Spelling suggestions: "subject:"cistemas elétricos"" "subject:"cistemas alétricos""
91 |
Gerenciamento de potência reativa em sistemas de distribuição utilizando controlador fuzzy de fator de potênciaVianna, Marcelo Pinto January 2009 (has links)
Made available in DSpace on 2013-08-07T18:53:38Z (GMT). No. of bitstreams: 1
000412367-Texto+Completo-0.pdf: 787019 bytes, checksum: 03a6312b4b2842e6cdfc928ff5fbb9ec (MD5)
Previous issue date: 2009 / This dissertation tackles the management of reactive power in distribution systems using the concept of centralized control of power factor as a DMS (Distribution Management System) function. The methodology developed uses two fuzzy controllers in cascade with the purpose to coordinate the operation of capacitor banks and synchronous generators in the medium voltage distribution network. The aim is to ensure an adequate range of power factor and reactive power, using as control variables the power factor violation, the sensitivity of the equipment and the positions of control devices. The methodology was implemented in Matlab using the fuzzy logic toolbox. The voltage control is treated as a local controller and it is provide for voltage regulators and under load tap change transformer. Power factor violations, voltage levels and overloads are monitored for a power flow routine. The results and analysis of simulations of two distribution tests systems showed the effectiveness of the proposed model to maintain the operational limits within ranges suitable for both the electric utility and costumers. / Esta dissertação aborda o gerenciamento de potência reativa em sistemas de distribuição, utilizando o conceito de controle centralizado de fator de potência como uma função do DMS (Distribution Management System). A metodologia desenvolvida utiliza dois controladores fuzzy em cascata para coordenar a operação de bancos de capacitores e geradores síncronos existentes na rede de distribuição de média tensão, com o objetivo de assegurar uma faixa adequada de fator de potência e potência reativa, utilizando como variáveis de controle a violação do fator de potência, a sensibilidade dos equipamentos e a posição dos dispositivos de controle. A metodologia foi implementada no toolbox de lógica fuzzy do Matlab. O controle de tensão foi realizado de forma local pelos reguladores de tensão e pelo transformador com mudança de tap da subestação. As violações de fator de potência e os níveis de tensão e carregamento são verificados por uma rotina de fluxo de potência. São apresentados os resultados e análises das simulações de dois sistemas testes de distribuição que demonstraram a eficácia do modelo proposto para manter os limites operacionais dentro de faixas adequadas tanto para a concessionária de energia como para os consumidores.
|
92 |
Avaliação do potencial de conservação de energia no setor hospitalar da região sul do BrasilSilveira, Alexandre Hugo da January 2008 (has links)
Made available in DSpace on 2013-08-07T18:53:39Z (GMT). No. of bitstreams: 1
000401161-Texto+Completo-0.pdf: 3203510 bytes, checksum: 5f982969daeb4904827ef17bc67ef11c (MD5)
Previous issue date: 2008 / This study aimed to assess the potential for energy saving in the Hospital Sector in the South Region of Brazil and its impact on the mitigation of carbon dioxide emission to the atmosphere, achieved through the reduction in the consumption of electricity. The study analyzed sixteen hospitals where energy saving projects has been implemented. Each hospital has been monitored before and after the implementation of energy saving projects through energy audits conducted by the Research Group on Energy Efficiency from PUCRS. Moreover, the study used data from the IBGE and DATASUS. The estimation of energy saving and other values of interest was carried out according to methodologies based on population statistics. As the first step, it was calculated the mean values of consumption and demand before energy efficiency projects, reductions in consumption and demand after energy efficiency projects, and the necessary financial investments. All relevant data have been normalized using the number of available beds on each hospital. As a second step, through the calculation of the linear regression, it was found the estimated consumption of each of the hospitals in the South Region of Brazil. Summing up the individual data, it was possible to obtain the values for the whole population, which was in the sequence compared to the mean values in order to verify its coherence. As a result, for the whole population, it was found an annual consumption of 548 GWh of energy and a power demand of 112 MW, which could be achieved with projects aiming to improve the efficiency of the use of electrical energy. It was also found that such projects could lead to a reduction of 171. 