• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 136
  • 7
  • 1
  • Tagged with
  • 144
  • 144
  • 96
  • 76
  • 69
  • 55
  • 43
  • 36
  • 35
  • 30
  • 29
  • 29
  • 24
  • 21
  • 21
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Tensões induzidas por descargas atmosféricas em redes de distribuição de baixa tensão. / Overvoltages on secondary networks due to nearby linghtning.

Silva Neto, Acácio 18 October 2004 (has links)
A utilização crescente de equipamentos eletro-eletrônicos sensíveis a interferências e a adoção de novos critérios para avaliação da qualidade da energia fornecida têm resultado em um aumento do número de pesquisas desenvolvidas com o objetivo de se obter informações a respeito das características das sobretensões em redes de baixa tensão. Isto motivou a realização deste trabalho, que teve por objetivo analisar as sobretensões causadas por descargas atmosféricas próximas a redes secundárias. O estudo trata inicialmente das tensões transferidas para a rede de baixa tensão, via transformador, devido a tensões induzidas no primário. Para tal são utilizados resultados experimentais obtidos em modelo de linhas de distribuição em escala reduzida e também medições de tensões induzidas por descargas naturais em uma linha especialmente construída para estudo do fenômeno. Com o uso de um modelo de transformador de distribuição típico, de validade comprovada para avaliação de surtos transferidos, são analisadas as tensões transferidas para a rede secundária considerando-se diversas formas de onda no primário. Posteriormente são calculadas as tensões induzidas nas redes de baixa tensão por descargas incidentes em suas proximidades através do 'Extended Rusck Model' (ERM) – modelo de validade comprovada por meio de centenas de comparações entre tensões induzidas medidas e calculadas. O trabalho discute as influências, nas tensões induzidas, do modo de representação do transformador e das cargas conectadas ao secundário, valor da resistência de terra, amplitude e velocidade de propagação da corrente no canal, etc. A comparação entre as tensões induzidas em linhas convencionais e multiplexadas também é realizada. É analisado também o uso de dispositivos de proteção contra surtos na rede multiplexada tendo em vista a redução das amplitudes das tensões induzidas. Por fim são feitas comparações entre tensões induzidas e tensões transferidas via transformador à rede secundária considerando a mesma descarga atmosférica. / The growing use of electric and electronic equipment prone to electromagnetic interferences and the adoption of new criteria for evaluating the quality of the power supplied have increased the number of studies developed in order to obtain information regarding the characteristics of overvoltages on low-voltage networks. Such fact has motivated the development of this work, which aimed at analyzing overvoltages caused by lightning discharges near secondary networks. The study first covers voltages transferred to the low-voltage network through the transformer due to induced voltages on its primary terminals. In order to accomplish that, experimental results obtained on a reduced scale model are used, as well as measurements of natural lightning induced voltages on a line specially built to study the phenomena. The voltages transferred to the secondary network, considering several waveforms on the primary, are analyzed by using a typical distribution transformer model, proven valid for evaluating transferred surges. The study then presents the calculation of voltages induced on low-voltage networks by discharges on their vicinity through the 'Extended Rusck Model' (ERM) – a model that has been validated by hundreds of comparisons between measured and calculated induced voltages. This work discusses the influences on induced voltages of the manner of representing the transformer and the loads connected to the secondary, as well as grounding resistance, amplitude and stroke current propagation speed, etc. Comparisons between lightning induced voltages on open wire lines and on lines with twisted conductors are also made. The use of surge protective devices on lines with twisted conductors is analyzed, and the reduction of induced voltage amplitudes is investigated. Finally, induced voltages and voltages transferred to the secondary network through a transformer are compared, considering the same lightning discharge.
22

Alocação de equipamentos de controle de tensão em redes de distribuição considerando recursos energéticos distribuídos. / Sem título em inglês

