• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 28
  • Tagged with
  • 29
  • 29
  • 23
  • 18
  • 10
  • 7
  • 7
  • 6
  • 6
  • 6
  • 6
  • 6
  • 6
  • 6
  • 5
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

SISTEMA DE PROTEÇÃO DOS DIREITOS HUMANOS DAS MULHERES NO BRASIL: LEI MARIA DA PENHA E SUA EFETIVIDADE.

Araujo, Darlene Costa Azevedo 03 October 2013 (has links)
Made available in DSpace on 2016-08-10T10:47:07Z (GMT). No. of bitstreams: 1 DARLENE COSTA AZEVEDO ARAUJO.pdf: 2125281 bytes, checksum: fd307d4acca81b84c5017981890544a7 (MD5) Previous issue date: 2013-10-03 / Esta dissertação Sistema de proteção aos direitos humanos da mulher no Brasil: Lei Maria da Penha e sua efetividade trata da discriminação histórica da mulher e violência doméstica, aborda a internacionalização dos direitos humanos e os avanços do sistema jurídico brasileiro na igualdade entre homens e mulheres. Tem por objeto demonstrar que a violação dos direitos humanos da mulher ainda persiste no Brasil, no mercado de trabalho, no aprisionamento das mulheres e notadamente no âmbito doméstico, através dos fatos e inclusive por meio de dados estatísticos. Concentra no estudo da Lei nº 11.340/2006 e sua eficácia no enfrentamento da violência doméstica, buscando reforço junto aos profissionais que lidam com este problema, como Delegadas de Polícia e ativistas feministas. Analisa a Lei Maria da Penha também sob o aspecto de ação afirmativa e sua constitucionalidade. Ao final, propõe a reflexão sobre a insuficiência e ineficácia das políticas públicas para o enfrentamento da violação dos direitos humanos da mulher e a cultura brasileira de que o recrudescimento das leis é o remédio para todos os males da sociedade no que tange à criminalidade.
12

Utilização de um sistema multi-agentes em redes de comunicação para a proteção digital de distância adaptativa / Using a multi-agent system in communication networks for an adaptive digital distance protection system

Silva, Breno Caetano da 06 April 2009 (has links)
Esta pesquisa apresenta a implementação de um sistema de proteção digital de distância adaptativo dispondo de um sistema multi-agentes (SMA). Tal SMA trabalhará de forma distribuída, possuindo entidades especialistas (Agentes) inseridas em locais específicos e agindo de forma eficiente na solução de problemas locais. Espera-se pela aplicação deste SMA, atribuir aos relés de distância características desejáveis e difíceis de serem alcançadas pelas técnicas convencionais. Dentre as deficiências observadas nos sistemas de proteção convencionais, tem-se a não sensibilidade à dinâmica dos sistemas elétricos de potência em função das alterações nas condições operacionais. Logo, tem-se então a necessidade de um sistema de proteção mais flexível, seletivo e eficaz para assegurar a confiabilidade e a continuidade no suprimento da energia elétrica. Para desenvolver tal proposição, foram realizadas diversas e distintas simulações computacionais dispondo do software ATP (Alternative Transients Program) para a geração das prováveis curvas de operação adaptativa. Estas, quando inseridas em um banco de dados, serão representativas das esperadas alterações nas condições operacionais de um sistema elétrico em especifico. Para a implementação e validação desta abordagem, diversos testes foram realizados, tendo como finalidade a comparação desta abordagem dispondo de SMA com a filosofia tradicional de proteção de distância. Os resultados obtidos são promissores e demonstram o alto grau de precisão e confiabilidade do método proposto. / This research presents the development of an adaptive digital distance protection system by a multi-agent system (MAS). This MAS will work in a distributed way, with expert entities (agents) inserted in specific places and acting efficiently in the solution of local problems. With the application of the MAS, the distance relays will have desirable characteristics, which are difficult to be reached by conventional techniques. Among the deficiencies observed in conventional protection systems, there is the insensitivity to the dynamics of the electrical power system due to changes in operating conditions. So, there is the necessity of a protection system which is more flexible, selective and effcient to assure reliability and continuity in the electricity supply. To improve these characteristics, several computational simulations were done using alternative transients program (ATP) to generate the desirable adaptive operation curves. These curves, when inserted into a database, will represent the expected changes in the operating conditions of an electrical system. For the implementation and validation of this approach, several tests were done with the purpose of comparison of this approach (using MAS) to the traditional philosophy of distance protection. The results obtained are promising and demonstrate a highly satisfactory degree of accuracy and reliability of the proposed method.
13