54 GWh on the energy consumption and 43. 5 MW of power demand. However, this would also require an investment of R$ 157. 08 million. Taking into account the avoided costs for the expansion of the electrical system to meet the same power demand, this investment would be paid in 3. 6 years. Concerning environmental impacts, such energy conservation actions would allows avoiding the emission of 164 thousand tones of CO2 per year. Finally, this study shows the great importance of energy saving in the hospital sector and the benefits that actions of energy conservation would have to the society. / Este trabalho teve como objetivo avaliar o potencial de economia de energia no Setor Hospitalar da Região Sul do Brasil, bem como os impactos quanto à mitigação de dióxido de carbono na atmosfera, alcançados através das reduções no consumo de eletricidade. Para tanto a pesquisa contou com dezesseis hospitais, cada qual com seu diagnóstico energético elaborado pelo Grupo de Eficiência Energética da PUCRS. Além disso, o trabalho utilizou dados do DATASUS e do IBGE. Os cálculos para a estimação dos valores populacionais seguiram metodologias baseadas na estatística, onde, primeiramente, calcularam-se as médias aritméticas de: consumo e demanda antes de projetos de eficiência energética, reduções de consumo e demanda após as ações de eficiência energética e investimento, todos relacionados com o número de leitos disponível à internação. Posteriormente, através do cálculo da regressão linear, foi encontrado o consumo estimado de cada um dos hospitais da Região Sul do país e, somados os dados individuais, obtiveram-se os valores para a população. Estes valores foram comparados com os encontrados por meio da média a fim de se verificar a pertinência dos mesmos. Como resultados, encontrou-se para a população um consumo anual de 548 GWh e uma demanda de energia de 112 MW, onde, realizando ações de eficiência energética alcança-se uma redução de 171,5 GWh de consumo e 43,5 MW de demanda, necessitando-se de um investimento de R$ 157,08 milhões. Levando em conta os custos evitados para a ampliação do sistema elétrico no intuito de atender a mesma demanda, este investimento seria pago em 3,6 anos. No que tange aos impactos ambientais, com tais ações de conservação de energia, evita-se a emissão de 164 mil toneladas de CO2 por ano. Assim, este trabalho mostra a grande importância de se combater o desperdício de energia elétrica no setor e os benefícios que as ações de conservação de energia trariam para a sociedade.
|
93 |
Estudo de planejamento de reativos em sistemas elétricos de potência / Study of reactive planning in electrical power systemsThales Sousa 27 February 2003 (has links)
Este trabalho propõe o desenvolvimento de uma nova abordagem para a resolução do problema de planejamento de reativos em sistemas elétricos de potência. Um levantamento bibliográfico para explicitar as diferentes pesquisas realizadas nesta área foi feito. Este trabalho utiliza os multiplicadores de Lagrange obtidos da solução de um fluxo de potência ótimo, via método dos Pontos Interiores, para determinar as barras onde serão alocados reativos. A partir da determinação destas barras, um problema de programação linear para quantificar a potência reativa a ser alocada, é resolvido. Foram realizados estudos para validação e verificação da abordagem proposta nos sistemas WARD & HALE de 6 barras, sistema de 8 barras, sistema IEEE 30 e 118 barras. / The present dissertation proposes the development of a novel approach to the solution of reactive planning problem in electrical power systems. A bibliographical survey to show the different researches developed in this area was done. This study uses langrange multipliers obtained from the optimal power flow solution, through interior point method, to determine the buses where reactive power will be allocated. Starting from the determination of these buses, a linear programming problem is solved to quantify the reactive power to be allocated. Studies were carried ou for the proposed approach validation and verification in the systems Ward & Hale of 6 buses, system of 8 buses, systems IEEE of 30 and 118 buses.
