• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 3
  • Tagged with
  • 3
  • 3
  • 3
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Redes de projeto: Análise de Rede Social em uma Experiência de Codesign

Diehl, Márcia Regina 28 August 2014 (has links)
Submitted by William Justo Figueiro (williamjf) on 2015-06-25T21:44:01Z No. of bitstreams: 1 35.pdf: 26253336 bytes, checksum: fbdd327537205ae1b0ded9b494b97340 (MD5) / Made available in DSpace on 2015-06-25T21:44:02Z (GMT). No. of bitstreams: 1 35.pdf: 26253336 bytes, checksum: fbdd327537205ae1b0ded9b494b97340 (MD5) Previous issue date: 2014 / Nenhuma / A presente pesquisa analisou a evolução da rede projetual durante o desenvolvimento de um projeto de codesign envolvendo atores de diferentes organizações (interorganizacional), de várias disciplinas de conhecimento (interdisciplinar) e com distintos cargos e tarefas (interfuncional). Utilizou-se do método de análise de que é voltado a entender como se relacionam os atores que constituem uma rede. Os atores que participaram da rede projetual objeto deste estudo são designers, especialistas de outras disciplinas e os futuros usuários de uma plataforma digital para compartilhar conhecimento na comunidade de Taquara/RS. Foram coletados dados sobre as relações sociais entre os participantes e sobre os fluxos de informações durante o desenvolvimento do projeto. Dessa forma, foi possível desenhar os mapas de relações e calcular os índices de centralidade dos atores, ou seja, foi possível visualizar quem forneceu e quem recebeu informações, quais atores engajaram-se no processo servindo com intermediários das informações, os agrupamentos organizacionais, entre outras informações. O resultado do cruzamentos dos dados indicou que: os designers inseriramse na rede tornando-se fonte das informações projetuais; o gestor do projeto desempenhou o papel de gestor das relações provocando o adensamento das relações projetuais; alguns designers e um especialista tornaram-se fontes das informações de aprendizado das ferramentas projetuais. Tais resultados podem servir de insumos estratégicos para o trabalho em redes projetuais, auxiliando os designers no entendimento de suas funções projetuais quando operando projetos colaborativos interorganizacionais, interfuncionais e interdisciplinares. / The present study examined the evolution of design network during the development of a codesign project involving actors from different organizations (interorganizational) from various disciplines of knowledge (interdisciplinary) and with different positions and tasks (interfunctional). We used the method of social network analysis which is addressed to understand the actor’s relationship who constitute a network. The actors who participated of the project’s network, object of this study, are designers, specialists from other disciplines and future users of a digital platform for sharing knowledge in Taquara / RS community. It were collected data about the social relationships between the participants and about the flow of information during the development of the project. Thus, it was possible to draw maps of relationships and calculating the actor’s centrality, ie, it was possible to see who gave and who received information, which actors engaged in the process serving with intermediaries of information, organizational clusters, among other information. The result of the data’s intersections indicated that: the designers were inserted in the network becoming source of project's information; the project manager acted as manager of the relationships causing thickening of project relations; some designers and one expert become information’s source for learning of the project tools. These results may provide strategic inputs to work in project networks, helping designers in understanding its functions when operating interorganizational, interfunctional and interdisciplinary collaborative projects.
2

[en] VIRTUAL ORGANIZATIONAL NETWORKS: CHARACTERIZATION, FORMATION AND MANAGEMENT / [pt] REDES ORGANIZACIONAIS VIRTUAIS: CARACTERIZAÇÃO, FORMAÇÃO E GERENCIAMENTO

ALEXANDRE SHEREMETIEFF JUNIOR 22 December 2003 (has links)
[pt] Uma Rede Organizacional Virtual é uma organização de cooperação interorganizacional, com uso intenso de Tecnologia de Informação e Comunicação, típica do ambiente globalizado. Nesta dissertação, busca-se caracterizar esse padrão de rede e propor instrumentos para seu gerenciamento. O termo Redes Organizacionais Virtuais é introduzido, a partir da caracterização e da classificação das Redes de Cooperação e das Organizações Virtuais. Propõe- se a Metodologia de Reticulação para o planejamento e formação dessas redes e explicita-se a necessidade de instrumentos de coordenação, controle e avaliação para assegurar o seu melhor desempenho. Com essa fundamentação, analisa-se a Rede de Projeto e Desenvolvimento de Turbinas a Gás - RTG, determinando-se suas características e propondo-se metodologias de planejamento, coordenação e controle para sua administração. Recomenda-se, ainda, a implementação de um sistema de informações como instrumento reticulador. / [en] A Virtual Organizational Network is an inter-organizational cooperation organization, based in Communication and Information Technology, typical of the global environment. The objective of this dissertation is to characterize this network and propose appropriate management tools for its adequate functioning. The term Virtual Organizational Network is introduced based on the characteristics and taxonomy of Cooperation Networks and Virtual Organizations. To form, consolidate and plan this network, the Reticulation Methodology is proposed. The necessity of coordination, governance and performance evaluation tools for these networks is made explicit. This constitutes the basis for the analysis of the Gas Turbine Development and Project Network- RTG. Its characteristics are identified and methodologies for its planning, coordination and governance are proposed, as well as an Information System, as instrument for reticulation.
3