Identificação de requisitos de desempenho de sistemas de proteção periférica (SPP) em obras de edificações / Identification of performance requirements for temporary edge protection systems for buildings

Peñaloza, Guillermina Andrea January 2015 (has links)
Na indústria da construção, as quedas de altura constituem-se em um dos tipos mais frequentes de acidentes graves. Alguns fatores contribuem para essas quedas, entre os quais se destacam a falta de qualificação dos trabalhadores, restrições de leiaute e a falta de barreiras de proteção contra quedas. Embora o uso de sistemas temporários de proteção periférica (SPP) seja uma medida importante para prevenir as quedas de altura em canteiros de obras, a literatura não apresenta um conjunto abrangente de requisitos para esses sistemas. As normas de segurança e saúde no trabalho na construção civil, tanto no Brasil como no exterior, apresentam vários requisitos aos quais os SPP devem atender. Contudo, a maioria destes requisitos são relacionados somente à resistência estrutural e à configuração geométrica, negligenciando a eficiência e flexibilidade dos mesmos, bem como não tratam dos processos de montagem e desmontagem. As limitações nos requisitos considerados em diversas fontes e a falta de métodos para verificar a conformidade dos SPP aos requisitos das normas (e outros requisitos relevantes) criam dificuldades para as partes interessadas, tais como órgãos governamentais de fiscalização, empresas construtoras, e os próprios operários encarregados pela execução dos SPP. O objetivo deste trabalho é propor um conjunto de requisitos de desempenho para sistemas temporários de proteção periférica. Estes requisitos foram identificados a partir de várias fontes de evidencia, tais como regulamentos, observações diretas de operações de montagem e desmontagem dos SPP em obras, análise de projetos de SPP, e entrevistas com especialistas. Deste modo, foi identificado um conjunto de 33 requisitos: 15 relativos à segurança, 12 à eficiência e 6 à flexibilidade. Com base nos referidos requisitos, foram avaliados 9 tipos de SPP, em 26 canteiros de obra. Estes SPP foram agrupados em três categorias de acordo com os materiais constituintes: metálicos, madeira e mistos. As principais contribuições deste estudo referem-se ao desenvolvimento de um conjunto amplo de requisitos, à análise das relações entre estes requisitos, indicando se estes podem reforçar-se mutuamente ou estar em conflito, e a proposição de um protocolo que torna claro as premissas adotadas em cada etapa da avaliação. / In the construction industry falls from height are one of the most frequent types of serious accidents. There are a number of factors that contribute for such falls, such as the lack of training for workers, layout constraints, and the lack of fall protection barriers. Although the use of temporary edge protection systems (TEPS) is an important measure to prevent falls from height in construction sites, the literature does not present a comprehensive set of requirements for those systems. Safety and health standards in construction, both in Brazil and abroad, have several requirements to which the SPP should meet. However, most of those standards are limited to structural strength and geometric configuration requirements, neglecting efficiency and flexibility, as well as do not address the assembly and disassembly processes. The limitations of requirements considered in several sources, and the lack of methods to verify the conformance of TEPS to the requirements established in standards (and other relevant requirements) create difficulties for stakeholders, such as government supervisory bodies, construction companies, and the workforce involved in the installation of TEPS. The aim of this study is to propose a set of performance requirements for temporary edge protection systems. These requirements have been identified from various sources, such as standards, direct observation od assembly and disassembly operations, analysis of TEPS design, and interviews with specialists. Thus, a set of 33 requirements were identified: 15 related to safety, 12 to efficiency and 6 to flexibility. Based on those requirements 9 TEPS solutions were evaluated in 26 construction sites. Those solutions were divided into three categories according to the materials used: metal, wood and mixed. The main contributions of this investigation refers to the development of a broad set of requirements, the analysis of the relationships between those requirements, indicating that these can either reinforce each other or be in conflict, and the proposal of a protocol that makes it clear the assumptions made at each evaluation stage.
14

Utilização de um sistema multi-agentes em redes de comunicação para a proteção digital de distância adaptativa / Using a multi-agent system in communication networks for an adaptive digital distance protection system

