Spelling suggestions: "subject:"5project management maturity model"" "subject:"3kproject management maturity model""
1 |
A maturidade em gerenciamento de projetos e sua contribuição para a seleção de projetos de acordo com a estratégia organizacional. / Project management maturity and its contribution to project selection according to organizational strategy.Pereira, Marcia Moreira Martins 13 September 2007 (has links)
A crescente busca pela utilização do gerenciamento de projetos enquanto diferencial estratégico no mercado atual e, mais recentemente, a procura pelo gerenciamento de projetos formal e estruturado, como parte da estratégia competitiva da organização, associadas à popularização do termo maturidade, justificam o conceito de maturidade em gerenciamento de projetos e a existência dos modelos de maturidade em gerenciamento de projetos. Existem atualmente diversos modelos de maturidade no mercado. A maioria deles está alinhada a um guia de conhecimento, que é utilizado como medida comparativa na avaliação do nível de maturidade da organização, e classifica o estágio de maturidade da organização em cinco níveis. Difere dos demais o modelo Organizational Project Management Maturity Model (OPM3®), proposto pelo Project Management Institute (2003). Ao invés de ser concebido como um modelo de níveis de maturidade, tem como enfoque três elementos (conhecimento, avaliação e melhoria), através dos quais o modelo se auto-atribui a capacidade de vincular projetos à estratégia organizacional. O presente estudo procurou avaliar a contribuição da maturidade em gerenciamento de projetos para a seleção de projetos de acordo com a estratégia organizacional. Quanto ao método de pesquisa, foi utilizado o survey, tendo como fonte de evidência um questionário auto-administrado web-based. A população de interesse do pesquisador foi composta pelas organizações estabelecidas no Brasil que se utilizam do gerenciamento de projetos; a amostra da pesquisa foi constituída de profissionais da área de gerenciamento de projetos da rede de contatos do pesquisador. As 78 respostas válidas obtidas com o survey foram submetidas às análises descritiva e inferencial. Em relação aos resultados obtidos, foi possível comprovar que a utilização do modelo OPM3® para avaliação do nível de maturidade da organização influencia a prática da seleção de projetos relacionados à estratégia organizacional. Não foi possível provar que a prática da seleção de projetos relacionados à estratégia organizacional seja influenciada pela existência de processo de formulação da estratégia ou pelo estágio de maturidade predominante na organização para cada domínio (projeto, programa e portfólio). Em se tratando das limitações do estudo, citam-se a pequena quantidade de empresas brasileiras onde o questionário de Auto-Avaliação proposto pelo OPM3® foi utilizado e a obtenção da visão da organização através da percepção do respondente (em alguns casos as questões exigiam uma resposta subjetiva). Por sua vez, a principal contribuição obtida com a pesquisa refere-se à identificação de elementos facilitadores da seleção de projetos relacionados à estratégia organizacional. Como contribuição secundária, pode ser citada a ampliação da quantidade de pesquisas acadêmicas realizadas com apoio de tecnologia para o recebimento dos dados, neste caso, email e hospedagem na Internet. Outras contribuições referem-se à proposição do modelo teórico para a pesquisa e à realização da pesquisa de campo em si, esta última permitindo a obtenção de dados sobre empresas nacionais no que tange ao gerenciamento de projetos e à utilização do modelo OPM3® para avaliação do nível de maturidade. / The increasing use of project management as strategic differential in our market and, most recently, the search of formal and structured project management, as part of organizational competitive strategy, in association with the maturity concept popularization, justify the concept of project management maturity and the existence of project management maturity models. There are many maturity models at the market. Most of them are aligned with a project management body of knowledge, used as reference to the organizational maturity level evaluation, and classify the organizational maturity stage into five linear levels. The Organizational Project Management Maturity Model (OPM3®), developed under the stewardship of the Project Management Institute (2003), is different. Instead of being designed as a system of levels of maturity, it focuses on three basic elements (knowledge, assessment and improvement), through which the model assigns itself the capability of join organizational strategy and projects. This study aimed to evaluate the contribution of project management maturity into bridging strategy and individual projects. The research method used was the survey, and the measurement instrument was a web-based self-assessment questionnaire. The population frame was composed by Brazilian organizations that use project management; the research sample was composed by researcher networking professionals used to work at project management area. The 78 valid responses obtained through survey were analyzed by descriptive and statistical inference. Regarding the results, it was possible to prove that OPM3® model application in order to assess organizational maturity level acts on the project selection according to organizational strategy. It was not possible to prove that project selection according to organizational strategy depends on the formulation process of the strategy or the organizational maturity stage for each domain (project, program and portfolio). Among the study limitations, there was the small quantity of Brazilian companies that had used Self-Assessment tool provided in OPM3® and the collection of organizational view through the respondent perceptions (in some cases the questions requested a subjective answer). On the other hand, the main research contribution was the identification of helpful agents of project selection according to organizational strategy. As a secondary contribution, the growing in academical research using technological support to data collection, in this case, e-mail and web-based, might be mentioned. Other contributions refer to the theoretical model proposed to the study and the field research itself, this one allowing data collection about project management and the use of OPM3® model to maturity level assessment in Brazilian companies.