Uma extensão de Rede de Petri para modelagem de processos e controle de projetos. / A Petri Net extension for process modeling and project control.

FARIAS, Cecir Barbosa de Almeida. 29 August 2018 (has links)
Submitted by Johnny Rodrigues (johnnyrodrigues@ufcg.edu.br) on 2018-08-29T20:33:17Z No. of bitstreams: 1 CECIR BARBOSA DE ALMEIDA FARIAS - TESE PPGEE 2008..pdf: 3519703 bytes, checksum: 32a6ddd97df6cc8d338729152ef94012 (MD5) / Made available in DSpace on 2018-08-29T20:33:17Z (GMT). No. of bitstreams: 1 CECIR BARBOSA DE ALMEIDA FARIAS - TESE PPGEE 2008..pdf: 3519703 bytes, checksum: 32a6ddd97df6cc8d338729152ef94012 (MD5) Previous issue date: 2008-10-02 / CNPq / Freqüentemente no desenvolvimento de projetos ocorrem desperdícios, defeitos e prazos esgotados. Na área de desenvolvimento de software também percebemos isso com muita ênfase, onde projetos complexos são desenvolvidos com dificuldades, apesar de existirem técnicas, modelos ou ferramentas tradicionais de gestão de projetos. Deadlines são estendidos e o custo do software acaba sendo incrementado significativamente. Os modelos de gestão de projetos tradicionais não são muito adequados a projetos de grande escala e com demanda de curto prazo. As ferramentas de gerenciamento de projetos não dão cobertura ao acompanhamento de processos e projetos (tempos, custos, recursos e atividades) de software simultaneamente. As metodologias de desenvolvimento de software existentes representam muitos avanços para auxiliar no desenvolvimento de sistemas, mas falta uma utilização mais adequada delas nos projetos, de acordo com a complexidade do tipo de aplicação desenvolvida e suas características específicas. Este trabalho é centrado na extensão de uma rede para gerenciamento de projetos, chamada Rede de Atividades, desenvolvida para detalhar informações sobre o desenvolvimento de processos e projetos, calcular e atualizar custos, tempos, especificar recursos humanos e o desenvolvimento de atividades. Esta rede é o componente principal de um ambiente integrado de gerência de desenvolvimento projetos, denominado GDP, considerando o desenvolvimento de projetos em quatro camadas: (1) determinação da metodologia adequada; (2) modelagem da metodologia; (3) modelagem do projeto específico; (4) execução do projeto. Para determinar a qualidade estrutural de uma Rede de Atividades e permitir simulações e cálculos corretos dos custos e prazos de um projeto, foi desenvolvido um tipo especial de rede de Petri, denominado Rede de Projeto, e determinada a conversão de uma Rede de Atividades em uma Rede de Projeto. / Frequently in the development of projects occurs waste of resources, defects and missing deadlines. In the software development area this issue becomes more significant, where complex projects are developed with difficulty, although techniques, models and traditional tools for project management are popular. Deadlines always are extended and the cost of software being developed gowns significantly. The traditional models of project management don‘t fit very well to large projects with a short schedule. The actual project management tools do not cover the track of both processes (times, costs, resources and activities) and software projects. The actual software development methodologies represent many advances to assist a manager into a software development process, but it lacks a more adequate use of them, in accordance with the specific complexity of the type of application being developed and its characteristics. This work is centered in the extension of a net for project management, called Activities Net, designed to track detailed information about the development of processes and projects, calculate and update costs, allocate human resources and schedule activities. This net is the main component of an integrated environment for project development management, called GDP, based on a four-layer approach: (1) determine de best methodology; (2) model the metodology; (3) model the project; (4) execute the project. In order to determine the structural quality of an Activities Net and allow simulations and correct cost a time calculations, a special class of Petri Nets has been developed, called Project Net (NP). Also the mapping of an Activities Net to a Project Net has been defined.

Page generated in 0.0511 seconds