|
94 |
Algoritmo baseado na equação diferencial para proteção rápida de linhas de transmissão / An algorithm based on the differential equation for fast protection of transmission linesRenata Araripe de Macêdo 24 November 2000 (has links)
Este trabalho apresenta o desenvolvimento de um algoritmo baseado na modelagem do sistema de transmissão por meio de equações diferenciais, formuladas através dos parâmetros resistência e indutância da linha de transmissão a ser protegida. Nesta abordagem não é necessário que a entrada do algoritmo seja puramente senoidal, admitindo-se a presença de harmônicos e componentes CC presentes na falta como parte da solução do problema. Utilizou-se o software ATP para a modelagem do sistema elétrico estudado e a obtenção do conjunto de dados para análise e testes, permitindo-se a representação detalhada da linha de transmissão por meio das características dos condutores e suas respectivas disposições geométricas nas torres de transmissão, além da modelagem das diversas manobras e defeitos que os afetam, buscando-se uma aproximação com uma situação real. Com relação ao uso direto das equações diferenciais para a tarefa de proteção das linhas, constatou-se que sua aplicação não produz uma estimativa aceitável para ser usada em relés digitais por possuírem convergência em tempos normalmente superiores a dois ciclos. Assim, foi feita uma filtragem das respostas do algoritmo, proporcionando-se um diagnóstico mais rápido das estimativas. Para isso foi usado um filtro de mediana de 5ª ordem para o cálculo da localização da falta. Para todos os tipos de falta testados, a estimativa da localização da falta com o uso do referido filtro mostrou-se altamente satisfatória para a finalidade de proteção, convergindo em menos de um ciclo e meio de pós-falta, após a filtragem das estimativas, imprimindo maior velocidade de resposta para os relés digitais. / The present work shows the development of an algorithm based on the modeling of the transmission system utilizing differential equations. The differential equation for the line is solved having its resistance and inductance as parameters. In this approach there is no need for the algorithm inputs to be pure sinusoidal, allowing the presence of harmonic and DC components in the line as a part of the solution to the problem. The software ATP was utilized for the modeling of the electric system under study as well as data collection for analysis and tests. This representation allowed a detailed representation of the transmission line through the characteristics of the conductors and its geometrical disposition in the transmission towers, as well as the simulation of faults that usually affect the electric system, reproducing a realistic situation. The direct use of differential equations do not give an acceptable estimation as far as digital relays are concerned because they have convergence times over two cycles. In this sense, a 5th order median filter was utilized, providing faster diagnosis for the fault location estimation. The estimation of the fault location has proved to be a coherent criteria for the algorithm. For the fault types tested, the estimation for the fault location utilizing line parameters has shown itself highly satisfactory for protection purposes. This work has shown that the algorithm oulputs converge in less than 1 and a half cycles afler the fault occurrence, presenting a much faster response for digital relays.