German Israel Casillas Peña 03 April 2017 (has links)
Nos atuais sistemas de distribuição de energia elétrica, podem ser aplicadas novas metodologias que consideram o comportamento em tempo real dos equipamentos, abrangendo cargas especiais como os veículos elétricos (VE) e sistemas de recursos energéticos distribuídos (RD). Neste trabalho se apresenta a revisão bibliográfica, que mostra a análise do desenvolvimento do planejamento dos sistemas de distribuição, seja da expansão e da operação, considerando as metodologias convencionais até as que abordam os RD\'s, concluindo que na atualidade não é possível analisar um sistema sem RD\'s e VE\'s e finalmente ter que operar um sistema com este tipo de geração e cargas na rede. O estudo das ferramentas de otimização permite determinar as técnicas a serem utilizadas. Este trabalho abrange duas, quais sejam, Busca em profundidade (depth-first search) e Algoritmos Genéticos, com objetivo de obter a alocação ótima dos reguladores de tensão, bancos de capacitores, conjuntamente com os sistemas fotovoltaicos e de armazenamento, que permitam manter a tensão dentro da faixa adequada estabelecida pela Agência Nacional de Energia Elétrica (ANEEL). A seguir, se apresenta a metodologia desenvolvida com os softwares utilizados, quais sejam, o OpenDSS para solução de fluxos de potência com recursos distribuídos e MATLAB para programar o algoritmo da metodologia desenvolvida. Os resultados nas redes teste IEEE de 13 barras e de porte real, denominada ckt5, mostram a importância de considerar a informação das curvas de carga e os perfis de geração dos recursos distribuídos dentro das metodologias, com objetivo de conseguir soluções de acordo com a realidade dos sistemas de distribuição. Logo após se apresentam as atividades futuras, que permitirão abranger aspectos dentro da função objetivo como os índices de tensão estabelecidos pela ANEEL, inserir outras fontes de geração como os sistemas eólicos e considerar os períodos dos estágios de planejamento dentro da metodologia desenvolvida, bem como as conclusões, referências bibliográficas e os anexos da dissertação. / In current electricity distribution systems, new methodologies that consider the real-time behavior of the equipment can be applied, involving special loads such as electric vehicles (EV) and distributed energy resources (RD) systems. In this work a literature review is presented, which shows the analysis of the development of the distribution systems planning, related to expansion and the operation, considering the conventional methodologies and those that consider the RD\'s, concluding that nowadays it is not possible to analyze a system without RD,s and EV\'s to operate a system with this type of generation and loads on the network. The study of the optimization tools allows to determine the techniques to be used. This work covers two, Depth-first search and Genetic Algorithms, in order to obtain an optimal location of voltage regulators, capacitor banks, photovoltaic and storage systems, that allow to maintain the voltage within the appropriate range established by the National Electric Energy Agency (ANEEL). Then, it the methodology developed is presented with the software used, namely, OpenDSS to solve power flows with distributed resources and MATLAB to program the optimization algorithms. The results in a real size network (ckt5) and in a 13-bus IEEE test network show the importance of considering information of the load curve and the generation profiles of distributed resources within the methodologies, aiming to achieve solutions according to the reality of the distribution systems. After that, future activities are presented, which will allow to cover aspects within the objective function, such as the voltage ratings established by the ANEEL, and insertion of other generation sources, such as wind systems as well as considering the periods of the planning stages within the methodology developed. Evertrally the conclusions, bibliographical references and the attachments of the dissertation are present.
23

Arborização viária X sistemas de distribuição de energia elétrica: avaliação dos custos, estudo das podas e levantamento de problemas fitotécnicos. / Street arborization x electric distribution system: evaluation of the costs, study of the pruning and a survey of phytotechnical problems.