Breno Caetano da Silva 06 April 2009 (has links)
Esta pesquisa apresenta a implementação de um sistema de proteção digital de distância adaptativo dispondo de um sistema multi-agentes (SMA). Tal SMA trabalhará de forma distribuída, possuindo entidades especialistas (Agentes) inseridas em locais específicos e agindo de forma eficiente na solução de problemas locais. Espera-se pela aplicação deste SMA, atribuir aos relés de distância características desejáveis e difíceis de serem alcançadas pelas técnicas convencionais. Dentre as deficiências observadas nos sistemas de proteção convencionais, tem-se a não sensibilidade à dinâmica dos sistemas elétricos de potência em função das alterações nas condições operacionais. Logo, tem-se então a necessidade de um sistema de proteção mais flexível, seletivo e eficaz para assegurar a confiabilidade e a continuidade no suprimento da energia elétrica. Para desenvolver tal proposição, foram realizadas diversas e distintas simulações computacionais dispondo do software ATP (Alternative Transients Program) para a geração das prováveis curvas de operação adaptativa. Estas, quando inseridas em um banco de dados, serão representativas das esperadas alterações nas condições operacionais de um sistema elétrico em especifico. Para a implementação e validação desta abordagem, diversos testes foram realizados, tendo como finalidade a comparação desta abordagem dispondo de SMA com a filosofia tradicional de proteção de distância. Os resultados obtidos são promissores e demonstram o alto grau de precisão e confiabilidade do método proposto. / This research presents the development of an adaptive digital distance protection system by a multi-agent system (MAS). This MAS will work in a distributed way, with expert entities (agents) inserted in specific places and acting efficiently in the solution of local problems. With the application of the MAS, the distance relays will have desirable characteristics, which are difficult to be reached by conventional techniques. Among the deficiencies observed in conventional protection systems, there is the insensitivity to the dynamics of the electrical power system due to changes in operating conditions. So, there is the necessity of a protection system which is more flexible, selective and effcient to assure reliability and continuity in the electricity supply. To improve these characteristics, several computational simulations were done using alternative transients program (ATP) to generate the desirable adaptive operation curves. These curves, when inserted into a database, will represent the expected changes in the operating conditions of an electrical system. For the implementation and validation of this approach, several tests were done with the purpose of comparison of this approach (using MAS) to the traditional philosophy of distance protection. The results obtained are promising and demonstrate a highly satisfactory degree of accuracy and reliability of the proposed method.
15

Sistema de medição fasorial sincronizada aplicado à proteção de retaguarda de grandes áreas / Synchronized phasor measurement system applied to wide area protection of transmission systems

Aline Flávia Nonato da Costa 29 October 2015 (has links)
Este trabalho tem o objetivo de apresentar o desenvolvimento de uma metodologia para a proteção de retaguarda de linhas de transmissão de grandes áreas, utilizando dados de um Sistema de Medição Fasorial Sincronizada. O estudo se justifica devido à contínua expansão dos Sistemas de Transmissão, tais como os que fazem parte do Sistema Interligado Nacional. Vale esclarecer que esta expansão pode vir a dificultar a operação e controle do mesmo, o que faz com que seja necessário, um sistema de proteção cada vez mais confiável, que diminua o impacto de eventos danosos de grande porte, e que atenda aos requisitos de um sistema de proteção de grandes áreas. Neste contexto, o modelo do sistema elétrico de potência em análise foi implementado computacionalmente a partir do RSCAD, ambiente computacional e interface gráfica do RTDS® (Real Time Digital Simulator). Como principal passo, o algoritmo desenvolvido verifica a variação da potência ativa em todos os barramentos monitorados do sistema de transmissão e, de acordo com tal variação, associada ao estado dos dois extremos da linha, detecta e aponta a localização de uma situação de falta. Pelos resultados obtidos, a metodologia se mostrou eficiente na detecção e localização da falta em linhas de transmissão para sistemas de grandes áreas. Toda a metodologia desenvolvida, considerações adotadas e os promissores resultados observados serão reportados neste documento. / This work aims to present the development of a methodology for wide area transmission line backup protection, using Synchronized Phasor Measurement Systems. This study is justified due to continuous expansion of Transmission Systems, such as those which are part of the National Interconnected System. It is worth clarifying that this expansion might difficult system operation and control, which makes necessary to have an increasingly reliable protection system, that minimizes the impact of large dangerous events, and, at the same time, supplies the requirements of a wide area protection system. Within this context, the electrical system model under analysis was implemented through RSCAD, which is a RTDS® (Real Time Digital Simulator) computing environment and graphical interface. As main step, the developed algorithm verifies the active power variation in all monitored buses of the transmission system and then, according to such variation, associated with the communication of the variation state of both line sides, detects and indicates the localization of a faulting condition. According to the results obtained, the methodology has shown its efficiency in transmission line faults detection and localization for wide areas of electrical power systems. The entire developed methodology, considerations adopted and promising outcomes will be reported along this document.
16