|
95 |
Maximização de receita de concessionária de transmissão de energia elétrica através da otimização da manutenção. / Increase of the revenue of transmission company through the otimization of the maintenance.João Emanuel Lós Reis Fidalgo 11 June 2007 (has links)
Este trabalho apresenta as principais características a serem consideradas por gestores das concessionárias de serviço público de transmissão de energia elétrica, no tocante à importância da adoção efetiva de práticas conscientes de uma Política de Manutenção dos ativos destas empresas, no sentido de promover a maximização da margem proveniente da remuneração pelo uso desses ativos. A Política de Manutenção a ser definida deve considerar os efeitos advindos das indisponibilidades tanto programadas como forçadas, que levem em consideração os diversos aspectos em termos de confiabilidade visando o máximo retorno em termos econômicos da remuneração oferecida, ou seja, a melhor relação de custo benefício entre gastos e programação com desligamentos e receita final auferida. O Plano de Manutenção, além de ser avaliado através dos custos intrínsecos de suas principais atividades, deve ser visto como o conjunto de intervenções que: reduzam as indisponibilidades provocadas por causas intempestivas; resultem em manutenções programadas que minimizem as perdas de receitas e eliminem as interrupções imputáveis a causas evitáveis, através de uma modelagem estatística de taxas de falhas de equipamentos e módulos de equipamentos que realizem em conjunto funções remuneradas nos termos do Contrato de Prestação de Serviço de Transmissão, gerando dessa maneira aumento das receitas auferidas pelas Transmissoras através de otimização das ações de manutenção. / This work presents a modeling for simulation of different Maintenance alternatives and its corresponding results in terms of expected revenue, considering: Risks of installation, imperfections and its associated interruptions; Periods resulting from nonavailability by programmed maintenance; Prevented interruptions resultant of specific actions of maintenance. Useful life of all installations, determined by the commitment between the cost of maintenance x investment in new installations. For this reason, the Maintenance Plan, besides presenting an intrinsic cost of its main activities seems like a set of interventions in the system that: reduces non-availability provoked by intempestive causes; results in programmed interruptions that reduces losses of revenues. Eliminates interruptions imputable to avoidable causes (as the cleanness absence in the right of way). By usage of types of equipment, failure rates, times of historical repairs the developed model allows a simulation of expected revenue increases through the optimization of maintenance costs.
|
96 |
Algoritmo de estimação fasorial para relés numéricos baseado no método generalizado de cancelamento por sinais atrasadosDIAS FILHO, Roberto Feliciano 31 August 2015 (has links)
Submitted by Isaac Francisco de Souza Dias (isaac.souzadias@ufpe.br) on 2016-04-26T17:51:47Z
No. of bitstreams: 2
license_rdf: 1232 bytes, checksum: 66e71c371cc565284e70f40736c94386 (MD5)
TESE Roberto Feliciano Dias Filho .pdf: 9251833 bytes, checksum: 7e69dcb3b5f2477c8820d6366c7e31ed (MD5) / Made available in DSpace on 2016-04-26T17:51:47Z (GMT). No. of bitstreams: 2
license_rdf: 1232 bytes, checksum: 66e71c371cc565284e70f40736c94386 (MD5)
TESE Roberto Feliciano Dias Filho .pdf: 9251833 bytes, checksum: 7e69dcb3b5f2477c8820d6366c7e31ed (MD5)
Previous issue date: 2015-08-31 / Neste trabalho, é apresentada uma proposta de algoritmo de estimação fasorial adaptável
em frequência (PE-A-GDSC) baseado no método generalizado de cancelamento por sinais
atrasados (GDSC). Derivado deste método inédito de estimação fasorial, propõe-se, também,
um algoritmo de estimação de impedância, inspirado no relé de distância baseado em
componentes simétricas (SCDR), mas modificado, na pesquisa realizada, para adequar-se
à formulação vetorial do PE-A-GDSC, o que originou o SCDR-GDSC. A integração do
PE-A-GDSC ao SDCR-GDSC constitui uma proposta de modelo computacional de um
relé numérico de distância simplificado baseado em GDSC, o SNDR-GDSC. Este relé
simplificado baseado no GDSC foi submetido a uma exaustiva análise comparativa de
desempenho, via simulação computacional, com um relé de distância simplificado baseado
em estimação fasorial por DFT de um ciclo. Posteriormente, o SNDR-GDSC foi embarcado
em um microcontrolador para viabilizar a etapa de validação experimental da pesquisa.
A fundamentação teórica, modelagens matemática e computacional, projeto, análise de
resultados e implementação em hardware do SNDR-GDSC são abordados ao longo dos
capítulos. / This work presents the generalized delayed signal cancelation (GDSC) method used for
estimating the fundamental frequency symmetrical component phasors (PE-A-GDSC). The
referred quantities are used in a simplified model of a numerical distance relay (SNDRGDSC),
based on an adaptation of a symmetrical component distance relay (SCDR).