|
2 |
A maturidade em gerenciamento de projetos e sua contribuição para a seleção de projetos de acordo com a estratégia organizacional. / Project management maturity and its contribution to project selection according to organizational strategy.Marcia Moreira Martins Pereira 13 September 2007 (has links)
A crescente busca pela utilização do gerenciamento de projetos enquanto diferencial estratégico no mercado atual e, mais recentemente, a procura pelo gerenciamento de projetos formal e estruturado, como parte da estratégia competitiva da organização, associadas à popularização do termo maturidade, justificam o conceito de maturidade em gerenciamento de projetos e a existência dos modelos de maturidade em gerenciamento de projetos. Existem atualmente diversos modelos de maturidade no mercado. A maioria deles está alinhada a um guia de conhecimento, que é utilizado como medida comparativa na avaliação do nível de maturidade da organização, e classifica o estágio de maturidade da organização em cinco níveis. Difere dos demais o modelo Organizational Project Management Maturity Model (OPM3®), proposto pelo Project Management Institute (2003). Ao invés de ser concebido como um modelo de níveis de maturidade, tem como enfoque três elementos (conhecimento, avaliação e melhoria), através dos quais o modelo se auto-atribui a capacidade de vincular projetos à estratégia organizacional. O presente estudo procurou avaliar a contribuição da maturidade em gerenciamento de projetos para a seleção de projetos de acordo com a estratégia organizacional. Quanto ao método de pesquisa, foi utilizado o survey, tendo como fonte de evidência um questionário auto-administrado web-based. A população de interesse do pesquisador foi composta pelas organizações estabelecidas no Brasil que se utilizam do gerenciamento de projetos; a amostra da pesquisa foi constituída de profissionais da área de gerenciamento de projetos da rede de contatos do pesquisador. As 78 respostas válidas obtidas com o survey foram submetidas às análises descritiva e inferencial. Em relação aos resultados obtidos, foi possível comprovar que a utilização do modelo OPM3® para avaliação do nível de maturidade da organização influencia a prática da seleção de projetos relacionados à estratégia organizacional. Não foi possível provar que a prática da seleção de projetos relacionados à estratégia organizacional seja influenciada pela existência de processo de formulação da estratégia ou pelo estágio de maturidade predominante na organização para cada domínio (projeto, programa e portfólio). Em se tratando das limitações do estudo, citam-se a pequena quantidade de empresas brasileiras onde o questionário de Auto-Avaliação proposto pelo OPM3® foi utilizado e a obtenção da visão da organização através da percepção do respondente (em alguns casos as questões exigiam uma resposta subjetiva). Por sua vez, a principal contribuição obtida com a pesquisa refere-se à identificação de elementos facilitadores da seleção de projetos relacionados à estratégia organizacional. Como contribuição secundária, pode ser citada a ampliação da quantidade de pesquisas acadêmicas realizadas com apoio de tecnologia para o recebimento dos dados, neste caso, email e hospedagem na Internet. Outras contribuições referem-se à proposição do modelo teórico para a pesquisa e à realização da pesquisa de campo em si, esta última permitindo a obtenção de dados sobre empresas nacionais no que tange ao gerenciamento de projetos e à utilização do modelo OPM3® para avaliação do nível de maturidade. / The increasing use of project management as strategic differential in our market and, most recently, the search of formal and structured project management, as part of organizational competitive strategy, in association with the maturity concept popularization, justify the concept of project management maturity and the existence of project management maturity models. There are many maturity models at the market. Most of them are aligned with a project management body of knowledge, used as reference to the organizational maturity level evaluation, and classify the organizational maturity stage into five linear levels. The Organizational Project Management Maturity Model (OPM3®), developed under the stewardship of the Project Management Institute (2003), is different. Instead of being designed as a system of levels of maturity, it focuses on three basic elements (knowledge, assessment and improvement), through which the model assigns itself the capability of join organizational strategy and projects. This study