Velasco, Giuliana Del Nero 01 July 2003 (has links)
É notório que a convivência entre redes de distribuição de energia elétrica e árvores de rua é, atualmente, um dos principais problemas da arborização viária, sendo a poda, o método mais utilizado para contorná-lo; embora livrando galhos da rede, em um primeiro instante, acaba por estimular novas brotações, as quais, em um curto espaço de tempo, atingirão novamente os fios. Com o intuito de estudar as podas feitas em árvores urbanas e analisar novas técnicas possíveis de serem utilizadas para reduzir o número de podas, melhorar a convivência das espécies com a fiação elétrica, além de permitir à árvore desempenhar plenamente a função ecológica que lhe é esperada, buscou-se levantar dados referentes aos três tipos principais de redes de distribuição de energia elétrica (aérea convencional, aérea compacta e subterrânea), em quatro concessionárias de energia elétrica, a fim de compilá-los em um só trabalho. Como parte teórica do trabalho, foram levantados custos de implantação das redes convencional, compacta e subterrânea, assim como custos de manutenção e de poda de árvores. Como parte prática, foram levantadas 100 árvores nas cidades de Piracicaba/SP, Maringá/PR e Belo Horizonte/MG, coletando-se dados em uma planilha, referentes a algumas condições fitotécnicas do exemplar e sua localização, para análise estatística, através do programa de "software" SAS. De acordo com as concessionárias, o custo de implantação de rede aérea convencional variou de R$54.188,39/km à R$67.571,43/km e de R$11.703,83/km à R$20.028,83/km só para rede primária. O custo de implantação de rede compacta variou de R$36.519,61/km à R$62.215,99/km. O custo de transformação de rede convencional para compacta variou de R$31.063,64/km à R$42.951,79/km. O custo de implantação de rede subterrânea foi de R$436.585,04/km, incluindo as obras civis. O custo de poda, em rede primária foi de R$20,00/árvore e em secundária de R$6,00/árvore. Considerando rede primária + secundária, o custo variou de R$32,02 à R$68,82/árvore. Na análise a campo, notou-se que apenas 1% da árvores em Piracicaba não estavam podadas, em contrapartida a 24% em Maringá. Devido à satisfatória classificação quanto ao aspecto geral das árvores, maior porcentagem de árvores sem presença de poda, a existência de 4,17% de indivíduos sem poda sob fiação, a menor área podada por árvore, praticamente o mesmo valor de custo de implantação e 79,5% de redução nos custos de manutenção, pode-se afirmar que é totalmente viável a utilização de redes compactas de distribuição de energia elétrica ao invés de rede convencional. Devido à satisfatória classificação quanto ao aspecto geral das árvores, razoável porcentagem de árvores sem presença de poda, a ausência de necessidade de podas drásticas, 1/3 de redução nos custos de manutenção e altíssima confiabilidade do sistema, pode-se afirmar que embora com alto investimento inicial, da ordem de 10 vezes maior em relação a rede convencional, o uso de redes subterrâneas é vantajoso. / It’s widely known that the relation between net distribution and trees in the street is, nowadays, one of the main problems of street arborization, being pruning, the best method used to solve it. Although at the first moment freeing the utility lines from the branches will stimulate new buds, in a short time they will reach the lines again. In order to study the pruning made in urban trees and analyze new techniques that may be used to reduce pruning, improve the relationship between the species and the net, and permit that the trees fulfill its proper ecological function, studies were made concerning the 3 main types of electric distribution: aerial conventional, compact and underground in 4 electric energy companies. The theorical part of the study showed the costs of implanting the 3 named nets and also the costs of pruning and tree maintenance. As to the practical part, 100 trees were studied in each one of these cities, Piracicaba/SP, Maringá/PR and Belo Horizonte/MG, gathering information about their phytotechnical conditions and localization for statistical analysis through the SAS statistical computer software program. According to the companies the cost of implantation of the conventional aerial net ranged from R$54.188,39/km to R$67.571,43/km and from R$11.703,83/km to R$20.028,83/km only for the primary net. The cost of implantation of the compact net ranged from R$36.519,61/km to R$62.215,99/km. To transform a conventional net into a compact one costs R$31.063,64/km to R$42.951,79/km. The cost of implantation the underground net was R$436.585,04/km including the workmanship. The cost of pruning, in primary net was R$20,00/tree and in the secondary one R$6,00/tree. Considering primary net + secondary, the cost ranged from R$32,02/tree to R$68,82/tree. In the field work it was observed that 1% of the trees in Piracicaba were not pruned, opposite of 24% in Maringá. Due to the satisfactory classification in the general aspect of the trees, to the high percentage of trees with no pruning, to the 4,17% of trees with no pruning under utility lines, to the smallest volume of pruned trees, to practically the same cost in implantation and 79,5% of reduction in maintenance costs, we can say that it is totally possible to use compact lines of distribution instead of the conventional ones. As to the satisfactory classification concerning the general aspect of the trees, reasonable percentage of the trees with no pruning, no need of drastic pruning, 1/3 reduction of the maintenance costs and high reliability of the system, we can affirm that the use of underground net is favorable, but it must be analyzed due to its high initial investment, about 10 times higher than the conventional one.
24