The GDSC filtering characteristics allow fast frequency adaptive estimation of sequence
components even on abnormal conditions of three-phase systems. For analyzing the
proposal, its performance is compared to a simplified DFT-based distance relay to verify
its feasibility as a distance protection function. Finally, the SNDR-GDSC is embedded into
a micro-controller and exposed to real short-circuit data obtained from the buffer of a digital
fault recorder, for evaluating the performance of the hardware implementation.
|
97 |
Potencial para eficiência energética em segmentos do Polo Industrial de Manaus/AMSouza, Rafaelli Pereira de 02 October 2015 (has links)
Submitted by Divisão de Documentação/BC Biblioteca Central (ddbc@ufam.edu.br) on 2016-01-26T20:27:25Z
No. of bitstreams: 1
Dissertação - Rafaelli Pereira de Souza.pdf: 3155424 bytes, checksum: 30c412a35e88527a6c1a69eead3c7326 (MD5) / Approved for entry into archive by Divisão de Documentação/BC Biblioteca Central (ddbc@ufam.edu.br) on 2016-01-28T12:39:14Z (GMT) No. of bitstreams: 1
Dissertação - Rafaelli Pereira de Souza.pdf: 3155424 bytes, checksum: 30c412a35e88527a6c1a69eead3c7326 (MD5) / Approved for entry into archive by Divisão de Documentação/BC Biblioteca Central (ddbc@ufam.edu.br) on 2016-01-28T12:40:02Z (GMT) No. of bitstreams: 1
Dissertação - Rafaelli Pereira de Souza.pdf: 3155424 bytes, checksum: 30c412a35e88527a6c1a69eead3c7326 (MD5) / Made available in DSpace on 2016-01-28T12:40:02Z (GMT). No. of bitstreams: 1
Dissertação - Rafaelli Pereira de Souza.pdf: 3155424 bytes, checksum: 30c412a35e88527a6c1a69eead3c7326 (MD5)
Previous issue date: 2015-10-02 / CAPES - Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / The potential for energy efficiency in the industrial sector is quite significant because it is the
sector that consumes the most energy in Brazil and worldwide. In recent years, intensified
advances in energy efficiency in energy-intensive industries within the global scenario.
However, there is still significant potential for global efficiency, especially in emerging
economies. In Brazil, the socio-economic development vector of the Amazon is the Industrial
Pole of Manaus (PIM). To increase their competitiveness, manufacturers need to optimize their
production processes, reducing energy costs and losses. Considering the relationship between
efficiency and power quality in productivity and turnover of industries, it is necessary to know
how energy is being consumed and the efficiency with which the various segments of the PIM.
The objective of this study was to determine the energy efficiency indicators like the specific
energy consumption, load factor and average cost of energy as well as the determination of
power quality indicators, by analyzing the measured electrical parameters in the main consumer
systems of three industries with large representation in the regional scenario. The methodology
included field survey, implementation of energy characterization of questionnaires and electrical
measurements. The results showed that the industries had indicators of efficiency, for the most
part, better than the national average, however, it was found that most consumer industries
systems presented disorders related to power quality such as low power factor and harmonic
content. Thus, there is a potential for energy efficiency in industrial systems. / O potencial de eficiência energética no setor industrial é bastante significativo, pois é o setor que
mais consome energia no Brasil e no Mundo. Nos últimos anos, intensificaram-se os avanços em
eficiência energética nas indústrias energo-intensivas dentro do cenário global. No entanto, ainda
existe um potencial significativo de eficiência mundial, principalmente nas economias
emergentes. No Brasil, o vetor de desenvolvimento socioeconômico da Amazônia é o Polo
Industrial de Manaus (PIM). Para aumentar sua competitividade, as indústrias necessitam
aperfeiçoar seus processos produtivos, reduzindo perdas de energia e custos. Considerando a
relação entre eficiência e qualidade da energia na produtividade e faturamento das indústrias, é
necessário conhecer como a energia está sendo consumida e com qual eficiência nos diversos
segmentos do PIM. O objetivo deste trabalho foi a determinação dos indicadores de eficiência
energética como o consumo específico, fator de carga e custo médio da energia, bem como a
determinação dos indicadores de qualidade da energia, através da análise das grandezas elétricas
aferidas nos principais sistemas consumidores de três indústrias com grande representação no
cenário regional. A metodologia incluiu levantamento de campo, aplicação de questionários de
caracterização energética e medições elétricas. Os resultados apontaram que as indústrias
apresentaram indicadores de eficiência, na sua maioria, melhores que a média nacional, contudo,
foi constatado que grande parte dos sistemas consumidores das indústrias apresentaram
distúrbios relacionados a qualidade da energia elétrica, como baixo fator de potência e conteúdo
harmônico. Dessa forma, existe um potencial para eficiência energética nos sistemas industriais.