PROPOSTA DE FILOSOFIA DE INSPEÇÃO PREDITIVA NOS CENTROS DE OPERAÇÃO PARA INSTALAÇÕES TELEASSISTIDAS / PROPOSAL OF INSPECTION PHILOSOPHY PREDICTIVE IN OPERATING CENTERS FOR TELEASSISTED INSTALLATIONS

SANTOS, Mauro Luis Aquino dos 14 February 2017 (has links)
Submitted by Maria Aparecida (cidazen@gmail.com) on 2017-04-19T14:40:10Z No. of bitstreams: 1 Mauro Luis Aquino.pdf: 3035613 bytes, checksum: fa5d18d391298888d25a933b6d6747fa (MD5) / Made available in DSpace on 2017-04-19T14:40:10Z (GMT). No. of bitstreams: 1 Mauro Luis Aquino.pdf: 3035613 bytes, checksum: fa5d18d391298888d25a933b6d6747fa (MD5) Previous issue date: 2017-02-14 / This work addresses the predictive maintenance problem in operation centers of a transmission utility. Therefore, the primordial aspects are identified for the definition of a predictive inspection routine, which allows a check of points that guarantee periodic evaluations of the power system, so that the problems that occur can be detected in advance, allowing the maintenance crew to be activated before the occurrence of failures that actually affects the operation of the system. As part of the work, a survey was carried out with some Operation Centers of power system utilities in Brazil to give an idea of the application of maintenance and inspection concepts in the current national reality. Based on the results, it is shown to what extent the inspections adopted today in the Operational Centers of the various utilities have predictive characteristics, and an evaluation is made to identify if there are improvement points or not in this area. From the inspection philosophy proposed in this research, computational developments were carried out with the aim of developing a predictive inspection methodology to be adopted by the operators in a real time environment. The tool developed was applied at the Operation Center of the São Luís, using data from São Luís III Substation of Eletrobras Eletronorte and the results are discussed in order to highlight the advantages and disadvantages of the proposed tool and if it is able to meet the proposed objectives. / Este trabalho trata o problema de manutenção preditiva em centros de operação de uma concessionária de transmissão. São, portanto, identificados os aspectos primordiais para a definição de uma rotina de inspeção preditiva, que permita uma verificação de pontos que garantam avaliações periódicas do sistema elétrico, de modo que os problemas que vierem a ocorrer possam ser detectados de maneira antecipada e com isso, permitir que a equipe de manutenção possa ser acionada antes da incidência de falhas que realmente comprometam a operação do sistema. Como parte do trabalho foi realizada uma pesquisa junto a alguns centros de operação de empresas concessionárias de energia no Brasil, para que se possa ter uma ideia da aplicação dos conceitos de manutenção e inspeção na realidade nacional atual. Com base nos resultados demonstra-se até que ponto as inspeções hoje adotadas nos Centros de Operação das diversas empresas têm características preditivas e é feita uma avaliação para identificar se há pontos de melhoria ou não nesta área. A partir da filosofia de inspeção proposta nesta pesquisa foram realizados desenvolvimentos computacionais com o intuito de desenvolver uma metodologia de inspeção preditiva a ser adotada pelos operadores em ambiente de tempo real. A ferramenta desenvolvida foi aplicada no Centro de Operação de São Luís com base nos dados da Subestação de São Luís III da Eletrobras Eletronorte e os resultados são discutidos de forma a ressaltar as vantagens e desvantagens da ferramenta proposta e se esta tem condições de atender aos objetivos a que se propôs.
17