Aplicação de métricas de confiabilidade para avaliação da setorização de sistemas de abastecimento de água / Usage of reliability measures for water network partitioning assessment

Tatiana Mateus Gomes 08 October 2018 (has links)
Os avanços observados em Sistemas de Distribuição de Água vêm surgindo da necessidade de aumentar a eficiência, a qualidade e segurança do abastecimento de água aos consumidores. Dois desses avanços recentes que podem ser citados são a setorização e a quantificação da confiabilidade. O processo de setorização de um sistema de distribuição de água favorece a sua gestão, uma vez que possibilita maior controle da vazão distribuída e dos limites de fornecimento do serviço, entretanto pode implicar em restrições no abastecimento durante eventos de falhas ou emergências, sendo necessária a avaliação da confiabilidade. Diversos pesquisadores têm buscado uma metodologia coerente e adequada para quantificar a confiabilidade em sistemas de distribuição de água, muitos deles desenvolvendo métricas alternativas que visam simplificar esta definição. O presente trabalho visou investigar métricas alternativas de confiabilidade, propostas na literatura especializada, aplicando-as a estudos de caso para a rede original e após a setorização. Os resultados sugerem a viabilidade de utilização das métricas de confiabilidade como forma de avaliar diferentes níveis de setorização, no que diz respeito à vulnerabilidade do sistema. / Improvements upon Water Distribution Systems have been made under the urge of increasing efficiency, quality and security of water supply to its customers. A couple of recent breakthroughs on Water Distribution Network are partitioning and reliability. Water network partitioning enhances operational management, once it enables higher control of supplied flow and awareness of boundaries regarding each partition. Nevertheless, it can lead to supply restrictions under emergency and failure events, what may require reliability assessment. Several researchers have pursued consistent approach to quantify reliability of Water Distribution Network, many of them proposed surrogate measures which focused on simplifying its measurement. The aim of this work is to look into surrogate reliability measures proposed in the literature and applying them on case studies for its original layout and after proposed partitioning. The results implies the usage feasibility for the reliability measures as a way of evaluating different stages of partitioning, regarding system\'s vulnerability.
25

Alocação de equipamentos de controle de tensão em redes de distribuição considerando recursos energéticos distribuídos. / Sem título em inglês

Casillas Peña, German Israel 03 April 2017 (has links)
Nos atuais sistemas de distribuição de energia elétrica, podem ser aplicadas novas metodologias que consideram o comportamento em tempo real dos equipamentos, abrangendo cargas especiais como os veículos elétricos (VE) e sistemas de recursos energéticos distribuídos (RD). Neste trabalho se apresenta a revisão bibliográfica, que mostra a análise do desenvolvimento do planejamento dos sistemas de distribuição, seja da expansão e da operação, considerando as metodologias convencionais até as que abordam os RD\'s, concluindo que na atualidade não é possível analisar um sistema sem RD\'s e VE\'s e finalmente ter que operar um sistema com este tipo de geração e cargas na rede. O estudo das ferramentas de otimização permite determinar as técnicas a serem utilizadas. Este trabalho abrange duas, quais sejam, Busca em profundidade (depth-first search) e Algoritmos Genéticos, com objetivo de obter a alocação ótima dos reguladores de tensão, bancos de capacitores, conjuntamente com os sistemas fotovoltaicos e de armazenamento, que permitam manter a tensão dentro da faixa adequada estabelecida pela Agência Nacional de Energia Elétrica (ANEEL). A seguir, se apresenta a metodologia desenvolvida com os softwares utilizados, quais sejam, o OpenDSS para solução de fluxos de potência com recursos distribuídos e MATLAB para programar o algoritmo da metodologia desenvolvida. Os resultados nas redes teste IEEE de 13 barras e de porte real, denominada ckt5, mostram a importância de considerar a informação das curvas de carga e os perfis de geração dos recursos distribuídos dentro das metodologias, com objetivo de conseguir soluções de acordo com a realidade dos sistemas de distribuição. Logo após se apresentam as atividades futuras, que permitirão abranger aspectos dentro da função objetivo como os índices de tensão estabelecidos pela ANEEL, inserir outras fontes de geração como os sistemas eólicos e considerar os períodos dos estágios de planejamento dentro da metodologia desenvolvida, bem como as conclusões, referências bibliográficas e os anexos da dissertação. / In current electricity distribution systems, new methodologies that consider the real-time behavior of the equipment can be applied, involving special loads such as electric vehicles (EV) and distributed energy resources (RD) systems. In this work a literature review is presented, which shows the analysis of the development of the distribution systems planning, related to expansion and the operation, considering the conventional methodologies and those that consider the RD\'s, concluding that nowadays it is not possible to analyze a system without RD,s and EV\'s to operate a system with this type of generation and loads on the network. The study of the optimization tools allows to determine the techniques to be used. This work covers two, Depth-first search and Genetic Algorithms, in order to obtain an optimal location of voltage regulators, capacitor banks, photovoltaic and storage systems, that allow to maintain the voltage within the appropriate range established by the National Electric Energy Agency (ANEEL). Then, it the methodology developed is presented with the software used, namely, OpenDSS to solve power flows with distributed resources and MATLAB to program the optimization algorithms. The results in a real size network (ckt5) and in a 13-bus IEEE test network show the importance of considering information of the load curve and the generation profiles of distributed resources within the methodologies, aiming to achieve solutions according to the reality of the distribution systems. After that, future activities are presented, which will allow to cover aspects within the objective function, such as the voltage ratings established by the ANEEL, and insertion of other generation sources, such as wind systems as well as considering the periods of the planning stages within the methodology developed. Evertrally the conclusions, bibliographical references and the attachments of the dissertation are present.
26