aimed to evaluate the contribution of project management maturity into bridging strategy and individual projects. The research method used was the survey, and the measurement instrument was a web-based self-assessment questionnaire. The population frame was composed by Brazilian organizations that use project management; the research sample was composed by researcher networking professionals used to work at project management area. The 78 valid responses obtained through survey were analyzed by descriptive and statistical inference. Regarding the results, it was possible to prove that OPM3® model application in order to assess organizational maturity level acts on the project selection according to organizational strategy. It was not possible to prove that project selection according to organizational strategy depends on the formulation process of the strategy or the organizational maturity stage for each domain (project, program and portfolio). Among the study limitations, there was the small quantity of Brazilian companies that had used Self-Assessment tool provided in OPM3® and the collection of organizational view through the respondent perceptions (in some cases the questions requested a subjective answer). On the other hand, the main research contribution was the identification of helpful agents of project selection according to organizational strategy. As a secondary contribution, the growing in academical research using technological support to data collection, in this case, e-mail and web-based, might be mentioned. Other contributions refer to the theoretical model proposed to the study and the field research itself, this one allowing data collection about project management and the use of OPM3® model to maturity level assessment in Brazilian companies.
|
3 |
The revitalisation of project management capability maturity in the electricity generation, transmission and distribution industry : the case of ESKOM in the Republic of South AfricaMoepi, Tshepiso Christian January 2020 (has links)
Thesis (M.Com. (Business Management)) -- University of Limpopo, 2020 / This research focuses on the evaluation of the project management maturity at Eskom. The problem is that Eskom struggled with delivery of projects as planned. The main objective of this research was to identify an applicable PMMM to assess the project management maturity level of Eskom’s core business units, namely Transmission, Distribution and Generation, by assessing its capability to undertake projects effectively in order to provide electricity to the Southern Africa communities. A quantitative research methodology was selected. A survey was conducted with a closed-ended questionnaire made up of three parts (Applicable project management maturity model, project management culture and project management organisation strategy maturity). The population consisted of senior project managers, project managers, and related project management personnel from Eskom in MegaWatt Park Johannesburg. 200 questionnaires were distributed to the Eskom business units, namely Distribution, Generation and Transmission project management employees, selected purely on their experience and knowledge, hence purposive sampling was used. Surveys were emailed to the respective project management personnel with the help of the senior manager. 133 were returned. This is a response rate of 66 %, which was deemed acceptable. Descriptive statistics was utilised to assess the project management maturity level of Eskom business units. Statistical Package for Social Sciences version 24 (SPSS) was utilised for the purpose of data and reliability analysis. Correlation and linear regression analysis were undertaken to evaluate influence of maturity levels of organisational strategy and culture on the project management maturity level. A Cronbach’s Alpha was utilised to measure the reliability of the data. It was concluded there were project management process areas, not performing well. Namely: project time management, project cost management and project procurement management. The assessment of project management organisational factors indicated that project management culture maturity did not perform well. It performed under the project management maturity level of Eskom. The recommendations of this study are that the applicable project management maturity model proposed should be continuously utilised to evaluate the project management maturity of Eskom on an ongoing basis; there should be a significant cultural change and a project management office should be established.