A vida de pessoas cegas em Aracaju

Carvalho, Clarissa Andrade 09 June 2010 (has links)
Made available in DSpace on 2016-04-29T14:18:01Z (GMT). No. of bitstreams: 1 Clarissa Andrade Carvalho.pdf: 863827 bytes, checksum: ff3715d28184edc70829385cfaf4aeff (MD5) Previous issue date: 2010-06-09 / The present study reports a social experience involving blind people in Aracaju and was carried out from 2004 to 2009. This research related knowing how they organize their lives with regards to: representations, feelings, values, the belonging network and historic action. Starting from the principal that any blind person, as well as any other person, should have the possibility of leading a life of their own, and therefore ought to rely on support from the State and Society, as much as in meeting their essential needs, such as safe feeding, dwelling, education, transport, leisure, engineering and proper urban spaces, as in taking part in the socioeconomic, cultural and political organization of the country, through work and other creative activities. All subjects within this study have acquired blindness and this study derived from people s own understanding. The theoretical perspective is well-founded upon Edward Palmer Thompson, who places the subject in the center of the historical process, and regards their action as a response to their needs, which outlines their way of life. This study encompasses a qualitative approach, and life history was its methodological tool for data gathering. While depicting the ways and means by which these people organize their lives, socially interacting, constructing their practices and identities, I well hope to contribute toward improving protection and promotion measures currently adopted in Aracaju concerning this social segment / Este é um estudo sobre a experiência social de pessoas cegas em Aracaju, realizado no período de 2004 a 2009. Com esta pesquisa quis conhecer o modo como organizam suas vidas: representações, sentimentos, valores, rede de pertencimento e agir histórico. Parto do princípio de que toda pessoa cega, assim como as demais pessoas, deve ter a possibilidade de conduzir sua própria vida e de que, para isso, deve contar com o apoio do Estado e da Sociedade; tanto no atendimento das suas necessidades essenciais como segurança alimentar, moradia, saúde, educação, transporte, lazer, engenharia e espaços urbanos adequados, bem como sua participação na organização socioeconômica, política e cultural do país, através do trabalho e de outras atividades criativas. Todas as pessoas desse estudo têm cegueira adquirida e este trabalho parte da compreensão das próprias pessoas. A perspectiva teórica fundamenta-se em Edward Palmer Thompson, que traz o sujeito para o centro do processo histórico e a sua ação em resposta às necessidades, e é esta ação que delineia o seu modo de vida. É um estudo de abordagem qualitativa e a ferramenta metodológica, para a coleta de dados, foi a história de vida. Ao mostrar os meios e os modos com os quais essas pessoas organizam suas vidas, interagindo socialmente, construindo seus fazeres e as suas identidades, espero contribuir para o aprimoramento das medidas de proteção e promoção ora adotadas, em Aracaju, para este segmento social
18

Sistema de medição fasorial sincronizada aplicado à proteção de retaguarda de grandes áreas / Synchronized phasor measurement system applied to wide area protection of transmission systems

Costa, Aline Flávia Nonato da 29 October 2015 (has links)
Este trabalho tem o objetivo de apresentar o desenvolvimento de uma metodologia para a proteção de retaguarda de linhas de transmissão de grandes áreas, utilizando dados de um Sistema de Medição Fasorial Sincronizada. O estudo se justifica devido à contínua expansão dos Sistemas de Transmissão, tais como os que fazem parte do Sistema Interligado Nacional. Vale esclarecer que esta expansão pode vir a dificultar a operação e controle do mesmo, o que faz com que seja necessário, um sistema de proteção cada vez mais confiável, que diminua o impacto de eventos danosos de grande porte, e que atenda aos requisitos de um sistema de proteção de grandes áreas. Neste contexto, o modelo do sistema elétrico de potência em análise foi implementado computacionalmente a partir do RSCAD, ambiente computacional e interface gráfica do RTDS® (Real Time Digital Simulator). Como principal passo, o algoritmo desenvolvido verifica a variação da potência ativa em todos os barramentos monitorados do sistema de transmissão e, de acordo com tal variação, associada ao estado dos dois extremos da linha, detecta e aponta a localização de uma situação de falta. Pelos resultados obtidos, a metodologia se mostrou eficiente na detecção e localização da falta em linhas de transmissão para sistemas de grandes áreas. Toda a metodologia desenvolvida, considerações adotadas e os promissores resultados observados serão reportados neste documento. / This work aims to present the development of a methodology for wide area transmission line backup protection, using Synchronized Phasor Measurement Systems. This study is justified due to continuous expansion of Transmission Systems, such as those which are part of the National Interconnected System. It is worth clarifying that this expansion might difficult system operation and control, which makes necessary to have an increasingly reliable protection system, that minimizes the impact of large dangerous events, and, at the same time, supplies the requirements of a wide area protection system. Within this context, the electrical system model under analysis was implemented through RSCAD, which is a RTDS® (Real Time Digital Simulator) computing environment and graphical interface. As main step, the developed algorithm verifies the active power variation in all monitored buses of the transmission system and then, according to such variation, associated with the communication of the variation state of both line sides, detects and indicates the localization of a faulting condition. According to the results obtained, the methodology has shown its efficiency in transmission line faults detection and localization for wide areas of electrical power systems. The entire developed methodology, considerations adopted and promising outcomes will be reported along this document.
19

