the exposed tools and methodologies enable the site supervisors properly manage and control the scope, schedule, costs and the correct execution of all the works that are carried out on site. / Trabajo de investigación
|
6 |
Using Industry Data to Make an Impact on Construction Practices over the Project LifecycleJanuary 2020 (has links)
abstract: The construction industry generates tremendous amounts of data every day. Data can inform practitioners to increase their project performance as well as the quality of the resulting built environment. The data gathered from each stage has unique characteristics, and processing them to the appropriate information is critical. However, it is often difficult to measure the impact of the research across project phases (i.e., planning, design, construction, operation and maintenance, and end-of-life). The goal of this dissertation is to present how industry data can be used to make an impact on construction practices and test a suite of methods to measure the impact of construction research across project phases. The dissertation provides examples of impactful research studies for each project phase to demonstrate the collection and utilization of data generated from each stage and to assess the potential tangible impact on construction industry practices. The completed studies presented both quantitative and qualitative analyses. The first study focuses on the planning phase and provides a practice to improve frond end planning (FEP) implementation by developing the project definition rating index (PDRI) maturity and accuracy total rating system (MATRS). The second study uses earned value management system (EVMS) information from the design and construction phases to support reliable project control and management. The dissertation then provides a third study, this time focusing on the operations phase and comparing the impact of project delivery methods using the international roughness index (IRI). Lastly, the end-of-life or decommissioning phase is tackled through a study that gauges the monetary impact of the circular economy concept applied to reuse construction and demolition (C&D) waste. This dissertation measures the impact of the research according to the knowledge mobilization (KMb) theory, which illustrates the value of the work to the public and to practitioners. / Dissertation/Thesis / Doctoral Dissertation Civil, Environmental and Sustainable Engineering 2020
|