|
98 |
Ferramenta para maximização de carga na fase fluente de recomposição de sistemas elétricosViana, Eduardo Martins 13 August 2008 (has links)
Submitted by Renata Lopes (renatasil82@gmail.com) on 2017-04-24T13:25:57Z
No. of bitstreams: 1
eduardomartinsviana.pdf: 1013683 bytes, checksum: 5d87e6aef68844b7f67e1941a0337702 (MD5) / Approved for entry into archive by Adriana Oliveira (adriana.oliveira@ufjf.edu.br) on 2017-04-24T16:55:49Z (GMT) No. of bitstreams: 1
eduardomartinsviana.pdf: 1013683 bytes, checksum: 5d87e6aef68844b7f67e1941a0337702 (MD5) / Made available in DSpace on 2017-04-24T16:55:49Z (GMT). No. of bitstreams: 1
eduardomartinsviana.pdf: 1013683 bytes, checksum: 5d87e6aef68844b7f67e1941a0337702 (MD5)
Previous issue date: 2008-08-13 / CAPES - Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / Este trabalho propõe uma metodologia para auxiliar os estudos relacionados à recomposição fluente de sistemas elétricos de potência. Nesta fase inicial de recomposição, o sistema de potência encontra-se estruturado em longos corredores de transmissão e a definição de uma configuração de reatores constitui uma das estratégias adotadas para a eliminação de sobretensões. A ferramenta proposta, baseada em um modelo de otimização, visa o estabelecimento de procedimentos de rede que conduza a uma configuração mínima de reatores conectados ao sistema e a máxima tomada de carga durante esta fase de recomposição. Os diversos cenários de recomposição fluente, correspondentes à energização de novos trechos de linhas de transmissão, são representados através de subproblemas. A técnica de decomposição de Benders associada à metodologia primal-dual de pontos interiores é utilizada para solução do problema de otimização não-linear proposto. São realizados estudos de caso em ramos de recomposição fluente do Sistema Elétrico Brasileiro interligado para verificar a eficácia da metodologia. Os resultados obtidos são comparados com outros métodos propostos na literatura. / This work proposes a methodology to help the studies related to electric power systems fluent restoration. At this early restoration stage, power system is structured in long transmission corridors and the reactors set definition is one of the adopted strategies for overvoltages disposal. The proposed tool, based on an optimization model, aims the network procedures establishment leading to a minimum reactors configuration connected to the system and maximum load pick-up during this restoration phase. The various fluent restoration scenarios, corresponding to new transmission lines sections inrush, are represented by sub problems. Benders decomposition technique associated to primal-dual interior points methodology is used to solve the proposed nonlinear optimization problem. Case studies are conducted in fluent restoration branches of Brazilian Electric interconnected System to verify the methodology effectiveness. The results are compared with other proposed methods in the literature.