Calibração de modelos hidráulicos de redes de abastecimento de água de sistemas reais admitindo vazamentos / Calibration analysis considering leakage applied to existing water supply systems

Colombo, Fernando 09 February 2007 (has links)
Considerando a necessidade do controle mais efetivo dos sistemas de distribuição de água para abastecimento, a calibração constitui etapa fundamental a ser trilhada para garantir a reprodução do comportamento dos sistemas sob as mais diversas condições operacionais. Apesar da importância da calibração e da diversidade de modelos construídos com esse propósito no ambiente acadêmico, essa prática não tem sido amplamente utilizada pelas companhias, que demonstram certa relutância em fazer uso de modelos matemáticos. É interessante, portanto, que os modelos existentes sejam intensivamente testados em sistemas reais para que se possam estabelecer diretrizes para a sua utilização, bem como uma maior confiança no seu emprego. O presente trabalho de pesquisa visou o estudo de aplicação de um modelo especialmente construído para a calibração de sistemas, através do qual é possível identificar variáveis de campo tais como rugosidades, diâmetros, parâmetros do modelo de vazamentos, etc. O modelo empregado é abrangente o suficiente para incorporar vazamentos e demandas variáveis com a pressão. Através dele, foram realizados dois estudos de caso e discutidas as razões pelas quais discrepâncias entre os valores simulados e observados foram detectadas, apesar da consistência das respostas produzidas via simulação. Algumas recomendações são feitas também no sentido de viabilizar estudos dessa natureza que possam produzir ferramental diretamente utilizável pelas concessionárias de água para abastecimento. / Considering the need for more effective control of water supply distribution systems, the calibration constitutes fundamental step to guarantee that the system behavior under several operational conditions can be reproduced. Instead of the importance of calibration and the variety of models built by the academy for this purpose, this practice has not been broadly used by the water industry, which demonstrates certain reluctance regards the use of mathematical models. It is interesting, hence, that existing models are intensively tested in real systems to establish guidelines and consequent confidence in their use. The present research focused on the study of a model especially built for the calibration of water supply systems, through which it is possible identify field variables such as roughness, diameters, parameters of leakage model, etc. The model is comprehensive enough to incorporate leakage and pressure driven demands. Two study cases were analyzed supported by the model and discussed the reasons by which disagreement between simulated and observed data were verified, instead of the consistency of results produced by simulation. Some recommendations are made to become practical this kind of study as useful tool for the water industry.
27

Modelo de sistema de informação e decisão para o planejamento das intervenções de melhoria em redes de distribuição de sistemas de abastecimento de água