Aplicação de metodologias RCM nos planos de manutençao de sistemas de proteção, comando e controlo

Tavares, Helder Dinis Fernandes January 2012 (has links)
Tese de mestrado integrado. Engenharia Electrotécnica e de Computadores. Área de Especialização de Energia. Faculdade de Engenharia. Universidade do Porto. 2012
20

Identificação de requisitos de desempenho de sistemas de proteção periférica (SPP) em obras de edificações / Identification of performance requirements for temporary edge protection systems for buildings

Peñaloza, Guillermina Andrea January 2015 (has links)
Na indústria da construção, as quedas de altura constituem-se em um dos tipos mais frequentes de acidentes graves. Alguns fatores contribuem para essas quedas, entre os quais se destacam a falta de qualificação dos trabalhadores, restrições de leiaute e a falta de barreiras de proteção contra quedas. Embora o uso de sistemas temporários de proteção periférica (SPP) seja uma medida importante para prevenir as quedas de altura em canteiros de obras, a literatura não apresenta um conjunto abrangente de requisitos para esses sistemas. As normas de segurança e saúde no trabalho na construção civil, tanto no Brasil como no exterior, apresentam vários requisitos aos quais os SPP devem atender. Contudo, a maioria destes requisitos são relacionados somente à resistência estrutural e à configuração geométrica, negligenciando a eficiência e flexibilidade dos mesmos, bem como não tratam dos processos de montagem e desmontagem. As limitações nos requisitos considerados em diversas fontes e a falta de métodos para verificar a conformidade dos SPP aos requisitos das normas (e outros requisitos relevantes) criam dificuldades para as partes interessadas, tais como órgãos governamentais de fiscalização, empresas construtoras, e os próprios operários encarregados pela execução dos SPP. O objetivo deste trabalho é propor um conjunto de requisitos de desempenho para sistemas temporários de proteção periférica. Estes requisitos foram identificados a partir de várias fontes de evidencia, tais como regulamentos, observações diretas de operações de montagem e desmontagem dos SPP em obras, análise de projetos de SPP, e entrevistas com especialistas. Deste modo, foi identificado um conjunto de 33 requisitos: 15 relativos à segurança, 12 à eficiência e 6 à flexibilidade. Com base nos referidos requisitos, foram avaliados 9 tipos de SPP, em 26 canteiros de obra. Estes SPP foram agrupados em três categorias de acordo com os materiais constituintes: metálicos, madeira e mistos. As principais contribuições deste estudo referem-se ao desenvolvimento de um conjunto amplo de requisitos, à análise das relações entre estes requisitos, indicando se estes podem reforçar-se mutuamente ou estar em conflito, e a proposição de um protocolo que torna claro as premissas adotadas em cada etapa da avaliação. / In the construction industry falls from height are one of the most frequent types of serious accidents. There are a number of factors that contribute for such falls, such as the lack of training for workers, layout constraints, and the lack of fall protection barriers. Although the use of temporary edge protection systems (TEPS) is an important measure to prevent falls from height in construction sites, the literature does not present a comprehensive set of requirements for those systems. Safety and health standards in construction, both in Brazil and abroad, have several requirements to which the SPP should meet. However, most of those standards are limited to structural strength and geometric configuration requirements, neglecting efficiency and flexibility, as well as do not address the assembly and disassembly processes. The limitations of requirements considered in several sources, and the lack of methods to verify the conformance of TEPS to the requirements established in standards (and other relevant requirements) create difficulties for stakeholders, such as government supervisory bodies, construction companies, and the workforce involved in the installation of TEPS. The aim of this study is to propose a set of performance requirements for temporary edge protection systems. These requirements have been identified from various sources, such as standards, direct observation od assembly and disassembly operations, analysis of TEPS design, and interviews with specialists. Thus, a set of 33 requirements were identified: 15 related to safety, 12 to efficiency and 6 to flexibility. Based on those requirements 9 TEPS solutions were evaluated in 26 construction sites. Those solutions were divided into three categories according to the materials used: metal, wood and mixed. The main contributions of this investigation refers to the development of a broad set of requirements, the analysis of the relationships between those requirements, indicating that these can either reinforce each other or be in conflict, and the proposal of a protocol that makes it clear the assumptions made at each evaluation stage.

Page generated in 0.125 seconds