|
99 |
Algoritmo para restauração de sistemas de distribuição considerando medições e reduzidas informações de parâmetros da rede elétrica / Restoration algorithm for distribution systems considering measurements and reduced information of electrical network parametersRodrigues, Jonatas Marques 02 August 2015 (has links)
Submitted by Renata Lopes (renatasil82@gmail.com) on 2015-12-16T13:03:43Z
No. of bitstreams: 1
jonatasmarquesrodrigues.pdf: 2003412 bytes, checksum: fb579eea66dff19ee24178f7353acdf8 (MD5) / Approved for entry into archive by Adriana Oliveira (adriana.oliveira@ufjf.edu.br) on 2015-12-16T15:14:51Z (GMT) No. of bitstreams: 1
jonatasmarquesrodrigues.pdf: 2003412 bytes, checksum: fb579eea66dff19ee24178f7353acdf8 (MD5) / Made available in DSpace on 2015-12-16T15:14:51Z (GMT). No. of bitstreams: 1
jonatasmarquesrodrigues.pdf: 2003412 bytes, checksum: fb579eea66dff19ee24178f7353acdf8 (MD5)
Previous issue date: 2015-08-02 / CAPES - Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / Este trabalho propõe uma metodologia capaz de restaurar um sistema elétrico
radial frente a uma contingência em qualquer ponto do sistema, necessitando de poucas
informações, reenergizando o maior número de cargas possível ou trechos prioritários.
A principal contribuição deste trabalho consiste que o processo de decisão
empregado na metodologia é baseado apenas nas condições de estados das chaves e
religadores do sistema e nos dados de tensão e corrente pré-falta provenientes dos
transformadores de instrumentos do sistema, que são informações facilmente obtidas na
prática, diferentemente de outras metodologias que são dependentes de outros
parâmetros da rede, muitas vezes ausentes ou cheios de incertezas. Destaca-se que não é
necessário o conhecimento dos valores de impedâncias das linhas, demanda das cargas e
controles, dentre outras características.
A metodologia pode ser resumida da seguinte forma. A partir dos dados
adquiridos pelos transformadores de instrumentos e das ligações entre os dispositivos de
manobra, o algoritmo é capaz de identificar a área compreendida entre dispositivos de
manobra na qual o defeito ocorreu, e determinar quais barras ficam impossibilitadas de
reenergização frente a uma restauração. Após isso, é realizada a reenergização das
cargas possíveis, respeitando os limites de carregamento de alimentadores e mantendo o
sistema radial. Simplificadamente, o método é baseado em árvores de decisões. A
topologia de restauração escolhida pelo algoritmo depende de critério pré-estabelecido
pelo usuário, que pode ser o maior número de barras reenergizadas ou a reenergização
de trechos prioritários do sistema em questão. / This work proposes a methodology able to restore a radial electrical system in
front of a contingency in any point of the system, needing little information, reenergizing
the largest number of loads or priority sections.
The main contribution of this work consists that the decision process used in this
methodology is based only at the conditions of system’s switches and reclosers and of
the pre-fault voltage and current data from system’s instrument transformers, that are
information easily obtained in practice, differently of other methodologies that are
dependent of other network parameters, often absent or full of uncertainties. It can be
highlighted that in the proposed methodology it is not necessary the knowledge of the
network impedances, load demands and controls, among other characteristics.
The methodology can be summarized as follows. From the instrument
transformers acquired data and the links of maneuvering devices, the algorithm is able
to identify the area between the disconnectors devices where the fault occurs, and to
determine which bars are unable to re-energizing in front of a restoration. After this, a
load re-energizing is accomplished, respecting the feeders load limits and keeping the
system radial. The restoration topology chosen by the algorithm depends of the criteria
predetermined by the user, that can be the largest number of re-energized bars or the
reenergization of priority system sections.