|
4 |
Fatores contribuintes para a maturidade em gerenciamento de projetos: um estudo em empresas brasileiras / Contributing factors for the maturity in management of projects: a study in Brazilian companiesSilveira, Gutenberg de Araujo 02 September 2008 (has links)
No ambiente complexo de negócios, caracterizado por desafios constantes, o gerenciamento de projetos, com sucesso, para as organizações passa a ser uma questão de sobrevivência. As organizações, para alcançarem melhor desempenho, precisam ter processos de gerenciamento de projetos, estruturados e maduros. Os modelos de maturidade em gerenciamento de projetos proporcionam uma abordagem quantitativa, porém não apresentam os fatores contribuintes que podem elevar a maturidade nas organizações. O objetivo deste estudo foi o de identificar quais fatores contribuintes que podem impulsionar a maturidade em gerenciamento de projetos nas organizações. O método de pesquisa foi o de estudo de campo, por meio de e-survey, de natureza descritiva e correlacional junto a 473 participantes, tomadores ou influenciadores de decisões, representando 360 organizações de diferentes tipos, portes e segmentos da economia brasileira. Os resultados do estudo permitiram concluir que os principais fatores contribuintes que podem impulsionar a alta maturidade em gerenciamento de projetos nas organizações brasileiras estão associados à seguinte hierarquia: i) Processos e Ferramentas; ii) Pessoas e Equipe; iii) Organização; iv) Clientes; v) Gerente de Projetos e iv) Negócios. / In the complex environment business-oriented, characterized by daily challenges, the successful projects management for organizations is a survival question. The organizations, in order to reach better performance need to have structured and mature project management processes. The projects management maturity models provide a quantitative approach, however they do not offer the contributing factors that can raise the maturity in the organizations. The aim of this study is to present which are the contributing factors that can raise the level of project management maturity in the organizations. The research method was a field study, by e-survey, a descriptive and correlational with 473 participants, influencing the decision and decision makers, representing 360 organizations of various types, sizes and segments of the Brazilian economy. Regarding the results, this research allow to conclude the main contributing factors that can leverage the high maturity in Brazilian organizations project management are associated with the following hierarchy: i) Processes and Tools, ii) People and Team iii) Organization, iv) Clients; v) Project Manager and iv) Business.
|
5 |
Fatores contribuintes para a maturidade em gerenciamento de projetos: um estudo em empresas brasileiras / Contributing factors for the maturity in management of projects: a study in Brazilian companiesGutenberg de Araujo Silveira 02 September 2008 (has links)
No ambiente complexo de negócios, caracterizado por desafios constantes, o gerenciamento de projetos, com sucesso, para as organizações passa a ser uma questão de sobrevivência. As organizações, para alcançarem melhor desempenho, precisam ter processos de gerenciamento de projetos, estruturados e maduros. Os modelos de maturidade em gerenciamento de projetos proporcionam uma abordagem quantitativa, porém não apresentam os fatores contribuintes que podem elevar a maturidade nas organizações. O objetivo deste estudo foi o de identificar quais fatores contribuintes que podem impulsionar a maturidade em gerenciamento de projetos nas organizações. O método de pesquisa foi o de estudo de campo, por meio de e-survey, de natureza descritiva e correlacional junto a 473 participantes, tomadores ou influenciadores de decisões, representando 360 organizações de diferentes tipos, portes e segmentos da economia brasileira. Os resultados do estudo permitiram concluir que os principais fatores contribuintes que podem impulsionar a alta maturidade em gerenciamento de projetos nas organizações brasileiras estão associados à seguinte hierarquia: i) Processos e Ferramentas; ii) Pessoas e Equipe; iii) Organização; iv) Clientes; v) Gerente de Projetos e iv) Negócios. / In the complex environment business-oriented, characterized by daily challenges, the successful projects management for organizations is a survival question. The organizations, in order to reach better performance need to have structured and mature project management processes. The projects management maturity models provide a quantitative approach, however they do not offer the contributing factors that can raise the maturity in the organizations. The aim of this study is to present which are the contributing factors that can raise the level of project management maturity in the organizations. The research method was a field study, by e-survey, a descriptive and correlational with 473 participants, influencing the decision and decision makers, representing 360 organizations of various types, sizes and segments of the Brazilian economy. Regarding the results, this research allow to conclude the main contributing factors that can leverage the high maturity in Brazilian organizations project management are associated with the following hierarchy: i) Processes and Tools, ii) People and Team iii) Organization, iv) Clients; v) Project Manager and iv) Business.
|
Page generated in 0.1392 seconds