Paula da Silva Farias, Ana 31 January 2008 (has links)
Made available in DSpace on 2014-06-12T17:36:51Z (GMT). No. of bitstreams: 2 arquivo3673_1.pdf: 798340 bytes, checksum: ce5dbd56ecb7649472d0c6f8a23b273a (MD5) license.txt: 1748 bytes, checksum: 8a4605be74aa9ea9d79846c1fba20a33 (MD5) Previous issue date: 2008 / Conselho Nacional de Desenvolvimento Científico e Tecnológico / A água é um dos recursos naturais mais importantes para o desenvolvimento das diversas regiões do planeta. Sem a água, várias atividades ficam comprometidas, desde as necessidades domésticas até as relacionadas ao desenvolvimento econômico e social dos países. Gerenciar tal recurso de forma otimizada para atender a população, em quantidade e qualidade satisfatórias, é o grande desafio dos responsáveis por esse gerenciamento. E esse desafio torna-se ainda mais complexo quando se constata o envelhecimento das infra-estruturas de abastecimento de água, em especial, das redes de distribuição que, ao longo dos anos, vêm apresentando diversos problemas, seja de ordem estrutural ou hidráulica. Dentro deste contexto, foi realizada uma pesquisa bibliográfica a respeito dos sistemas de informação e decisão, bem como sobre o entendimento do problema de planejamento para as intervenções de melhoria das redes de abastecimento, onde se procurou conhecer as tecnologias existentes para a implantação das intervenções e os problemas a elas associados. Observou-se, ao longo do estudo, os sistemas de monitoramento e de informações das redes de distribuição, juntamente com a análise de uma metodologia de apoio à decisão que fosse mais adequada ao tratamento do problema. Assim, esta dissertação vem propor um modelo de sistema de informação e decisão, que auxilie, efetivamente, os gestores nas atividades de planejamento das intervenções de melhoria em redes de distribuição de sistemas de abastecimento de água
28

Arborização viária X sistemas de distribuição de energia elétrica: avaliação dos custos, estudo das podas e levantamento de problemas fitotécnicos. / Street arborization x electric distribution system: evaluation of the costs, study of the pruning and a survey of phytotechnical problems.