|
100 |
Logística operacional: alocação de bases operacionais em distribuição de energia elétrica. / Operational logistics: facilities allocation in power distribution operations.Fontana, Heron 12 May 2015 (has links)
Ser eficiente é um requisito para a sustentabilidade das empresas concessionárias de distribuição de energia elétrica no Brasil. A busca pela eficiência deve estar em harmonia com a melhoria contínua da qualidade, da segurança e da satisfação dos consumidores e das partes envolvidas. O desafio de atender múltiplos objetivos requer que as empresas do setor desenvolvam soluções inovadoras, com a mudança de processos, tecnologia, estrutura e a capacitação das pessoas. Desenvolver um modelo operacional eficiente e uma gestão rigorosa dos custos são fatores-chave para o sucesso das empresas, considerando o contexto regulatório de revisão tarifária que incentiva a melhoria do desempenho. O modelo operacional é definido a partir da organização logística dos recursos para atendimento da demanda de serviços, que define também os custos fixos e variáveis de pessoal (salário, horas extras, refeições), infraestrutura (manutenção de prédios, ferramentas e equipamentos) e deslocamentos (manutenção de veículos, combustível), por exemplo. A melhor alocação e o melhor dimensionamento de bases operacionais possibilitam a redução dos custos com deslocamento e infraestrutura, favorecendo o aproveitamento da força de trabalho em campo, a melhoria do atendimento dos clientes e da segurança dos colaboradores. Este trabalho apresenta uma metodologia de otimização de custos através da alocação de bases e equipes operacionais, com o modelamento matemático dos objetivos e restrições do negócio e a aplicação de algoritmo evolutivo para busca das melhores soluções, sendo uma aplicação de Pesquisa Operacional, no campo da Localização de Instalações, em distribuição de energia elétrica. O modelo de otimização desenvolvido possibilita a busca pelo ponto de equilíbrio ótimo que minimiza o custo total formado pelos custos de infraestrutura, frota (veículos e deslocamentos) e pessoal. O algoritmo evolutivo aplicado no modelo oferece soluções otimizadas pelo melhoramento de conjuntos de variáveis binárias com base em conceitos da evolução genética. O modelo de otimização fornece o detalhamento de toda a estrutura operacional e de custos para uma determinada solução do problema, utilizando premissas de produtividade e deslocamentos (velocidades e distâncias) para definir as abrangências de atuação das bases operacionais, recursos (equipes, pessoas, veículos) necessários para atendimento da demanda de serviços, e projetar todos os custos fixos e variáveis associados. A metodologia desenvolvida neste trabalho considera também a projeção de demanda futura para a aplicação no estudo de caso, que evidenciou a efetividade da metodologia como ferramenta para a melhoria da eficiência operacional em empresas de distribuição de energia elétrica. / Being efficient is a requirement for the sustainability of electricity distribution companies in Brazil. The quest for efficiency must be in harmony with the continuous improvement of quality, safety and satisfaction of customers and all stakeholders involved. The challenge of attending multi-objectives requires companies in the sector to develop innovative solutions with the change of processes, technology, structure and enabling their professionals to drive this. Developing an efficient operational model and a strict cost management are keys for companies to achieve success, considering the regulatory context of tariff reviewing that encourages performance improvement. The operational model is defined from the logistics organization of resources to meet the demand of services, which also defines fixed and variable costs with people/teams (payments, overtime, meals), infrastructure (maintenance of building, tools and equipments) and fleet (maintenance of vehicles and fuel costs), for example. The best allocation and the best design of operational facilities (or operational bases) will reduce infrastructure costs and truck rolls, releasing workforce to attend customers and reducing displacements risks. This work presents a cost optimization methodology through the allocation of operational bases and teams, with the mathematical modelling of business objectives, constraints and using Evolutionary Algorithm to find the best solution, as an application of Operations Research in the field of Facility Location in electricity distribution. The optimization model enables the search for the optimal balance point that minimizes the total cost formed by infrastructure, fleet and people. The Evolutionary Algorithm applied in the model offers optimized solutions through the improvement of sets of binary variables based on genetic evolution concepts. The optimization model also gives detailed information about the operational structure and costs for a given allocation solution, using productivity and displacements (speed, distances) information to define the service regions for each operational base and resources (people, vehicles) needed to attend the demand of services, defining all fixed and variable costs for this. The methodology presented in this paper also considers the future demand of services (forecast), used in a case study that showed the effectives of this methodology as a tool for the improvement of operational efficiency in electricity distribution companies.
|
Page generated in 0.0709 seconds