Giuliana Del Nero Velasco 01 July 2003 (has links)
É notório que a convivência entre redes de distribuição de energia elétrica e árvores de rua é, atualmente, um dos principais problemas da arborização viária, sendo a poda, o método mais utilizado para contorná-lo; embora livrando galhos da rede, em um primeiro instante, acaba por estimular novas brotações, as quais, em um curto espaço de tempo, atingirão novamente os fios. Com o intuito de estudar as podas feitas em árvores urbanas e analisar novas técnicas possíveis de serem utilizadas para reduzir o número de podas, melhorar a convivência das espécies com a fiação elétrica, além de permitir à árvore desempenhar plenamente a função ecológica que lhe é esperada, buscou-se levantar dados referentes aos três tipos principais de redes de distribuição de energia elétrica (aérea convencional, aérea compacta e subterrânea), em quatro concessionárias de energia elétrica, a fim de compilá-los em um só trabalho. Como parte teórica do trabalho, foram levantados custos de implantação das redes convencional, compacta e subterrânea, assim como custos de manutenção e de poda de árvores. Como parte prática, foram levantadas 100 árvores nas cidades de Piracicaba/SP, Maringá/PR e Belo Horizonte/MG, coletando-se dados em uma planilha, referentes a algumas condições fitotécnicas do exemplar e sua localização, para análise estatística, através do programa de “software” SAS. De acordo com as concessionárias, o custo de implantação de rede aérea convencional variou de R$54.188,39/km à R$67.571,43/km e de R$11.703,83/km à R$20.028,83/km só para rede primária. O custo de implantação de rede compacta variou de R$36.519,61/km à R$62.215,99/km. O custo de transformação de rede convencional para compacta variou de R$31.063,64/km à R$42.951,79/km. O custo de implantação de rede subterrânea foi de R$436.585,04/km, incluindo as obras civis. O custo de poda, em rede primária foi de R$20,00/árvore e em secundária de R$6,00/árvore. Considerando rede primária + secundária, o custo variou de R$32,02 à R$68,82/árvore. Na análise a campo, notou-se que apenas 1% da árvores em Piracicaba não estavam podadas, em contrapartida a 24% em Maringá. Devido à satisfatória classificação quanto ao aspecto geral das árvores, maior porcentagem de árvores sem presença de poda, a existência de 4,17% de indivíduos sem poda sob fiação, a menor área podada por árvore, praticamente o mesmo valor de custo de implantação e 79,5% de redução nos custos de manutenção, pode-se afirmar que é totalmente viável a utilização de redes compactas de distribuição de energia elétrica ao invés de rede convencional. Devido à satisfatória classificação quanto ao aspecto geral das árvores, razoável porcentagem de árvores sem presença de poda, a ausência de necessidade de podas drásticas, 1/3 de redução nos custos de manutenção e altíssima confiabilidade do sistema, pode-se afirmar que embora com alto investimento inicial, da ordem de 10 vezes maior em relação a rede convencional, o uso de redes subterrâneas é vantajoso. / It’s widely known that the relation between net distribution and trees in the street is, nowadays, one of the main problems of street arborization, being pruning, the best method used to solve it. Although at the first moment freeing the utility lines from the branches will stimulate new buds, in a short time they will reach the lines again. In order to study the pruning made in urban trees and analyze new techniques that may be used to reduce pruning, improve the relationship between the species and the net, and permit that the trees fulfill its proper ecological function, studies were made concerning the 3 main types of electric distribution: aerial conventional, compact and underground in 4 electric energy companies. The theorical part of the study showed the costs of implanting the 3 named nets and also the costs of pruning and tree maintenance. As to the practical part, 100 trees were studied in each one of these cities, Piracicaba/SP, Maringá/PR and Belo Horizonte/MG, gathering information about their phytotechnical conditions and localization for statistical analysis through the SAS statistical computer software program. According to the companies the cost of implantation of the conventional aerial net ranged from R$54.188,39/km to R$67.571,43/km and from R$11.703,83/km to R$20.028,83/km only for the primary net. The cost of implantation of the compact net ranged from R$36.519,61/km to R$62.215,99/km. To transform a conventional net into a compact one costs R$31.063,64/km to R$42.951,79/km. The cost of implantation the underground net was R$436.585,04/km including the workmanship. The cost of pruning, in primary net was R$20,00/tree and in the secondary one R$6,00/tree. Considering primary net + secondary, the cost ranged from R$32,02/tree to R$68,82/tree. In the field work it was observed that 1% of the trees in Piracicaba were not pruned, opposite of 24% in Maringá. Due to the satisfactory classification in the general aspect of the trees, to the high percentage of trees with no pruning, to the 4,17% of trees with no pruning under utility lines, to the smallest volume of pruned trees, to practically the same cost in implantation and 79,5% of reduction in maintenance costs, we can say that it is totally possible to use compact lines of distribution instead of the conventional ones. As to the satisfactory classification concerning the general aspect of the trees, reasonable percentage of the trees with no pruning, no need of drastic pruning, 1/3 reduction of the maintenance costs and high reliability of the system, we can affirm that the use of underground net is favorable, but it must be analyzed due to its high initial investment, about 10 times higher than the conventional one.
29

Avaliação do impacto da geração distribuída sobre o sistema de proteção de sobrecorrente de uma rede de distribuição operando em ilhamento intencional / Impact assessment of the distributed generation on the overcurrent protection system of a distribution network operating in intentional islanding

Robson Roberto Sguaçabia 26 March 2015 (has links)
O crescente número de geradores distribuídos conectados em redes de distribuição de energia elétrica é uma realidade dos sistemas elétricos de todo o mundo. Embora a política atual seja desconectar os geradores distribuídos do sistema elétrico de potência (SEP) caso ocorra uma falha na rede da concessionária, conforme preconizam os principais guias técnicos nacionais e internacionais, o módulo 3 dos Procedimentos de Distribuição de Energia Elétrica no Sistema Elétrico Nacional (PRODIST) mostra-se favorável à operação ilhada, pois afirma que este tipo de operação pode ser realizado em comum acordo entre as centrais geradoras de energia e o Operador Nacional do Sistema Elétrico (ONS), permitindo alcançar uma maior disponibilidade no fornecimento de energia. No entanto, para que a operação ilhada seja possível e possa ser praticada de forma segura, o ilhamento intencional precisa superar alguns desafios, dentre os quais estão aqueles relacionados ao sistema de proteção da rede de distribuição, tais como: coordenação indevida de dispositivos de proteção, perda da sensibilidade da proteção, abertura inadequada de fusíveis e religamentos automáticos fora de sincronismo. Portanto, este trabalho avalia o impacto da geração distribuída (GD) sobre o sistema de proteção de sobrecorrente de uma rede de distribuição operando ilhada. A ideia principal é dividir a rede em regiões delimitadas pelos dispositivos de proteção existentes, para em seguida, adequá-los à nova situação operacional, certificando se os ajustes propostos atendem ao comportamento síncrono e estável do sistema de geração por meio de uma análise de estabilidade transitória. Propõe-se então um conjunto de procedimentos para tomada de ações que permitam readequar o sistema de proteção de sobrecorrente existente à operação ilhada. Os resultados obtidos demonstram que a inibição do religamento automático e da curva de atuação instantânea acrescida de reajustes nas curvas temporizadas dos relés e religadores, melhoraram a coordenação e seletividade da rede operando ilhada. / The growing number of distributed generators connected to electricity distribution networks is a reality of electrical systems throughout the world. Although the current policy is to disconnect the distributed generators from the electric power system (EPS) in the event of loss of mains, as required by main national and international technical guides, the module 3 of the Procedures for Electric Power Distribution in the Electric National System (PRODIST) shows itself in favor of islanded operation, it states that this type of operation can be carried out in agreement between power generation plants and the National Electric System Operator (ONS), allowing achieve larger availability in energy supply. However, to make the islanded operation possible and safe, the intentional islanding must overcome some challenges, among which are those related to the protection system of the distribution network, such as improper coordination of protective devices, loss of protection sensitivity, inadequate opening of fuses and automatic reclosing out of synchronism. Therefore, this work evaluates the impact of distributed generation (DG) on the overcurrent protection system of a distribution network operating islanded. The main idea is to divide the network into regions bounded by existing protection devices, to then adapt them to the new operational situation, making sure that the proposed adjustments meet the synchronous and stable behavior of the generation system by means of a transient stability analysis. Thus, a set of procedures is proposed to indicate actions that allow readjusting the existing overcurrent protection system to the islanded operation. The results demonstrate that the inhibition of automatic restart and of the instantaneous operating curve plus adjustments in time delay curves of relays and reclosers, improved the coordination and selectivity of the network operating islanded.
30

Uso de simuladores hidráulicos e aplicativos de geoprocessamento para diagnóstico operacional de sistemas de distribuição de água - estudo de caso: setor Sacomã, município de São Paulo. / Use of hydraulic simulators and geoprocessing applications for water distribution systems operational diagnosis - case study: water supply system Sacomã, city of São Paulo.

Hilton Alexandre de Oliveira 17 February 2011 (has links)
O trabalho apresenta uma proposta de metodologia para diagnóstico de sistemas de distribuição de água através da elaboração, passo a passo, e de uso de simuladores hidráulicos apoiados por aplicativos de geoprocessamento. Utilizando-se de dados reais como o histórico operacional de vazamentos dentro da região adotada num intervalo de tempo, espera-se fornecer ao analista um instrumento de análise visual do comportamento hidráulico do setor em função de uma escala progressiva de ocorrências, mapeada através de cores, permitindo avaliar a qualidade do modelo hidráulico como um todo, corrigindo desvios para que o mesmo reproduza eficientemente o comportamento real da rede de distribuição. Através deste, esperase avaliar as consequências da variação das pressões e vazões durante o dia, subsidiando tomadas de decisão, permitindo avaliação das opções e a redução de riscos e investimentos desnecessários. / The work presents a proposed methodology for diagnosis of water distribution systems through the development, step-by-step and hydraulic simulators use supported by geoprocessing applications. Using real data and operational history of leaks within the region adopted a time interval, is expected to provide the analyst a tool for visual analysis of the hydraulic behavior of the sector according to a progressive scale of occurrences, mapped through colors, in order to evaluate the quality of hydraulic model as a whole, correcting deviations so that it efficiently reproduces the actual behavior of the distribution network. Through this, it is expected to evaluate the consequences of variation of pressure and flows during the day, supporting decision-making, allowing the evaluation of the options and the reduction of unnecessary risks and investments.

Page generated in 0.0286 seconds